HSE Risk Register - 2021

HSE99-CR-IN-RR-005-00
HSE Risk Register - 2021

INDEX
1 INTRODUCTION ....................................................................................................................................................... 4
1.1 Principles ................................................................................................................................................................... 4
1.2 Scope......................................................................................................................................................................... 5
1.3 External and internal context ................................................................................................................................... 5
2 MAIN REVISIONS IN RISK REGISTER 2021 ................................................................................................................. 6
3 APPENDIX A; ENI PAKISTAN HSE RISK REGISTER 2021 .............................................................................................. 7

HSE99-CR-IN-RR-005-00

This document is the property of Eni Pakistan. All rights reserved. 3


HSE Risk Register - 2021

1 INTRODUCTION

1.1 Principles
The purpose of risk management is the creation and protection of value. It improves performance, encourages
innovation and supports the achievement of objectives.

The principles provide guidance on the characteristics of effective and efficient risk management, communicating its
value and explaining its intention and purpose. These principles are the foundation for managing risk and are given
below;

a) Integrated

Risk management is an integral part of all organizational activities of Eni Pakistan.

b) Structured and comprehensive

A structured and comprehensive approach is adopted for risk management that contributes to consistent and
comparable results.

c) Customized

The risk management framework and process are customized and are made proportionate to the organization’s external
and internal context related to its objectives.

d) Inclusive

Appropriate and timely involvement of stakeholders enabled their knowledge, views and perceptions to be considered.
This will result in improved awareness and informed risk management.

e) Dynamic

Risks can emerge, change or disappear as an organization’s external and internal context changes. Risk management
can anticipate, detect, acknowledge and respond to those changes and events in an appropriate and timely manner.

f) Best available information

The inputs to risk management are based on historical and current information, as well as on future expectations. Risk
management explicitly takes into account any limitations and uncertainties associated with such information and
expectations. Information is made timely, clear and available to relevant stakeholders.

g) Human and cultural factors

Human behavior and culture significantly influence all aspects of risk management at each level and stage.

h) Continual improvement

Risk management is continually improved through learning and experience.

HSE99-CR-IN-RR-005-00

This document is the property of Eni Pakistan. All rights reserved. 4


HSE Risk Register - 2021

1.2 Scope
Eni Pakistan Limited, a business unit of Eni Upstream, is successfully involved in exploration and production of gas in
Pakistan since many years and conducts following activities in its operated fields:

Drilling (onshore)
Gas Production & Processing
Development projects related to engineering & construction of gas processing plants and wellheads.
Apart from the operated fields, the Company is also non-operated partner in some other gas production fields in the
country.

Eni Pakistan has developed an HSE Integrated Management System (IMS) to manage all pertinent aspects of business
in line with its HSE Policy, ISO 14001, ISO 45001, & ISO 39001 Standards, ISO 31000 Guidelines and HSE Management
System Guidelines issued by its HQ.

To ensure the continuity of all areas of Company business, HSE Risks are assessed and managed on continuous basis. A
comprehensive exercise is carried out on annual basis for review of Eni Pakistan HSE Risk Register and its outcome is
shared with Eni HQ.

1.3 External and internal context


The Eni Pakistan’s external context are;

the social, cultural, political, legal, regulatory, financial, technological, economic, health and environmental factors,
whether international, national, regional or local;
key drivers and trends affecting the objectives of the organization;
external stakeholders’ relationships, perceptions, values, needs and expectations;
contractual relationships and commitments;
the complexity of networks and dependencies.
The internal context is;

vision, mission and values;


governance, organizational structure, roles and accountabilities;
strategy, objectives and policies;
the organization’s culture;
standards, guidelines and models adopted by the organization;
capabilities, understood in terms of resources and knowledge (e.g. capital, time, people, intellectual property,
processes, systems and technologies);
data, information systems and information flows;
relationships with internal stakeholders, taking into account their perceptions and values;
contractual relationships and commitments;
1.4 Risk criteria
It is defined as Risk Matrix in Eni Pakistan Risk Register sheets.

HSE99-CR-IN-RR-005-00

This document is the property of Eni Pakistan. All rights reserved. 5


HSE Risk Register - 2021

2 MAIN REVISIONS IN RISK REGISTER 2021

The main points of revision are given in the following tables:

Residual Risk @
Hazard Category Risk New Measures to be Implemented
30/06/2022
1.1.3 Terrorist Activity 1. Installation of High Density searchlights on Pak Rangers,
/Sabotage/ Bunkering Police & Eni patrolling Vehicles.
B1 (CI) B1 (CI)
2. Provision of additional Ground Metal Detectors to
patrolling vehicles.

2.2.2 Surface
contamination
1. E&P activities. Skimming, collection, transportation and disposal of
2. Spillages during produced water / oily emulsion from evaporation ponds of
B2 (CI) Bhit plant & wellheads to be included in scope of work of B2 (CI)
diesel / condensate
haulage activity. new waste management contract.

3. Leakage of oil &


chemicals
Thorough risk assessment should be performed to re-
3.1.6 Blowout risk A5 (RRM) evaluate the need of SSSVs considering the current pressure A5 (RRM)
regime of wells.

3.3.1 Lack of emergency


preparedness Standalone smoke detector units to be installed rather
(firefighting, spill clean- B3 (RRM) B2 (CI)
connect them to the main DCS unit for centralization
up, security support,
evacuation)

3.3.2 Lack of Trainings for emergency coordinators, on scene


communication for B3 (RRM) coordinators and RRT leaders to be carried out after recent B2 (CI)
emergency planning organizational changes

Risk rating of following hazard categories has been revised after performing risk re-evaluation exercise considering the
existing controls, HSE Statistics and current operational conditions.

Risk Risk
2020 2021
Hazard Category
Inherent Risk Residual Risk Inherent Risk Residual Risk

2.1.1 Continuous
discharges to air (air
quality C2 (RRM) C1 (CI) C1 (CI) C1 (CI)
requirements)

HSE99-CR-IN-RR-005-00

This document is the property of Eni Pakistan. All rights reserved. 6


HSE Risk Register - 2021

2.3.4 Pollution from


radioactive waste
(TENORM or B3 (RRM) A3 (CI) A3(CI) A3 (CI)
radioactive sources)

2.4.1 Continuous
discharge to water
(legislative B2 (CI) B2 (CI)
C2 (RRM) B2 (CI)
requirements,
drainage systems,
oil/water separation)
2,8 Other (HSE Legal
Compliances,
D2 (RRM) B2(CI) C1(CI) C1(CI)
Noise)

3.1.3 Risk of stored


flammables
A4 (RRM) A3 (RRM) A3(CI) A3(CI)

3.2.4 Heavy Lifting


C2 (RRM) C2 (CI) B2 (CI) B2 (CI)

3 APPENDIX A; ENI PAKISTAN HSE RISK REGISTER 2021

HSE99-CR-IN-RR-005-00

This document is the property of Eni Pakistan. All rights reserved. 7


Residual Risk @
In case there is no evidence of control in place - Reactive Method (see attached Risk Screening
Controls/Barriers in Place Reliability of Control in Place - Predictive Method (see attached Risk Screening Matrix - Table 1)
Matrix - Table 2)
Current Risk Figures Measures to be Implemented 30/06/2022
Responsibility Assigned for
Deadline for Close-out
Risk Area Hazard Category Impact Has the event already Has the event already Has the event already Has the event already Measure Implementation
(dd/mm/yyyy)
Opportunities
Is the control independent from (i.e.: Does 3 years accident Is this control covered by (indicate Dept.)
Is this control subject to occurred at least once occurred several times occurred several times occurred several times
Preventive doesn't rely on) previous one/ones (if records show failure of this technical Preventive /
/ Recovery
Description yes tick the box, otherwise jump to control has been a specifications/dedicated
periodical maintenance or in the last 10 years in in the last 10 years in a year in the Company? a year in one facility? Frequency Severity Risk
Recovery
Description Frequency Severity Risk
periodical review/audit? the Company? the Company? Probability = D Probability = E
the next question) contributor to an event? work instruction?
Probability = B Probability = C
1. Social Aspects

