You are on page 1of 4

Electrical Design Engineer - Candidate Additional Information

Candidate Name:Harsha Manjunatha Date:06/02/2024

Full Postal Address: 108,24 shire oak road, headingley,leeds-LS6 2DE

Mobile:07824077042 Is your driving license clean, if not please advise on the


number of points and when they expire:

Email: harsha87927@gmail.com Have a valid provisional license and have an Indian driving
license. I can obtain a valid driving license in a month

We would appreciate it if you could answer the following questions. We recognise this does involve an investment of your
time, but it will help your application for the role. Please don’t hesitate to provide any other additional information that will
support your application.

Please complete for your most recent/relevant role:

Projects worked on: (Synopsis) Worked on Designing PV and BESS from a few kw systems to utility scale.

Industries you have worked within: PV EPC companies

Relevant qualifications: Master’s in Electrical and renewable energy sources, Bachelor’s degree in
Electrical and electronics engineering, diploma in electrical and electronics
engineering

Do you have experience in Yes


Photovoltaic (PV) or Battery Energy
Storage Systems (BESS)?

Have you worked with High Voltage No, but have knowledge of How AC system work for 3 phases upto
power systems (1kV)? transmission level of 11kv

Do you have experience in designing No


and implementing industrial electrical
installations?

Are you proficient in Autodesk or Yes, I have some knowledge using Auto-Cad for design site plans and single
similar? line diagrams for PV designs

Have you ever used PVsyst or similar For PV designing I have used PVsyst for generating reports, Open solar,
modelling tools? Helioscope and Solaredge for designing 3d model of PV systems

What methods and tools have you For PV systems we usually need to calculate Row spacing for PV panels,
used for calculations? string lengths, cable transmission losses etc. we have developed the Excel

Prepared by Brian Ebulubu, Wallace Hind. be@wallacehind.com DDI:01604 683317 M:07552379167


sheets for calculations.

What level of seniority/ supervision and For commercial projects mainly the director of the company was reviewing the
sign-off do you have for designs? design and for domestic mostly it was self verification and directors approval
was needed

How frequently are you on site? I have visited 5 sites while working at electric futures mostly for commercial
projects and we were using the installation team with the site survey form for
domestic projects

Please talk about a challenging electrical design situation you have worked on. What was the challenge? What
did you do to overcome this?

Answer: I could not answer the question as i am not worked under any large electrical design situation.

Please describe an interesting technical discovery, novel solution or surprising cause you have found. What
methods did you use to reach that conclusion? What makes it interesting or surprising? How did you present
your findings?

Answer: For the PV projects the solar panels and the connections play an important role in the PV systems in
which these connections and cabela lie underneath the panels which are hard to inspect in case of any issues.
There were many issues as these connections are covered with dust, bird filling underneath the panels and
water. These was a small issue but working as a technician we found several projects which had a a rustic
connection, some with lots of dust and bird fillings as all the panels work in series and which was connected in
a string this small issues created a huge impact on disable the working of the whole string which would cause
the customer with a faults. The simple solution was a device called as Arc box which was released recently to
prevent the connection between the panels with fire proofing. This device will not only help with the Fire
proofing but also provide the solutions for all the problems we were facing. This device will be an attachment
device for the connection terminals which will be in a box which is fireproof, weather resistant and could solve
the issue for us. As PV systems are long term projects this helps in eradication of rise of simple issues with the
panels and the strings. We implemented this in a couple of projects to start while replacing the damaged
connection connection with this product and the results are awaiting but we can say that if we use this we can
eliminate a lot of manpower taken by the installation team while maintaining the power plants.

Please give an example of when a project was falling behind the customer’s timescale. How did you resolve this
situation?

Answer:We faced this kind of issue with a domestic client which was delayed project with not avaiblality of the
contractors to complete the desired work. The system was a simple system on GRP Flat roof but we faced so
many delayes to the project as the roof had a warrenty and we could not drill in to the roof as it would void the
roofs warrenty so i had to liaslise with the roofers to complete the required work and they were very bad at
commucationing and this was very small work they would not take the work.so iu rewuired out to all the other
roofing comapnies so that any other roofers can do the work for us but everything went down as we could not
find any roofers after 4 months as the project needed to be complete with in a month. We had to find an
alternate situation of this so we while trying to find the solution to this problem we found a solution of using a
product from a company which was a high expense but would solve the problem so we had a chat with
customer with the new proposed solution and the customer aggred to go ahead with installtion so we

Prepared by Brian Ebulubu, Wallace Hind. be@wallacehind.com DDI:01604 683317 M:07552379167


sucessfully completed the project after a lot of delay.

Please describe your preferred office working environment. How do you like to be managed?

Answer: I would describe my preferred office environment with a couple of tables in a silent room and a coffee
machine in the office. In terms of management I would love to be given freedom and not to be micromanaged
but given full clarity about the details of the projects in terms of communication.

Humility is a characteristic we are particularly interested in. In your opinion where is the ‘chink in your armour’
for this application and how would you address your potential shortfall to be successful?

Answer: with my full honesty and less work experience, I would like to mention that I am more of a theoretical
person at this point with my education and need more practical experience in the industry and I have all the
basics required as a saying it's like a gold liquid before molding into any shape. I am quick learner and easy to
adapt so I pick up things easily and get adapted to it in no time and become successful in some time.

Salary Package. Please provide exact details as to your basic salary, bonus/commission, car, pension and any other
additional benefits. Please also confirm that the salary on offer is acceptable.

Base Salary 23000


Bonus / Commission (is this paid 250 pounds paid annually
monthly, quarterly or annually)
Company Car / Car Allowance No
Pension 5%
Holidays 25 days
Other (Healthcare/Lunch/Gym etc) -
Is the salary range on offer Yes
acceptable?

Notice period - If you are currently employed, what notice period would you need to give? If currently out of work, how
quickly would you like to start? Please advise on any holiday commitments in the next 3 months.
4 weeks. I have no currently holiday commitments in the next 3 months

Reasons for Leaving. Please outline your reasons for leaving your current and previous employer. If you have worked
for more than two in the last five years, please advise why you left those.
The obvious reason is that they can not offer sponsorship but to be more specific reasons are i am looking for more
challenges and more projects on hand and also growth opportunities in terms of carrer

Availability – Preliminary Interview - Please indicate your availability for an interview over the next few weeks (is there
any specific dates you cannot attend). Location Oundle.

Prepared by Brian Ebulubu, Wallace Hind. be@wallacehind.com DDI:01604 683317 M:07552379167


I am available anytime in couple of weeks

Please confirm you are eligible to work in the UK. Kindly confirm any restrictions to your application including
relevant visas, and that, you are happy for us to pass on your CV and addendum to the Cooper Energy
Engineering.
yes

Please confirm you are happy for Wallace Hind Selection to retain your personal information for a period of 2
years following the cessation of this recruitment process. Please tick one of the boxes below.

(Wallace Hind will only use your information for future job opportunities or to keep you informed about our
products or services. We will not send your details to any external third party. Your details will not be sent
outside of the EU. For more information please click the link to view our privacy policy).

https://www.wallacehind.com/privacy-policy-7
Opt In yes Opt Out

Prepared by Brian Ebulubu, Wallace Hind. be@wallacehind.com DDI:01604 683317 M:07552379167

You might also like