Ground Floor Column Rebar Cutting/

Bending First Floor Column Formworks


Carpentary

Ground Floor Column Formworks


Carpentary First Floor Column Formworks
Shuttering
First Floor Column Works
Ground Floor Column Formworks
Shuttering First Floor Column Rebar Placing

Ground Floor Column Works


Ground Floor Column Rebar Placing First Floor Column RCC Concrete
Casting AGREEMENT & WO DATE

Ground Floor Column RCC Concrete


Casting First Floor Column Formworks De- Installation of Project Signboard
Shuttering

First Floor Fencing Material List


Ground Floor Column Formworks De-
Shuttering First Floor Slab/Beam Rebar Cutting/
Bending
Approval from Employer for boundary
Ground Floor Fencing
Ground Floor Slab/Beam Rebar
Cutting/Bending First Floor Slab/Beam Formworks
Carpentary
Purchase of MS Pipe and CGI sheets
Ground Floor Slab/Beam Formworks Site protection work
Carpentary First Floor Slab/Beam Formworks
Shuttering Excavation for MS pipe
First Floor Slab/Beam Works
Ground Floor Slab/Beam Formworks
Shuttering First Floor Slab/Beam Rebar Placing Concreting of MS Pipe

Ground Floor Slab/Beam Works


Ground Floor Slab/Beam Rebar First Floor Slab/Beam RCC Concrete CGI Sheets Laying
Placing Casting

Approval from Employer for


Ground Floor Slab/Beam RCC First Floor Slab/Beam Formwork contractor's Camp and site Office
Concrete Casting Deshuttering

Ground Floor Slab/Beam Formwork


Deshuttering
Super-Structure Works
First Floor Column Rebar Cutting/
Milestone-4 Start
Bending

Purchase of Materials for Camp and Procurement of Plubming Items


Site office Third Floor Column Formworks
Third Floor Column Works
MILESTONE-4 COMPLETION Shuttering
Procurement of HVAC Items
Layout of Approved plan
Second Floor Column Rebar Cutting/ Contractor's camp and construction Third Floor Column Rebar Placing
Bending yard temporary fencing
Procurement of Data Networking &
SITE MOBILIZATION Civil Works- Site Office EPABX System
Third Floor Column RCC Concrete
PROCUREMENT
Second Floor Column Formworks Casting
Carpentary Civil Works- Labor's Camp Purchase Materials
Third Floor Procurement of CCTV, Access System
Third Floor Slab/Beam Rebar Cutting/ & Security System
Milestone-5 Start
Second Floor Column Formworks Bending
Second Floor Column Works Construction yard identification
Shuttering
Procurement of Fire Alarm System &
Third Floor Slab/Beam Formworks PA System
Meeting with employer's
Second Floor Column Rebar Placing Carpentary
representative
Procurement of Fire Fighting System
Second Floor Column RCC Concrete Third Floor Slab/Beam Formworks
Identification of proposed plot area Third Floor Slab/Beam Works
Casting Shuttering
Procurement of MGPS

Second Floor Topographical survey with existing site


Second Floor Slab/Beam Rebar Topographical Survey Third Floor Slab/Beam Rebar Placing
Procurement of Hospital Elevators
Cutting/Bending
layout drawings of survey
Third Floor Slab/Beam RCC Concrete
Casting Appointment of Consultant for
Second Floor Slab/Beam Formworks
Architectural, Structural and MEP
Carpentary
Report submission of topograhical
survey
Top Floor Column Rebar Cutting/
Bending Initial conceptual Desk study and
Second Floor Slab/Beam Formworks
Second Floor Slab/Beam Works Review
Shuttering
Approval for soil Test Bole hole
Top Floor Column Formworks
Carpentary conceptual Architectural Planning and
Second Floor Slab/Beam Rebar Geo-Technical Soil Investigation and Soil Test bole Hole start Zonning
Placing Analysis
Top Floor Column Formworks
Report submission of Soil Test Top Floor Column Works Review and meeting of Architecture
Second Floor Slab/Beam RCC Shuttering
Concrete Casting
Identify Materials Top Floor Column Rebar Placing Updates of Architecture
Third Floor Column Rebar Cutting/
Bending
Procurement of Civil Items Top Floor Column RCC Concrete Conceptual planning of Structure
Casting Conceptual drawings design
Third Floor Column Formworks submission with initial reports
Carpentary Procurement of Electrical Items Top Floor Review and meeting of Structure
including technical specifications and
Top Floor Slab/Beam Rebar Cutting/ all data.
Bending
Updates of Structure