OC 1. Safe systems of work


1. Community Relations (CR) guidelines are in place for all operational areas where Eni Pak operates.
1.1.1 Hostile communities/media 2. Local manpower attendance management system implemented at Bhit Gas Plant.
1. Pressure from Local / Political factors 3. Stakeholder Engagement Procedure in place.
P - - -
2. Frequent demands of job and economic 4. Local Community Complaint Handling Procedure in place.
opportunities 5. Procedure- CR Contigency Plan in place.
3. Escalation in Interruption to E & P 6. Equitable Jobs and Economic Benefits to Local Community.
activities 7. Rangers Deployed at Bhit & Badhra field to control Law & Order situation in the field
4. Inter-tribal and intra-tribal conflicts
5. New area of operations (addition of new B 1 CI B 1 CI
People
communities)
6. Pressure due to exit strategy OC1.10. Staff/ Contractor Competency ✓ - ✓
P
7. Non-implementation of revised social 1. Implementation/ monitoring of community relations guidelines by CR representatives.
welfare guidelines issued by DGPC 2. Dedicated CR resource assigned on every E&P project for effective community engagement.

OC2.5. Community program (education, dialogue, welfare, health)


1. Measures have been taken for capacity building of local community through fit for purpose interventions.
2. Monitoring and Evaluation Procedure in place. ✓ - ✓
P
3. Proactive engagement with social welfare committees to manage the social welfare guidelines issued by DGPC.
4. Sustainable (social welfare initiatives) exit strategy developed.
5. Stakeholder engagement with local communities' notables, DGPC, DCs etc. implemented.

OC1.10. Staff/ Contractor Competency


P 1.Proactive liaison with agencies to remain abreast with situational developments ✓
2.Contingency Rehearsals

1,1 Communities
& Security OC2.1. Hazard & Risk Management
1. Security manpowerfor static posts, escorting , patrolling and deployment at bunkers constructed for unforeseen incidents continues.
1.1.3 Terrorist Activity /Sabotage/ 2. Additional active support of Police in terms of manpower and police mobiles
Bunkering 3. Security policy implemented and security induction (security awarenss / clean desk policy) given to all staff
1. Prolonged confinement / detention during 4. Gate pass and access control
extended road blocks 5. A separate system software "e-page" is in place for effective reporting & Management of Security incidents.
2. Harassment through aerial / direct firing 6. Reporting and liaison with CPLC, Police is implemented as presence of police personnel (24/7) at field locations, visits of agencies’
3. Extortion representatives and meeting with head of Law Enforcement Agencies.
4. Theft cases within company premises Security Manager 31-Dec-21
7. Risk Assessments are carried out as per the expected contingencies and their actions are followed up.
5. Sabotage 9. Security Management Plan for Fields in place. 1. Installation of High Density searchlights on Pak Rangers, Police & Eni Patroling Vehicles.
6. Activity Interruption 10. Prior approval and armed escort is must for all road movements outside the concession area. B 1 CI B 1 CI
People P
7. Kidnapping P 11. Survey of Routes leading to field locations carried out on annual basis or as per situation demand. - ✓ ✓
2. Provision of additional Ground Metal Detectors to patroling vehicles.
8. Scuffle 12. Annual firing practice for security guards at all locations in place.
9. Threatening calls to employees 13. Proactive liaison with agencies to remain abreast with situational developments.
10. Increased theft vulnerability due to 14. Increased police and rangers presence & patrolling in the area.
considerable security manpower reduction 15. Contingency Rehearsals.
11. Plantation of spikes/Nails on access 16. Deployment of Pak Rangers Troops and establishment of Ranger's Static Security Posts at Bhit Gas Plant.
roads & Choke points by the culpirts. 17. Increased Rangers and Police patroling in vulnerable areas.
18. Due to reduction in security manpower amid COVID-19, effecting monitoring and patrolling is ensured for all below unmanned locations in order
to avoid /avert the risk of possible theft/intrusion by the opportunist outlaws :
Wellheads (Bhit 9, 15, 2, & Badhra 6) , Traffic Posts Badhra 1 & 2.
19. Security surveilence & Monitoring system on 24/7 hours basis.
20. Provision of a Ground Metal Detector in order to search hidden spikes and nails planted by culpirts on access roads.

HC2.5. Temporary Refuges


1. Safe Heavens at all locations
P 2. Rules of engagement and Voluntary Principles of Security and Human Rights-VPSHR and its annual training in place.
3. Bullet resistant outposts for guard force
4. Bullet proof jackets for the guard force
OC2.1. Hazard & Risk Management
1. Anticorruption reporting to Anticorruption Compliance function as per applicability
Non Compliance to Anti Corruption Laws & 2. Reporting of Gifts and Hospitalities A 1 CI A 1 CI
People P
Regulations 3. Reporting of Interaction with Relevant Subjects(Public & Private Entities)
4. Local Porcedure 'Reporting of Interaction with Relevant Subject local' is implemented
1.2 Workforce
5. Delegation of Authority to support procurement
Ethics

1. Eni Code of Ethics


Litigations against company Reputation P 2. Eni Policies on People A 1 CI A 1 CI
3. Grievances handling & Management

2. Environment

HC1.2. Process Control Equipment/System - ✓


P
1. Elevated & Ground Flare System with engineering controls for minimum flare.
OC1. Safe Systems of Work
P 1. Operational philosophy/procedural control implemented. ✓ ✓ ✓

2.1.1 Continuous discharges to air (air


quality requirements) OC1.2. HSE / Process Safety rules for Well/Production/Logistics Operations/TENORM/Electromagnetic-optical radiation Monitoring
1. Diesel Operated Equipment & Vehicles 1. Monitoring of Emissions to ensure compliance of SEQS.
emissions 2. Project specific HSE contractual guidelines covering environmental monitoring are issued with all service contracts as a mandatory requirement.
2. Gas Turbines, Power Generators, 3. GHG monitoring, accounting and reporting to HQ on monthly/semester basis. 1 CI
Environment C 1 CI C
engines exhausts 4. Mechanism for third party certification of all equipment & vehicles is in place
3. Vents & Flares 5. Environmental Management Plan (EMP) is implemented.
2,1 Emissions 4. Fugitive emissions 6. Maintenance Management system of all facilities is in place.
P ✓ ✓ ✓
5. Release of Ozone Depleting Substances 7. Periodic Maintenance of Contractors' equipment & vehicles
6. CO2 emissions from Amine Unit 8. Fugitive Emissions Monitoring Campaign carried out at Plant and Bhit wellheads.
9. Single gas turbine operations due to PV plant integration.
10. Electrification of Camp-4 shifted from diesel engines to reduce emission.
11. R22 phase out plan has been prepared (and partially executed) for Bhit Gas Field in line with Montreal Protocol.
12. Bhit & Badhra gathering lines integrity is being maintained through cathodic protection monitoring along with continous corrosion inhibitor injection
13 Compressors having more emissions are not functional due to operational reasons or requirements

HC1.2. Process Control Equipment/System


2.1.2 Emergency/Upset discharges - ✓ ✓ C 1 CI
Environment P 1. High Pressure Vent Stack and flare for abnormal operating conditions. C 1 CI
(GHG emissions requirements)
2. ESD System is in place.

HC1. Equipment
Environment P 1. Closed drainage system in place - ✓ ✓
2. Effective monitoring through Monitoring Wells to ensure the ground water quality remains unchanged due to produced water injection.

2.2.1 Underground contamination


1. Leakage of produced water OC1.4. Start-up, shut-down, operating procedures (e.g. Permit-to-Work System)
1. Preventive Maintenance Plan in place and implemented to ensure the mechanical integrity of the storage facilities at Plant. B 2 CI B 2 CI
Environment P - ✓ ✓
2. Local operating instructions / procedures are in place and implemented.
3. Intelligent Pigging of Bhit gathering line carried out & mitigation actions were taken.

OC2.1. Hazard & Risk Management


2,2 Spills - ✓ ✓
Environment P 1. Spill risk evaluation carried out for all Eni Pakistan operations.
2. Mitigation measures recommended in IEE/EIA studies for major plant modifications / exploration / drilling activities implemented.

OC2.1. Hazard & Risk Management


1. Third party hydro / pressure testing of diesel / condensate bowsers is made part of HSE Guidelines.
2.2.2 Surface contamination
2. Emergency Response Plan / Procedure for oil/chemicals spill management in place.
1. E&P activities. Option of extracting crude oil, comprised of
3. Spill emergency handling training of Eni Pakistan Site Emergency Response teams is carried out. - ✓ ✓ 1.. Arrangments to be made for 24" Gathering Line defect repair and strategy to be devised for online repair. E&C Coordinator 30-June-22 B 2 CI
2. Spillages during diesel / condensate Environment P B 2 CI P heavy hydrocarbons, from produced water
4. Procedure "Oil spill contigency plan" for onshore operations in place. .
haulage activity . / oily emulsion to be explored.
5. Oil spill kits available to handle minor oil spills. 2. Skimming, collection, transportation and disposal of produced water / oily emulsion from evaporation ponds of bhit plant & wellheads to be HSE Manager 30-June-22
3. Leakage of oil & chemicals
6. Secondary containment for oil & chemical storage at all locations. Kerbing/ sumps provided as required. included in scope of work of new waste management contract.
7. Adequately designed warehouse building to store all chemicals, lubricants and other hazardous materials.

HC1.2. Process Control Equipment/System


1. Produced Water Treatment System in operation
2. Produced Water disposal into reservoir through injection well - ✓ ✓
Environment P
3. Proper waste pits are designed and prepared for drilling/workover operations.
4. Design / Lay out of Well site is of approach with minimum traffic & topography disturbance.
5. Analysis of samples from waste pits for treatment and disposal of waste (with values above limits).

2.3.1 Pollution from operational wastes OC1.1. Activity / Product / Service information (process, design, changes, risk data, well monitoring, drawings
1. Minimum Hazardous waste generation by ensuring smooth operations and following best industry practices. B 2 CI B 2 CI
2. Effective waste segregation (Hazardous & Non Hazardous) through contracted service.
3. Waste pits management assessment for onshore operations is carried out & recommendations in place.
4. Waste disposal through 3rd party waste management contractors. ✓ ✓ ✓
Environment P
5. Periodic inspection plan for Produced Water injection pipe line developed & implemented.
6. Procedure " Waste Management " for onshore operations in place.
7. Drill cuttings stored in lined pits at all locations.
8. Used oil handed over to SEPA authorised / approved contractor for proper disposal

OC1.8. Contract HSE Requirements


2,3 Wastes Environment P 1. Effective waste segregation & management (Hazardous & Non Hazardous) through 3rd party waste management contractors. - ✓ ✓ B 2 CI
Mechanism for generation of revenue B 2 CI
through handover of recyclable waste to
2. Karachi Office waste managed through Cantonment Board Clifton (CBC)
2.3.2 Pollution from domestic wastes approved waste contractor in place.
HC1.2. Process Control Equipment/System
People P 1.Waste pits management assessment for onshore operations is carried out & recommendations in place. - ✓ ✓

Practice of reusing treated camp waste B 2 CI


2.3.3 Pollution from sanitary wastes B 2 CI
water for gardening in STP area in place.
HC1.2. Process Control Equipment/System
Environment P 1. Sewerage Water Treatment System in operation - ✓ ✓
2. Sludge removal activity at New STP area has been performed, hence efficency is improved and serving current operational requirements

OC2.1. Hazard & Risk Management


1. TENORM (Technologically Enhanced Naturally Occurring Radioactive Materials) assessment carried for Bhit & Kadanwari.
2.3.4 Pollution from radioactive waste 2. Action plan of TENORM Assessment of Bhit & Kadanwari is implemented. - ✓ ✓ A 3 CI
People P A 3 CI
(TENORM or radioactive sources) 3. Management of Radioactive source at E&C and drilling activities is carried out as per safety requirements.
4. Calibration of TENORM monitoring equipment is done through PINS tech. (Pakistan Institute of Nuclear Science and Technology)
5. Implementation of standard operating procedure and supervision is in place

HC1.1. Item or assembly layout / route


Environment P 1. Produced Water Treatment system is in operation - ✓ ✓ Produced water reinjection at Bhit is
2.4.1 Continuous discharge to water
2. Produced Water disposal into injection well (pab formation). minimizing the heavy vehicular movement
(legislative requirements, drainage
for transfer of produced water to
2,4 Production systems, oil/water separation) CI
B 2 CI evaporation ponds. B 2
water 1. Produced Water spillages, leakages etc. 2. Heavey hydrocabon recovery from
from Condensate/Gas Production produced water
OC1.1. Activity / Product / Service information (process, design, changes, risk data, well monitoring, drawings)
(plant & wells)
1. In case of abnormal operations remote production well's produce water stored in lined pit temporarily Bhit/Kadanwari. ✓
Environment P
2. Operating instruction issued to keep the pits at minimum possible (max 50% of total depth) for management of escalation (overflow) due to rain.
3. E&C project of facilities for re injection of produced water from compression units at remote well head location completed.

OC1.3. HSE / Process Safety rules for Construction & Commissioning - ✓ ✓


Environment P
1. Monitoring by Independent Monitoring Consultant (IMC) in Kadanwari drilling operation in place.
A 2 CI A 2 CI
2.5.1 Impacted area (footprint) OC2.8. EHS Impact Assessment
Footprint - Damage to topography at Environment P 1. Mitigation measures recommended in IEE/EIA studies for major plant modifications / exploration / drilling activities implemented to prevent ✓ ✓ ✓
wellheads & at quarry points damage to topography.

2,5 Facility OC2.5. Community program (education, dialogue, welfare, health)


Impact 1. Wood cutting / burning in the leased area is discouraged.
2. Eni guidelines for Biodiversity implementation / compatibility with Eni operations implemented. - ✓ ✓
Environment P
2.5.4 Vulnerable fauna and flora 3. Integrity of water monitoring wells at Bhit is checked on periodic basis.
Impact of Production, Onshore Exploration 4. Green campaign of tree plantation launched at Bhit & Kadanwari Field. A 1 CI A 1 CI
& Drilling Activities on flora and fauna 5. Biodiversity and eco system survey carried out in 2012/action plan implemented

OC2.8. EHS Impact Assessment ✓ ✓ ✓


Environment P
1. Environmental Management Plan (EMP) of Initial Environmental Examination (IEE) & Environmental Impact Assessment (EIA) in place.

OC2.8. EHS Impact Assessment


1. Mitigation measures recommended in IEE/EIA studies for major plant modifications / exploration / drilling activities implemented with regards to
wild/marine life protection, minimal use of natural resources (ground water, surface water, etc.) & implementation of restoration plan.
2.6.1 Reduction of indigenous - ✓ ✓ A 1 CI
2,6 Biodiversity Environment P 2. Ambient air quality monitored on regular basis for Bhit & Kadanwari Gas Plant, wellheads and surrounding areas. A 1 CI
biodiversity
3. Biodiversity study carried out for Enipak E&P Operations & actions are implemented.
4. Green campaign of tree plantation at Bhit & Kadanwari Field.
5. Implemented outcome of Biodiversity Survey Report for Bhit & Badhra Field.

2.7.1 Ground structure HC1.1. Item or assembly layout / route - ✓ ✓ A 2 CI


Asset P A 2 CI
1. Engineering design considerations
2,7 Subsidence
2.7.2 Foundations HC1.1. Item or assembly layout / route - ✓ ✓ 3rd Party assessment of foundations and secondary containment areas was carried out and its action plan to be executed E&C Coordinator 30-Jun-22 A 2 CI
Asset P A 2 CI P
1. Engineering design considerations

OC1. Safe Systems of Work


1. Eni Pakistan Procedure for HSE Legal Requirements in place.
Reputation P 2. Eni Pakistan HSE Legal Register in place. - C 1 CI C 1 CI
3. HSE Legal Register is reviewed and updated annually.
4. Audits for HSE Legal Compliance Evaluation are carried out as per Annual HSE Audits Program.
Non Compliance to HSE Legal
Requirements

OC2.1. Hazard & Risk Management


Environment P C 1 CI
2,8 Other (HSE 1. Compressors having more emissions are not functional due to operational reasons or requirements
Legal
Compliances,
Noise)
HC1.1. Item or assembly layout / route
1. Engineering controls provided (acoustic proofing). - ✓ ✓ ✓
1. Noise from generators, compressors, People P
2. Mandatory signage provided according to noise monitoring data.
plant noise, noise during emergency 3. Boundaries of Wellhead Compression areas are extended to ensure noise levels meet plant standards.
venting, gas venting from wells
(including all wellhead compression OC1. Safe Systems of Work B 2 CI B 2 CI
equipment.) 1. Noise and Environment surveys carried out.
2. Aircraft noise 2. Controls of Permit to work system applied at high noise areas.
People P 3. High noise areas mapped on plant layout drawings. ✓ ✓
4. Corrective and Preventive maintenance carried out.
5. Noise monitoring survey carried out for both Bhit Plant & Karachi office facilities.
6. Noise level monitoring at Bhit Air Strip is carried out.
3. Safety
HC1.8. Other (specify) ✓ ✓
P
1. Cathodic Protection and corrosion monitoring programme in place
3.1.1 Loss of Primary Containment
(lack of process control, OC3.5. Preventive Maintenance Management System
erosion/corrosion, process stress) Asset 1. Preventive and corrective maintenance programs in place. CI CI
B 2 B 2
1. Leakage from gathering line / process 2. Flow line thickness measuring program in place. ✓ ✓
P
facilities 3. Additional controls dedicated at Kadanwari flow lines like: CI dosing rate dynamic adjustment, LRUT , review of corrosion and inspection
philosophy.
4. Intelligent Pigging of Bhit gathering line carried out and based on findings affected pipeline has been replaced.

OC2.1. Hazard & Risk Management ✓ ✓ A 3 CI


3.1.2 Manning inconsistent with design Asset P A 3 CI
1. BART Review Implementation.
and operations philosophy
HC2.3. Liquids containment and drainage system
1. Hazardous drain systems different from non-hazardous ones.
2. Bunding at all fuel/oil storage facilities
3. Harardous Area Classification implemented to control potential ignition sources.
4. High level protection switches installed on flammable liquids storage tanks.
- ✓ ✓ 3rd Party assessment of foundations and secondary containment areas was carried out and its action plan to be executed (same as in E&C Coordinator 30-Jun-22 A 3 CI
3.1.3 Risk of stored flammables Asset R 5. Vacuum breaker installed on storage tanks A 3 CI P
Hazard Category 2.7.2)
6. Nitrogen blanket available for stroage tanks
7. Grounding protection avaialable.
8. External thickness monitoring carried out as per plan.
9. Visual inspection of tanks / bunded area on regular basis

OC2.1. Hazard & Risk Management


P 1. No ignition source allowed to enter in hydrocarbon area through strict control & vigilance. - ✓ ✓
2. Spark arrestors installed on generators & vehicles in classified areas.

HC3.6. Fire Detection System


F&G detectors of some wellhead compressors are not linked with ESD of interconnecting wellheads specially on Badhra by inter-trip. (Inter-
1. Fire detectors and gas detectors are linked to the ESD system ✓ ✓ ✓ E&C Coordinator
P trip signal to be configured for standalone wellheads connected with BC/WHC units). 30-Jun-22
2. Active Fire & Gas detection system in place with effective maintenance, critical elements highlighted.

OC3.6. Other (specify)


3.1.4 Risk of ignition (fire, explosion, 1. HSE risks are critically reviewed and addressed in Assurance Reviews, FEED, PEER Reviews & HAZOP studies.
flash-fire) People P A 4 RRM A 3 CI
2. Bhit Safety Case developed and its recommendations are implemented.
3. Bhit Wellhead compression facilities & Badhra wellsite are updated in Bhit Safety Case.
4. Asset Integrity Management System developed for Bhit-Badhra Gas Plant on the basis of Bhit BART Review findings.
5. Performance standards for safety critical equipment are defined and these equipment are aligned on defined performance standards. ✓ ✓ ✓
3,1 Process
6. Bhit Plant Insurance Risk Survey conducted.
Safety 7. Golden Rule Implemented and e-Gruvis Site visits by using checklist implemented.
8. All possible escalations of Process Safety Incidents are considered in ERP.
9. Fire suppression system in place at Bhit Plant.
10. PTW system implemented.

OC1.9. Training & Awareness


1. Periodic Training of relevant resources related to 'Process Safety Management' is carried out.
P 2. Periodic Training of relevant resources related to 'HAZOP' is carried out.
3. Risk assessment training (e.g. High field Risk Assessment' of relevant resources is carried out.

3.1.5 Risk from layout (lack of HC1.1. Item or assembly layout / route
1. Well designed layout with emergency escape routes marked.
containment, module proximity,
2. Exit sign boards displayed prominently. - ✓ ✓ A 3 CI
unfavourable wind directions, wrong People P A 3 CI
3. Mustering area allocated at safe distances.
escape routes and mustering)
4. Safe distances maintained on the basis of Bhit BART Review findings.
5. Wind socks provided with clear visibility from all directions / distance.

HC3.2. Emergency well isolation system (BOP, SSSV) different from process / equipment control system
- ✓ ✓ Well Ops. Manager / Production
Asset R 1. Sub-surface Safety Valves provided on all wells (except 4 wells at Bhit (Low Pressure Compressor Assisted wells). P Thorough risk assessment should be performed to re-evaluate the need of SSSVs considering the current pressure regime of wells. 30-Sep-21
Manager
2. Blowout preventors (BOP) are used while drilling.

