Procedure/Requirements Assigned Personnel Duration Man-hour rate Equivalent Cost

1. Review of FS and GIS CAG - 1 CSS-C 2- 3 months


1 CSO-C
1 Manager
2. Processing of CA/FABD CAG - 1 CSS-C 1 Week
1 CSO-C
1 Manager
3. