A. S. CANDELARIA III
(Sign over Printed Name)
Division Manager - EEICD
A. C. DE MESA
(Sign over Printed Name)
Division Manager - CECSD
PES-OVP-002.F01
Rev. No. 0
Man hour Man hour Man hour Man hour
(Existing Areas) (Existing Areas)
(Existing (New
MODULAR OPEN TYPE Areas/Transfer)
Areas) Man hour
Activities
OPEN/ (New Areas)
OPEN
CONTAINARI
ZED TYPE
MEDIUM MEDIUM
SPEED SPEED
Preparation of Plant Layout 12 12 18 16 4
Equipment and Piping Layout 4 4 24 80 4
Elevation N/A 1 8 8 N/A
Fuel Day Tank & Leak Fuel Tank House N/A N/A 8 8 N/A
Fuel oil Storage and Transfer System (P & I 1 of 2) N/A N/A 8 8 N/A
Fuel oil Storage and Transfer System (P & I 2 of 2) N/A N/A 8 8 N/A
High Temp Cooling System N/A N/A 4 4 N/A
Low Temp Cooling System N/A N/A 4 4 N/A
Lube Oil System (1 of 2) N/A N/A 4 6 N/A
Lube Oil System (2 of 2) N/A N/A N/A 6 N/A
Starting and Control Air System N/A N/A 2 2 N/A
Cooling Water Supply Piping System N/A N/A 2 2 N/A
Water Softener System (P & I Diagram) N/A N/A N/A 2 N/A
Combustion Air & Exhaust Gas System N/A N/A 1 1 N/A
Fuel Unloading Pumphouse N/A N/A N/A 6 N/A
Airconditioning& Ventilation System N/A N/A 2 N/A 2
List of Symbols N/A N/A 15 mins 15 mins N/A
Typical Fuel Oil Filling System (P & I) 4 4 N/A N/A 2
Typical (Day tank) 1 1 1
Typical Domestic Water System (P& I) 1 N/A N/A N/A 2
Shallow Well Details 1 N/A N/A N/A 1
Typical Genset Weatherproof Enclosure 1 N/A N/A N/A 1
Diesel Genset on Skid N/A 1 N/A N/A N/A
Diesel FOST and Piping System N/A N/A N/A 10 N/A
Diesel FOST(Tank Section, pipe Supports, Drains and valve box) N/A N/A N/A 8 N/A
Diesel FOST (Shell Plate Arrangement & Details) N/A N/A N/A 4 N/A
Diesel FOST (Orientation & Anchor Bolt Details N/A N/A N/A 8 N/A
Diesel FOST (Stairway, Handrails & Bottom Plate Arrangement) N/A N/A N/A 4 N/A
Diesel (Rafter Details) N/A N/A N/A 8 N/A
Diesel FOST (Shell and Roof Manhole Details) N/A N/A N/A 4 N/A
Diesel FOST (Nozzle Details) N/A N/A N/A 4 N/A
Diesel FOST (Level Gauge Indicator) N/A N/A N/A 4 N/A
Diesel FOST (Cooling Water System N/A N/A N/A 4 N/A
Diesel FOST ( Foam Protection System ) N/A N/A N/A 4 N/A
Diesel (FOST ( Sprinkler System) N/A N/A N/A 4 N/A
Diesel FOST ( Fuel Day Tank and Leak Oil Tank House) N/A N/A N/A 4 N/A
Total Manhour for preparation of BDM: 59
Estimate Manhour for CW: 40
Estimate Manhour for EW: 100
Total Manhour for preparation of BD: 199
TS 4
TDS 4
SOR 2
BOQ internal 6
consolidated sor 8
total MH 24
MONTHLY TOTAL MONTHLY
PERSONNEL MONTHLY BASIC ANNUAL COMPENSATION
ALOWANCE COMPENSATION
STATUTORY CONTRIBUTION
MEDICAL ACCRUED
UNIFORM
GSIS STATE INSURANCE PHILHEALTH PAGIBIG BENEFIT LEAVES
PERSONNEL
Engineer II
Engineer I
Cadet Engr.
13TH MONTH +
CMTS PROVIDENT FUND 14TH MONTH ANNUAL COMPENSATION RATES/HR
CASH GIFT
& CADET PERSONNEL WHICH ARE NOT INCLUDED IN THE CURRENT PAY
LE/SALARY GRADE, USE DIFFERENT RATES/HR AS LISTED BELOW:
MONTHLY
ANNUAL COMPENSATION RATES/HR
BASIC
36,942.4 531,970.56 209.90
25,231.8 363,337.92 143.36
17,917.9 215,015 101.81
DESIGN AND DEVELOPMENT DEPARTMENT
CY 2020 OVERHEAD RATES
As of: 43871
Note:
1 OM-DDD Budget is distributed to the four (4) Divisions. Computation is based on percentage share.
2 Factory Overhead Rate is the Ratio of the Total Indirect Cost and the Base Manhours per Divisions.
3 The following cost items shall be included during the costing products/services.
- Actual travelling expenses incurred inclusive of fares, per diem and lodging
-Equipment rental based on the actual utilized hours of the equipment
CEAD EEICD CECSD
PHP PHP PHP
percentage share.
hours per Divisions.