OC1. Safe Systems of Work


3.1.6 Blowout risk 1. Periodic training on well control for drilling staff.
1. Well blowout 2. Comprehensive list of safety critical equipment/ devices developed and documented. Preventive Maintenance (PM) frequencies for each
A 5 RRM A 5 RRM
2. Sabotage act at Wellhead / flowlines equipment is determined to ensure the reliability.
3. Escalation of Emergency 3. Blowout emergency response procedure developed & tested for onshore activities
4. Developed dedicated plans (Blowout ERP and Oil spill contingency plan) for international equipment mobilization.
Asset P 5. All possible escalations are taken in to account in ERP.
6. Drilling program validation
7. Sharing significant changes to operating activities to HQ.
8. Drilling programme, with impacts on safety margins.
9.Technical aspects and HSE performance of contractors taken priority on economic aspects.
10. Personnel involved in operating activities are well trained and expert
11. Installation of dual kill and choke line

HC3.2. Emergency well isolation system (BOP, SSSV) different from process / equipment control system ✓ ✓ ✓ A 3 CI
Asset P A 3 CI
3.1.7 Risk of inhibits/overrides of 1. Well locations are provided with local & remote shut down facilities for safety.
safety critical elements
OC1.4. Start-up, shut-down, operating procedures (e.g. Permit-to-Work System) - ✓ ✓ A 3 CI
Asset P A 3 CI
1. PTW (Safety Defeat Certificate)

HC1.5. Risk monitoring (EG: black box, IVMS, flight follow, navaids) - ✓ ✓ ✓
People P
1. Annual calibration of navigational instruments is carried out by CAA.

OC1. Safe Systems of Work


1. Logistics Management Procedure in place.
People P 2. Formal risk assessment carried out for Bhit Airfield Operations with the involvement of air carrier. ✓ ✓ ✓
2. Verification of Air Chartered services and Bhit airstrip facilities through third party Audit.
3. The ACCL list is being analyzed and forwarded to Travel Desk for safe business travel arrangements.
3.2.1 Air transportation and
communication risk
OC1.8. Contract HSE Requirements
1. Air Crash ✓ ✓ ✓ ✓
People P 1. Eni aviation standards are part of aviation contract. Technical Specifications (regulatory and company standard) incorporated in contract. A 4 RRM A 4 RRM
2. Poor Communication
2. Periodic inspection of Bhit airstrip conducted by Civil Aviation Authority (CAA) as per renewal procedure.
3. Incompetence
4. Post accident emotions / shocks
5. Affects on Business Continuity
OC1.9. Training & Awareness ✓ ✓ ✓ ✓
People P
1. Refresher of Aviation related training courses for Bhit Field's ground staff carried out.

OC2.1. Hazard & Risk Management


1. Passengers complaints handled through feedback forms during each trip.
2. Aviation Advisor specific for Eni Pakistan flight operations. ✓ ✓ ✓ ✓
People R
3. Travel on PIAC ATRs is temporarily suspended.
4.Limit of maximum number of members from Management that can travel in one commercial aircraft is defined & implementation is in place.
5. Risk Assessment for Aviation operation specificaly for spot charter services in place.

OC1. Safe Systems of Work


1. Implementation of Land Transportation Manual.
2. Eni Pakistan Driving Policy in place.
3. Risk Assessment of overall transportation facilities of Eni Pakistan are conducted & implementation is in place.
4. Implemented Road Traffic Safety Management System as per ISO 39001.
5. Logistics Management Procedures in place.
6. Routine repair works are carried out.
People P 7. Due to increased road travel more comfortable transportation means (big bus) for staff changeover arranged to minimize the physical fatigue and - ✓ ✓ ✓
stress level.
8. Periodic audits of all contractors' vehicles and drivers are carried out.
9. Only licensed drivers are allowed to drive.
3.2.2 Land transportation and 10. Journey management plan in place.
communication risk 11. Periodic audits of all contractors' vehicles and drivers are carried out.
1. Road Accidents 12. PM plans for vehicles in place
2. Poor Communication 13. Periodic road surveys are carried out to access road condition.
3. Incompetent drivers OC1.9. Training & Awareness C 2 RRM C 2 RRM
4. Increased Land travel for intercity 1. Regular Training on Defensive Driving for Company/Contractor drivers.
People P ✓ ✓ ✓
movements in the absence of Air Charter 2. Awareness sessions on driving safety are carried out.
service 3. Periodic Training of relevant resources related to ISO 39001 - Road Traffic Safety Management System is carried out
5. Business discontinuity
OC2. Hazard-specific formal protocols
1. Land Transportation Risk Assessment conducted
2. Annual HSE Audits program in place.
3.HSE Personal Commitment (site visits) program for leadership team in place.
4. Implementation of recommendations of ISO 39001 Gap Analysis.
5.Comprehensive RTS Procedure developed and implemented. ✓ ✓ ✓
People P
6. E-Gruvis Inspection plan in place.
7. Vehicle Tracking System on all Eni and contractor vehicles in place.
8. Passengers complaints handled through feedback forms during each trip.
9. Daily inspection checklist is filled by contractor drivers.
10 Risk Assessment for by Bus movement is conducted and actions are implemented considering the increase in by road movement from Bhit to
Multan and vice versa.

OC1. Safe Systems of Work


1. Lifting Manual of HQ is adopted at Eni Pakistan.
2. Bhit/Badhra LOI for lifting operations in place.
3. Eni Pakistan Procedure for Lifting Operations developed and implemented at site
4. Risk Assessment/ Job Safety Analysis conducted for critical lifting activities.
5. Valid 3rd party fitness ensured for all lifting equipments and gears.
3.2.4 Heavy lifting ✓ ✓ ✓ B 2 CI
People P 6. Heavy lifting jobs supervised by lifting supervisor and HSE staff. B 2 CI
7. On job controls ( area cordon off, fit lifting gears and lifting appliances etc.) mentioned in Risk Assessment for heavy lifting are addressed during
the activity.

OC1.9. Training & Awareness


1. Periodic Training of relevant resources related to 'Crane Operations, Forklift Operations and Rigging & Slinging' is carried out.

OC2.1. Hazard & Risk Management


1. Plant condition monitoring and analysis in place.
2. Industrial Automation (PLC & DCS) in place .
3. Preventive Maintenance plan in place and implemented.
4. Local operating nstructions for field activities are developed.
3.2.5 Maintenance hazards (access,
5. LOI for working at height, electrical standing instructions, welding cutting and grinding jobs in place .
override, bypasses, etc.)
6. PTW system implemented to address excavation and confned space entry hazards.
People P 7. Electrical Circuit Grounding in place. - ✓ ✓ ✓ A 3 CI A 3 CI
Maintenance (Working at Height / Confined
8. Plan is in place for replacement of Old ACs which have surpassed their useful life.
Space Entry / Hot & Electrical Jobs /
Excavation Jobs)
OC1.9. Training & Awareness
1. Periodic Training of relevant resources related to 'Confined Space Entry' is carried out.
2. Training of relevant resources related to 'Excavation Safety' is carried out as and when required.

HC1.5. Risk monitoring (EG: black box, IVMS, flight follow, navaids)
People P 1. Vehicle Tracking System on all the contractors'condensate transportation vehicles in place. - ✓ ✓ ✓
2. Only authorized vehicles are used as personnel carrier.

