43. Draw a work breakdown structure for the manufacture of a bicycle. Limit the size to
four levels of detail. (12)
44. What is meant by internal rate of return (IRR)? Show how this can be obtained
graphically. (6)
45. Describe the functions carried out by a project office. (2)
46. What is the purpose of a post project review. (45)
47. Describe three methods of conflict resolution when mediation has failed. (42)
48. State four main characteristics of a good project manager. (2)
49. Describe two pros and cons of an AoA network and an AoN network. (19)
50. Describe two pros and cons of DCF and payback. (6)
51. What is meant by portfolio management. (3)
52. What are success criteria. (37)
53. Describe a change Register. (17)
54. What is meant by Information Management. (37)
55. Explain what is meant by value management. (35)
56. Explain the difference between project management and line management. (1)
57. What is meant by matrix project management. (9)
58. What is benefit analysis. (6)
59. What is meant by project governance. (43)
60. Give eight topics of an information management plan. (37)