You are on page 1of 3

ADL3000-E

ADL3000-E Current
Maximum current

Consumption
6A,80A

<1VA(Single phase rated current)

Accuracy ±0.2%

range 45~65Hz
Frequency
accuracy ±0.2%

Energy Active energy Class 0.5s


accuracy reactive energy Class 2

Clock accuracy ≤0.5s/d

Width 80±20ms

General Active Pulse 6400imp/kWh,400imp/kWh


constant
(Correspond with the basic current)
ADL3000-E three phase electric meter is designed for three phase
Interface RS485
energy measurement on low voltage system.The meter meet the related Communication
Protocol Modbus RTU
technical requirements of electronic meter in the IEC62053-21、
IEC62053-22 standards.

Functions ■ Working environment


Working -25℃~55℃
Function Description Provide temperature
Storage -40℃~70℃
Active kWh (positive and negative) ■
Measurement humidity ≤95%(No condensation)
Reactive kWh (positive and negative) ■
of kWh
Altitude <2000m
A, B, C phase positive kWh ■

Measurement of
U、IP、Q、S、PF、HZ ■
electrical parameters

Measurement of
2~31ST Voltage and current harmonic □
Dimension drawings (Unit: mm)
harmonic

LCD Display 8 digits ■

Key 4 keys ■

LED alarm voltage loss and over voltage ■


69.5

Active switch input □


50

Switch I/O
5
Switch output □ 7
Maximum demanded kWh and time happened □

Data Frozen data on last 48 months, last 90days □


88

126.5
Date, time □

Infrared ■
Communication Connect via CT
RS485, MODBUS-RTU □
Temperature
measurement Support 3 outlay NTC temperature □

(■: means standard, □:means optional)


69.5
50

Parameters
8

■ Electric performance
88

126.5

Nominal voltage 3×100V、 3×380V、3×57.7/100V、 3×220/380V

Consumption <10VA(Single phase)


Voltage Direct connect
Impedance >2MΩ

Accuracy ±0.2%
Note:The torque of direct connect should not be greater than 4.0N·m,
and the torque of connect via CT should not be greater than 2.0N·m.

Installation and operation instruction


-01-
ADL3000-E
Wiring and Installing Ua Ub Uc N Ia* Ia Ib* Ib Ic* Ic

■ Wiring
A

Ua Ub Uc N Ia* Ia Ib* Ib Ic* Ic C

A Device
设备

C
Three phase four lines, 3CT
N

Ua Ub Uc N Ia* Ia Ib* Ib Ic* Ic


Three phase four lines connect via CT

B
L1 L1' L2 L2' L3 L3' N'
C

A
Device
设备

C
Three phase three lines, 2CT
N

Three phase four lines direct connect

21 22 17 18 15 16 19 20

Ua Ub Uc Un Ia* Ia Ib* Ib Ic* Ic


Ep+ Ep- TP+ TP- Eq+ Eq-
A1 B1

RS485 kwh pulse output clock pulse kvarh pulse output


A
Communication, pulse connection
B

24 25 30 39 40 41
Three phase three lines connect via CT

A2 B2 DI1 COM1 DO1+ DO1-


Second RS485 Switch input Switch output
L1 L1' L2 L2' L3 L3' N
Communication, pulse connection

B 60 61 62 69

T1 T2 T3 COM

Three phase three lines direct connect


Outlay NTC temperature measurement

Installation and operation instruction


-02-
ADL3000-E
■ Installing

ADL3000-E installing

Note:DIN 35 mm rail installation.

Display examples

forward active energy Voltage on A phase

Current on A phase power

Installation and operation instruction


-03-

You might also like