OC1.5. Procedures for non-routine / repetitive tasks (critical or driven by experienced errors or incidents)
1. HSE Risk Assessments (i.e. JSA, Environmental RAs etc.) are carried out. ✓ ✓ ✓ ✓
People P
3.2.6 Risk of substandard Contractors/ 2. Vehicle tracking data transmission/sharing with all contractor's for remedies.
Subcontractors (contractual clauses 3. Contractors' vehicles IVMS data is being monitored by Eni Pakistan.
and conditions, training and B 2 CI
B 2 CI
3,2 Operations competency)
Safety OC1.8. Contract HSE Requirements
Poor HSE System / equipment / vehicles 1. HSE guidelines are part of contracts
People P 2. 3rd party vehicles & equipment certification protocol in place. ✓ ✓ ✓ ✓
3. Contractor HSE Management procedure in place.
4. Pact for Safety project launched for two contractors.

OC2.9. Audit / Review program ✓ ✓ ✓ ✓


People P
1. Periodic HSE audits are carried out to check the compliance of contractors' HSE management system.

3.2.6 Risk of substandard Contractors/


OC1.9. Training & Awareness
Subcontractors (contractual clauses
1. Awareness sessions are conducted on lessons learnt from major accidents happened in the industry.
and conditions, training and
People P 2. Periodic training on Defensive Driving for contractor drivers - ✓ ✓ ✓ B 2 CI B 2 CI
competency) 3. Training requirements for Contractor personnel are part of contractual agreement in form of HSE Guidelines and Technical Specifications as per
work scope
Incompetent workforce

3.2.6 Risk of substandard Contractors/


Subcontractors (contractual clauses OC1.11. Other (Legal Requirements)
and conditions, training and 1. Identification of all HSE legal requirements is done through established procedure - ✓ ✓ ✓ B 2 CI
People P B 2 CI
competency) 2. HSE Legal Registers are developed and issued to all concerned functions for reference & compliance for both onshore & offshore operations.
3. HSE Legal compliance audits are conducted for contractors according to the requirements of procedure.
Non compliance to Legal requirements

OC1. Safe Systems of Work


1.Developed all relevant procedures and LoIs for field activities. - ✓ ✓ ✓
People P
2. Implementation of Work Instructions / PTW System are in place.

OC1.8. Contract HSE Requirements


1.Adherence to HSE guidelines is part of contractual requirments.
People P
2.HSE assessment of contractors is part of qualification process.
3.Framework and operating procedure for Procurement Activities in place.

OC2.9. Audit / Review program


People P 1. Regular inspection schedules of residential camps, vehicles and equipment in place. ✓ ✓ ✓ ✓
2. Regular HSE monitoring of contractors activities.

OC5.1. Line manager Leadership, Commitment and Accountability to recognise / remove the hazard ✓ ✓ ✓ ✓
3.2.6 Risk of substandard Contractors/ People P
1. HSE Golden Rules and Management Site visits using e-GRUVIS checklists implemented.
Subcontractors (contractual clauses
and conditions, training and A 1 CI A 1 CI
competency)
Inadequate performance
Residual Risk @
In case there is no evidence of control in place - Reactive Method (see attached Risk Screening
Controls/Barriers in Place Reliability of Control in Place - Predictive Method (see attached Risk Screening Matrix - Table 1)
Matrix - Table 2)
Current Risk Figures Measures to be Implemented 30/06/2022
Responsibility Assigned for
Deadline for Close-out
Risk Area Hazard Category Impact Has the event already Has the event already Has the event already Has the event already Measure Implementation
(dd/mm/yyyy)
Opportunities
Is the control independent from (i.e.: Does 3 years accident Is this control covered by (indicate Dept.)
Is this control subject to occurred at least once occurred several times occurred several times occurred several times
Preventive doesn't rely on) previous one/ones (if records show failure of this technical Preventive /
/ Recovery
Description yes tick the box, otherwise jump to control has been a specifications/dedicated
periodical maintenance or in the last 10 years in in the last 10 years in a year in the Company? a year in one facility? Frequency Severity Risk
Recovery
Description Frequency Severity Risk
3.2.6 Risk of substandard Contractors/ periodical review/audit? the Company? the Company? Probability = D Probability = E
the next question) contributor to an event? work instruction?
Subcontractors (contractual clauses Probability = B Probability = C
and conditions, training and OC5.2. Contractor Leadership, Commitment and Accountability to recognise / remove the hazard A 1 CI A 1 CI
competency) 1. Contractors' Senior Management HSE workshops conducted on bi-annual basis.
Inadequate performance 2. Regular HSE Communication meetings are conducted with Contractors.
People P 3. Implementation of HSE pledge by contractors' senior management. ✓ ✓ ✓ ✓
4. Pilot project "Pact for Safety program" implemented on selected Contractors for improvement of HSE culture.
5. Safety Competence Assessment of Contractaor personnel is followed

OC6.1. Minimum level of staff (Company and Contractor) experience at all staff changes (turn over, shift, etc.) ✓ ✓ ✓ ✓
People P
1. Documented Job Descriptions available and communicated for each position with specific & clearly defined HSE responsibilities.

OC6.2. Assessment / Gaps Removal of supervisors' competency, conduct and motivation


1. Drivers incentive program in place. ✓ ✓ ✓ ✓
People P
2. Safety and Environment Leaders and Safety Captains campaigns are implemented to encourage to employees.

OC1. Safe Systems of Work


1. Procedure "SIMOPS" in place
2. Monitoring & Communication between Workforce on each operational activity is established.
3. PTW system in place.
3.2.7 Concurrent/Simultaneous
4. Risk Assessment carried out for simultaneous operations.
Operations People P - ✓ ✓ ✓ B 3 RRM B 3 RRM
1. Poor Monitoring & Communication
OC1.9. Training & Awareness
2. Incompetence
1. Training of relevant resources related to 'SIMOPS' is carried out as and when required.
3. Roles and Responsibilities not clearly
defined

OC1.3. HSE / Process Safety rules for Construction & Commissioning - ✓ ✓


3.2.8 Construction, Commissioning, P
1. Construction plans and commissioning plans implemented.
Start-up and Shutdown risks Asset B 2 CI B 2 CI
OC1.3. HSE / Process Safety rules for Construction & Commissioning - ✓ ✓
P
1. Startup checklists implemented.

OC2.1. Hazard & Risk Management


1. Drilling plans implemented. ✓ B 3 RRM
3.2.9 Drilling operations risks People P B 3 RRM
2. HSE guidelines for onshore drilling activities in place.
3. Continuous supervision of activities.
3.2.10 Bhit Compression Phase 4 and
new wellhead installations
OC1. Safe Systems of Work
1. Improper planning
1. PTW system implemented to address hazards related to fire, lifting, excavation, improper isolation, electric shock, hot work, working at height etc.
2. Poor Monitoring & Communication
2. HSE guidelines for engineering and construction activities Reduction in Emissions and Fuel Gas
3 Incompetence
3. Project Management Execution Plan in place. supply to 03 Nodal compressors and
4. Roles and Responsibilities not clearly
4. Procedure for MoC / modification request in place. Reduction in Maintainance Cost Cl
defined People P A 3 CI P A 3
5. Startup checklists (before commissioning) implemented. Poject execution will redue the overall Risk
5.Electric Shock / Arc Flash
6 Procedure for SIMOPS in place. of eni pakistan (after stopping of three
6. Fire
7. Monitoring & Communication between Workforce on each operational activity is established. machine )
7. Excavation
8. Eni Pakistan Procedure for Lifting Operations implemented.
8.Working at height
9. Hazop stuides carried out
9. Noise
10. Heavy Lifting
3.2.11 Seismic Operations Risk
1. Explosive handling OC2.1. Hazard & Risk Management
2. River crossing 1. Eni HQ Professional Operating Instruction “opi sg hse 002 ep Minimum HSE Requirements in Geophysical Operations is in place.
3. Working in mountains People P 2. HSE Guidelines for Seismic Acquisition Services are in place. - ✓ ✓ A 3 CI A 3 CI
4. Vehicles movement 3. Contractor management procedure in place.
5. Drilling operations 4. Supervision is in place to enure the compliance on actions of Risk Assessment
6. Fire in camp
7. Fuel handling

1. Local Call points to be provided at main / exit points on 06 standalone booster compressors at Bhit.
HC4.1. Active emergency equipment (firefighting, anti-pollution, standing-by emergency devices)
3.3.1 Lack of emergency preparedness 2. Pending works on Camp-2 dedicated fire water system to be completed.
1. Fire & gas detection and alarm system in place at Bhit plant and wellhead compression facilities
(firefighting, spill clean-up, security
2. Fire suppression system (Fire Ring, Fire Hydrants, Fire Water Oscillating Monitors) in place.
support, evacuation) 3. Stand alone smoke detector units to be installed rather connect them to the main DCS unit for centerralization
3. First Aid Boxes and Potable fire extinguishers available. ✓ ✓ ✓
1. Inadequate Emergency response People P P E&C Coordinator 30-Jun-22
4. H2S detectors installed at sites.
Preparedness.
5. BA Sets available at processing plants / drilling sites.
2. H2S release during drilling operations &
6. Fire Tender available at Bhit Plant.
incompetence in handling
7. Fire Alarrm, Fire extinguishers, smoke deductors & Fire Hydrants installed at appropriate location of Karachi Office

3,3 Emergency B 2 CI
OC4.1. Emergency Response Plan (e.g. Safety, spill, health) B 3 RRM
Response
1. Eni Pakistan ER Strategy and ERP Procedure in place for Karachi office, onshore and offshore activities.
2. Procedure for Emergency Response Training in place. ✓ ✓ ✓
People P
3. ER Team and support Teams established and their Roles and responsibilities are defined in ERP.
4. Emergency drills are carried out at head office and field locations on routine basis.
5. Fire Risk Assessment of warehouse/yard facilities at Karachi is carried out.
3.3.2 Lack of communication for
emergency planning OC4.2. Scenario-based Contingency Plans
1. Well blowout contingency plan in place. ✓ ✓ ✓
People P
2. MERP in Place.
3. Oil spill contingency plans in place.

OC1.9. Training & Awareness ✓ ✓ ✓ 31-12-2021


People P P HRO Manager
1. Regular Trainings sessions for emergency response / management teams conducted for Karachi and Field locations. Trainings for emergency coordinators, on scene coordinators and RRT leaders to be carried out after recent organizational changes

HC4.1. Active emergency equipment (firefighting, anti-pollution, standing-by emergency devices) - ✓ ✓


People P
1. Fire fighting equipment, Smoke detection system and Public Announcement system available in good working condition.
3.4.1 Office-related risks
OC3.4. Inspection & Testing program
People P 1. Inspection matrix for regular health check of fire fighting equipment at offices in place. ✓ ✓ ✓ A 2 CI A 2 CI
1. Fire at offices (Karachi, Islamabad and 2. HSE inspection of office and associated facilities carried out.
Field),
OC4.3. Emergency Response team (e.g. Firefighting, first aid brigade)
2. Improper electrical fixtures/practices ✓ ✓ ✓
Asset R 1. Emergency response teams formed and their training is conducted.
2. Training of security/drivers personnel for fire fighting is also conducted

3.4.1 Office-related risks OC2.2. Safety Engineering Design


1. Tripping hazards People P 1. Proper office layout / cable management in place to to avoid tripping . - B 2 CI B 2 CI
3,4 Office Safety
2. Ergonomic hazards 2. Comprehensive ergonomic survey carried out and recommendations action plan is being implemented.

OC2.1. Hazard & Risk Management


1. Facilities Maintenance Management System in place
2. Indoor air quality monitoring carried out.
3.4.1 Office-related risks 3. Legeionella pneumophelia monitoring carried out.
1. Poor air quality through HVAC 4. Risk Assessment/ JSA is carried out during maintenance and non-routine activities in Karachi office and facilities. - ✓ ✓ A 2 CI
People P A 2 CI
2. Improper Planning 5. Risk Assessment/ Job Safety Analysis conducted for critical lifting activities.
3. Heavy Lifting 6. Valid 3rd party fitness ensured for all lifting equipments and gears.
7. Heavy lifting jobs supervised by lifting supervisor and HSE staff.
8. On job controls ( area cordon off, certified lifting gears and lifting appliances etc.) mentioned in Risk Assessment/ JSA for heavy lifting are
addressed during the activity.

3.1.5 Risk from layout (lack of OC2.1. Hazard & Risk Management
People P - ✓ ✓ A 2 CI A 2 CI
containment, module proximity, 1. Camps / facilities located at reasonable distance from local dwellings/villages.
unfavourable wind directions, wrong
escape routes and mustering)
Loss of life / Injuries
3,5 Other OC1. Safe Systems of Work
(Public Safety) 1. Implementation of all applicable national laws and regulations
3.2.2 Land transportation and 2. Vehicle Speed Monitoring & tracking system in place
communication risk 3. Night time driving not allowed unless authorized specifically
Vehicular accidents while passing 4. Water sprinkling to minimize dust spreading near settlements
through/near community dwellings / People P 5. Regular trainings and awarness sessions for Eni & Contractor drivers on defensive driving. ✓ ✓ ✓ A 3 CI A 3 CI
villages and Condensate/diesel spill / fire or 6. Drivers incentive program in place.
Soil/water contamination during 7. Eni Pakistan Driving Policy in place.
transportation. 8. Due diligence for condensate and diesel transport carried out.
9. Oil Spill Contingency Plan in place.

OC2.1. Hazard & Risk Management


3,5 Other
Earthquake,floods, extreme weather 1. Design and construction of Karachi Office (The Forum building) is as per seismic requirements / earthquake resistant. ✓ B 2 CI
(Natural People P B 2 CI
conditions and other natural disasters. 2. Fire and emergency evacuation procedure for Karachi office and facilities in place.
Hazards)
3. Heavy / Monsoon rains contingency plan is in place for Bhit / Badhra.

Health

OC2.6. Occupational Health & Medical Support program


4.1.1 Chemical agent (including 1. Occupational health Guidelines and standards in place.
carcinogenics, toxics, hazardous 2. Industrial Hygiene Program in place.
sustances, asphyxiation agents) People P 3. Occupational Health Risk Assessment (OHRA) is carried out for every E&P facilities. - ✓ ✓
Work force exposure to industrial 4. Fitness to Work Procedure in place (periodic health surveillance program implemented).
chemicals 5. Training program on chemical handling in place.
6.COSHH risk assessment conducted.

OC2.1. Hazard & Risk Management


1. Controls of Permit to work system applied at high noise areas.
2. Engineering controls provided (acoustic proofing).
4.1.2 Physical agent (noise, Vibration, 3. High noise areas mapped on plant & wellheads layout drawings & displayed for awareness.
barometric, Thermal, electricity, 4. Mandatory signage provided according to noise monitoring data.
Electromagnetic Field, Optical 5. Corrective and Preventive maintenance of noise generating equipment is carried out.
People P
Radiation, Ionizing Radiation, 6. Annual Noise monitoring survey carried out for both Bhit Plant, Bhit Air Strip, Kadanwari & Karachi office facilities.
TENORM) 7. Hearing tests are conducted as per Fitness to Work Procedure for exposed groups on a periodic basis.
8. Vibration Monitoring conducted for all the drivers /heavy machinery operators
9. EMF survey conducted.
10. Eni Pakistan's TENORM procedure is in place and TENORM survey carried out for Bhit Plant. B 2 CI B 2 CI
11. TENORM monitoring during shutdown activities at Bhit plant.

