Professional Documents
Culture Documents
Four additional ISO Clauses remain and the series will be completed. However,
with the introduction of ISO 9001:2000, the series will continue with
comparisons and updates to help you and your company better understand
QS9000-2000 requirements and conversion from ISO 9000 1994 documentation.
ISO 9001-2000 Second Committee Draft (CD) has been available since February
1999 (see the March 1999 issue of MoldMaking Technology magazine.) The Draft
International Standard ISO 9001-2000 will be available for purchase January 15,
2000.
Introduction
ANSI/ISO/ASQ Q9000-2-1997 states: "The supplier's quality records should give
evidence that quality system elements falling within the requirements of Q9001-2
or 9003 have been implemented. If the results have not proved satisfactory,
quality records should indicate what has been done to correct the situation."
The approach for control of quality records is to identify the records required in
each of your procedures to support or provide objective evidence that the
procedure has been followed. It is suggested that you develop one procedure to
comply with Clause 4.16.
The following list of clauses is provided to identify Clause 4.16 quality record
requirements.
4.1.3 Management Review
4.2.3 Quality Planning
6.8 Corrective actions according to trends/results form process and service performance shall be
initiated and to eliminate causes of nonconformities. All Concerned 6.9 Corrective actions according to
trends/results form process and service performance shall be initiated and to eliminate causes of
nonconformities. Process Owner 6.10 If the proposal is found suitable for quality improvement, the
same shall be forwarded to MR. OM/MR 6.11 Quality Supervisor/MR shall scrutinize the request and
follow the same procedure as described in step 6.3 to 6.7. PM 6.12 Customer complaints received shall
be entered in the
4.7 Control of Customer Supplied Product
4.8 Product Traceability
4.9 Process Control
4.10.2.3 Urgent Production Release
4.10.4 Final Inspection & Testing
4.10.5 Inspection and Test Records
4.11.1 Control of Inspection, M & T Equipment
4.11.2.e Control Procedure
4.13.2 Review and Disposition Nonconforming Product
4.14.1 Corrective/Preventive Action
4.14.2 b Results of Nonconforming Work
4.16 Subcontractor Quality Records
4.17 Internal Quality Audits Training
If you use a computer network, data collection is a simple step and completed
for you using system files and directories. Records are easily collected for
analysis or other use.
1 PURPOSE:
To establish a standardized process within ICMS for providing and certifying Emergency
Response Training for Super Sucker Drivers. This program aims to enhance drivers’
ability to handle emergencies effectively during Super Sucker operations, ensuring
compliance with Saudi regulations and ICMS standards.
2 SCOPE:
This Standard Operating Procedure applies to all Super Sucker Drivers employed by
ICMS, outlining the steps and requirements for Emergency Response Training.
2 REGULATORY COMPLIANCE:
2.1 REGULATORY REVIEW
Conduct a comprehensive review of relevant regulations from the government,
particularly those issued by the General Authority of Transport. Ensure that the training
program aligns with the latest requirements.