NAWF-EWCEB-NC-EPC-SBH-
CHHN-079-80-70 (1)
Top Floor Slab/Beam Formworks Civil-Elec-A-Top
Carpentary Conceptual Planning of MEP HOSPITAL BED , PASSENGER AND
SERVICE ELEVATORS (9 UNITS )
Civil-Plumb-A-Ground
Top Floor Slab/Beam Formworks Review and Meeting of MEP
Top Floor Slab/Beam Works HEATING VENTILATION & AIR
Shuttering
Civil-Plumb-A-First CONDITIONING ( HVAC)
ENGINEERING DESIGN Updates of MEP
Top Floor Slab/Beam Rebar Placing
Civil-Plumb-A-Second MEDICAL GAS PIPE LINE SYSTEM
Milestone1 Start Civil- Plumbing Conduiting
Submission of all conceptual design (MGPS)
Top Floor Slab/Beam RCC Concrete drawings
Casting Civil-Plumb-A-Third
FIRE FIGHTING SYSTEM
Review & Discussion of conceptual
design drawings with authorized Civil-Plumb-A-Top
MILESTONE-5 COMPLETION reprentatives of Employer FIRE ALARM SYSTEM & PUBLIC
Submission of all the data sheets,
ADDRESS (PA) SYSTEM
technical specification
D/W-AL-Fabri-A-Basement
Brick-A-Ground Submission of Architectural Design
Drawings and report PLUMBING WORKS
D/W-AL-Fabri-A-Ground
Brick-A-First
Submission of Structure Design ELECTRICAL ( CABLE & LIGHT
Drawings with Report FIXTURES)
D/W-AL-Fabri-A-First
Brick-A-Second
Brick Works Fabrication of Aluminium Door/
Submission of all MEP design Window DATA NETWORKING & EPABX
D/W-AL-Fabri-A-Second
Brick-A-Third Drawings with Report SYSTEM
Approval of all design drawings, data,
reports and specifications along with
D/W-AL-Fabri-A-Third
Brick-A-Top presentation Presentation CCTV , ACCESS SYSTEM AND
SECURITY SYSTEM
D/W-AL-Fabri-A-Top
Civil-Elec-A-Ground Review
HOSPITAL BED , PASSENGER AND
SERVICE ELEVATORS (9 UNITS )
D/W-AL-Instal-A-Basement
Civil-Elec-A-First Updates from the review
Milestone 2 Start
HEATING VENTILATION & AIR
D/W-AL-Instal-A-Ground CONDITIONING ( HVAC)
Civil-Elec-A-Second Submission for final approval
Civil- Electrical Conduiting

Civil-Elec-A-Third
NAWF-EWCEB-NC-EPC-SBH- MILESTONE-1 COMPLETION
CHHN-079-80-70 (1)

