NAWF-EWCEB-NC-EPC-SBH-
CHHN-079-80-70 (1)
Top Floor Slab/Beam Formworks Civil-Elec-A-Top
Carpentary Conceptual Planning of MEP HOSPITAL BED , PASSENGER AND
SERVICE ELEVATORS (9 UNITS )
Civil-Plumb-A-Ground
Top Floor Slab/Beam Formworks Review and Meeting of MEP
Top Floor Slab/Beam Works HEATING VENTILATION & AIR
Shuttering
Civil-Plumb-A-First CONDITIONING ( HVAC)
ENGINEERING DESIGN Updates of MEP
Top Floor Slab/Beam Rebar Placing
Civil-Plumb-A-Second MEDICAL GAS PIPE LINE SYSTEM
Milestone1 Start Civil- Plumbing Conduiting
Submission of all conceptual design (MGPS)
Top Floor Slab/Beam RCC Concrete drawings
Casting Civil-Plumb-A-Third
FIRE FIGHTING SYSTEM
Review & Discussion of conceptual
design drawings with authorized Civil-Plumb-A-Top
MILESTONE-5 COMPLETION reprentatives of Employer FIRE ALARM SYSTEM & PUBLIC
Submission of all the data sheets,
ADDRESS (PA) SYSTEM
technical specification
D/W-AL-Fabri-A-Basement
Brick-A-Ground Submission of Architectural Design
Drawings and report PLUMBING WORKS
D/W-AL-Fabri-A-Ground
Brick-A-First
Submission of Structure Design ELECTRICAL ( CABLE & LIGHT
Drawings with Report FIXTURES)
D/W-AL-Fabri-A-First
Brick-A-Second
Brick Works Fabrication of Aluminium Door/
Submission of all MEP design Window DATA NETWORKING & EPABX
D/W-AL-Fabri-A-Second
Brick-A-Third Drawings with Report SYSTEM
Approval of all design drawings, data,
reports and specifications along with
D/W-AL-Fabri-A-Third
Brick-A-Top presentation Presentation CCTV , ACCESS SYSTEM AND
SECURITY SYSTEM
D/W-AL-Fabri-A-Top
Civil-Elec-A-Ground Review
HOSPITAL BED , PASSENGER AND
SERVICE ELEVATORS (9 UNITS )
D/W-AL-Instal-A-Basement
Civil-Elec-A-First Updates from the review
Milestone 2 Start
HEATING VENTILATION & AIR
D/W-AL-Instal-A-Ground CONDITIONING ( HVAC)
Civil-Elec-A-Second Submission for final approval
Civil- Electrical Conduiting
Civil-Elec-A-Third
NAWF-EWCEB-NC-EPC-SBH- MILESTONE-1 COMPLETION
CHHN-079-80-70 (1)
Int-PoP-A-Ground
Falseceiling-A-Ground Basement Raft Formwork
MILESTONE-2 COMPLETION Civil Structures Deshuttering
Int-PoP-A-First
Falseceiling-A-First Milestone-3 Start
Site Clerance Basement Floor
Sub-Structure Works Basement Column & Shearwall Rebar
Int-PoP-A-Second C/B-C
Internal Wall PoP Site Preliminary
Falseceiling-A-Second
Building Layout False Ceiling Works
T/C of MGPS
MILESTONE-3 COMPLETION
Installation of Fire Alarm System
MILESTONE-7 COMPLETION