OC2.1. Hazard & Risk Management


1.Requirements of Permit To Work implemented for any radiography test.
2. Eni Pakistan's Radiography procedure in place at Bhit.
3.Implementation of Eni Pakistan's procedure for Handling & Use of Radiography Material is in place.
4.Compliance to vendor's procedure during NDT activities carried out by contractors.
4.1.2 Physical agent (noise, Vibration, 5.Strict monitoring of radio active material inventory by contractor is ensured.
4,1 Work
barometric, Thermal, electricity, 6. Professional (certified / licensed) employees of contractors' are ensured for handling of radiation jobs.
Environment
Electromagnetic Field, Optical 7. Posting of Radiation Signs at site and storage ✓ ✓ ✓
People P
Radiation, Ionizing Radiation, TENORM, 8.Special arrangements for storage & transportation of radioactive source..
NDT, Well Logging .) 9.Equipment / PPE designed specifically for Radiation Protection is used.
10. Contractor Radioactive Materials Emergency Management Plan is followed.
11. Contractor Procedure: Pakistan Explosive Transportation SOP is followed
12. IAEA Procedure: Radiation Protection & Management of Radioactive Waste in the Oil & Gas Industry is followed
13. Procedure on Radiological Risk Management in Wireline Logging & LWD Operations developed and implemented.
14. Noise and EMFmonitoring of Karachi office carried out
15. Calibration of TENORM monitoring equipment is done through PINS tech. (Pakistan Institute of Nuclear Science and Technology)

4.1.3 Ergonomic risk (Physical static HC5. Other (specify)


People P - ✓ ✓
load, Physical dinamic load, job place) 1. Shaded rest areas provided.
Office comfort (Ventilation, illumination,
temperature, etc)
1. Exposure to high temperature (hot OC1. Safe Systems of Work B 2 CI B 2 CI
weather) 1. Illumination survey conducted and action plan is being implemented.
2. Exposure to improper illumination, loss / People P 2..HVAC systems' regular maintenance carried out. ✓ ✓ ✓
lack of HVAC etc. 3. Ergonomics Survey for Karachi office carried out and actions are being implemented.
3.Eye strain/visual Fatigue

OC2.1. Hazard & Risk Management


4.1.4 Psychosocial risk (content of task, 1. Risk based fitness to work (FTW) program for all staff as per their jobs.
time organization, job charge, etc) 2. Employees Assistance Program is in place.
1.Day & Night shift People P 3. By road travel arranged for staff suffering from Aerophobia. - ✓ ✓ A 2 CI A 2 CI
2.Aerophobia 4. Stress survey conducted for all the Eni Pakistan staff and actions implemented.
3.Inadequate accommodation / meal 5. Mid rota change over of the production shift employees.
4.Inadequate land transport 6. Journey management procedure / Journey breaks in place (standby drivers during the field movement)

HC4.4. Medical Emergency Equipment


1. Well equipped field clinics established at Bhit plant, Badhra-2 & at Camp-4.
People P 2. Field clinics at contractor camp provided. - ✓ ✓ B 2 CI B 2 CI
3. Ambulance available.
4.2.1 Site medical facilities 4. Isolation wards established for Covid-19 patients at Bhit & Badhra Gas Field.
1. Inadequate Facilities

OC2. Hazard-specific formal protocols


P 1. Site health professional trained & certified in Medical Emergency response procedures. ✓ ✓ ✓

OC2.6. Occupational Health & Medical Support program

1. Medical Evacuation procedure available and implemented. Regular drills ongoing to check the emergency response.
4,2 Medical 2. Contingency procedure for Monsoon Medivac services in place.
4.2.2 Medical emergency response R ✓ ✓ ✓
Emergency 3. Pre and post maternity benefits available for female employees.
capabilities (EG: major incidents)
1. Inadequate Medical Emergency 4 .Disability/personal accidental coverage
Response People 5. Accidental Death coverage by Group Life Insurance B 3 RRM B 3 RRM
2. Vulnerable workers (Pregnant Women) 6. Revised / Updated MERP is in place for Covid-19 preparedness / drills carried out.
3. Accidental and Death coverage
OC2.1. Hazard & Risk Management
1. Multicasualty/Triage procedure for Bhit & Badhra gas field.
2. Guidelines for contractors medical facilities built in contract document through OH&MS guidelines.
3. Risk based Fitness to Work for ERT members.
4. Implementation of Emergency drills plan for Medical emergencies to test the emergency response procedures (MERP)
P 5. All the the contractor staff is bound to provide one week follow up for COVID 19 symtoms and fill a travel history form prior to come to the field. ✓ ✓ ✓
6. Regular Medivac drills for Covid-19 patient handling and transportation from Bhit field carried out.

OC1.9. Training & Awareness


1. Basic & Advanced First Aid Training of first aiders is carried out regularly.

OC7. Other (specify)


1. Health Risk Assessment (HRA) is carried out for every E&P facilities .
2. Catering Surveillance Program in place.
3. Field clinic SOP available which includes Infection Control guidelines
4. Proactive health awareness/ communication to staff on regular basis
5. Updated Pandemic disease preparedness & Medical Emergency Response Plan in place.
6. Chronic disease Risk Minimization sessions are conducted.
7. Flu vaccination program in place.
4.3.7 Pandemic Disease People P 8.Vector Borne Disease Management procedure in place - ✓ A 4 RRM A 4 RRM
9. Increased frequency of awareness sessions,disinfection / sanitization plans for Covid-19.
10. Implementation of Health screening Questionnaire for Office & Rota based staff / travellers / visitors and contractors.
4,3 Disease Risk 11.Thermal screening at all Eni Pakistan locations for Covid-19.
12. Health Risk Assessment (HRA) carried out for COVID 19.
13. COVID 19 awareness plan is in place.
14. Hand washing and disinfection of area is mandatory
15. Covid-19 guidelines circulated to all contractor for its implementation.
20. Vaccination for COVID-19 is in place

OC2.1. Hazard & Risk Management


1. General hygiene inspection of Kitchen, washrooms, general practices and other facilities.
2. Water Hygiene Procedure in place.and HACCP guidelines is in place. - ✓ ✓ A 2 CI
People P A 2 CI
4.3.5 Catering risk (Food storage, 3. Camp Kitchens are aligned with HACCP Guidelines
handle, disposal; contamination, heat 4. FTW procedure in place for the catering staff
5. Use of face mask is mandatory for catering staff.
contact, food chain management)

4.4.2 Fitness to work OC2.1. Hazard & Risk Management


Unfit work force People P 1. Effective Fitness to work standards for company and contractors' staff in place A 2 CI A 2 CI
Lack of recreational / fitness facilities 2. Gym / recreational facility at Bhit and Kadanwari for healthy work environment.

HC5. Other (specify)


4,4 Remote R 1. Camps / facilities located at reasonable distance from local dwellings/villages. - ✓ ✓
Location 2. Local community labor been utilized with extra checks with respect to COVID 19
4.4.6 Location and logistics
1. Inadequate Facilities B 2 CI
People B 2 CI
2. Exchange of disease due to interaction OC2.1. Hazard & Risk Management
with locals 1. Standardized Procedure available for Remote Medical Facilities.
P ✓ ✓ ✓
2. Health Monitoring Program in place for Eni and Contractor staff.
3. Health and Hygiene Awareness Campaign in place.(Health Promotion)