D/W-AL-Instal-A-First Pile Rebar Casing


MEDICAL GAS PIPE LINE SYSTEM Int/Ext-Paints-A-First
Installation of Aluminium Door/ (MGPS) Pile Works
Window Internal & External Primer/Paints Pile RCC Concrete Casting
D/W-AL-Instal-A-Second
Int/Ext-Paints-A-Second
FIRE FIGHTING SYSTEM
D/W-AL-Instal-A-Third Pile Load Test
Int/Ext-Paints-A-Third
FIRE ALARM SYSTEM & PUBLIC
ADDRESS (PA) SYSTEM
D/W-AL-Instal-A-Top Pile Cutoff
Submission of all Construction, GA, Int/Ext-Paints-A-Top
Schematic drawings details for all Civil
and MEP components PLUMBING WORKS
Waterproofing Basement Foundation Preparation:
Flooring-GTP-A-Basement Soling,PCC
ELECTRICAL ( CABLE & LIGHT
Int/Ext-Plaster-A-Ground FIXTURES) Flooring-GTP-A-Ground Basement Raft Rebar Cutting/Bending
Civil Finishes
Int/Ext-Plaster-A-First DATA NETWORKING & EPABX
Milestone-6 Start Flooring-GTP-A-First Basement Raft Formworks Carpentary
SYSTEM
Flooring- Granite, Vetrified Tiles,
Int/Ext-Plaster-A-Second Ceramic Tiles, Screeding & Punning
Internal & External Plaster Flooring-GTP-A-Second Basement Raft Formworks Shuttering
CCTV , ACCESS SYSTEM AND
SECURITY SYSTEM
Int/Ext-Plaster-A-Third Basement Raft Works
Flooring-GTP-A-Third Basement Raft Rebar Placing
Approval of Construction, GA-
Int/Ext-Plaster-A-Top Schematic Drawings all.
Flooring-GTP-A-Top Basement Raft RCC Concrete Casting

Int-PoP-A-Ground
Falseceiling-A-Ground Basement Raft Formwork
MILESTONE-2 COMPLETION Civil Structures Deshuttering
Int-PoP-A-First
Falseceiling-A-First Milestone-3 Start
Site Clerance Basement Floor
Sub-Structure Works Basement Column & Shearwall Rebar
Int-PoP-A-Second C/B-C
Internal Wall PoP Site Preliminary
Falseceiling-A-Second
Building Layout False Ceiling Works

Int-PoP-A-Third Basement Column & Shearwall


Falseceiling-A-Third Formworks Carpentary
Soil Excavation
Foundation Works
Int-PoP-A-Top
Falseceiling-A-Top Basement Column & Shearwall
Formworks Shuttering
Pile Boring Works
Int-Paints-A-Basement
Railing Works Basement Column & Shear Wall Works
Basement Column & Shearwall Rebar
Pile Rebar Cutting/Bending
Placing
Int/Ext-Paints-A-Ground
Expansion Joints Works
Basement Column & Shearwall RCC
MS Truss/Emergency Stair works Concrete Casting T/Cof Plubming Items

Basement Column & Shearwall T/C of HVAC Items


MILESTONE-6 COMPLETION Formworks De-Shuttering

T/C of Data Networking


Installation of Electrical Items Plinth Slab/Beam Rebar Cutting/
Bending
T/C of EPABX System
Installation of Plubming Items
Plinth Slab/Beam Formworks
Carpentary T/C of CCTV
Installation of HVAC Items

Plinth Slab/Beam Formworks T/C of Access System


MEP Testing & Commissioning
Installation of Data Networking Shuttering
Plinth Slab Level Works Milestone-8 Start
T/C of Security System
Installation of EPABX System Plinth Slab/Beam Rebar Placing

T/C of Fire Alarm System


Installation of CCTV Plinth Slab/Beam RCC Concrete
Casting
T/C of PA System
Installation of Access System
MEP Installation Works MEP WORKS Plinth Slab/Beam Formwork
Deshuttering T/C of Fire Fighting System
Milestone-7 Start
Installation of Security System

T/C of MGPS
MILESTONE-3 COMPLETION
Installation of Fire Alarm System

T/C of Hospital Elevators


Installation of PA System

Installation of Fire Fighting System MILETSTONE-8 COMPLETION

Installation of MGPS PROJECT HANDOVER

Installation of Hospital Elevators

MILESTONE-7 COMPLETION

T/C of Electrical Items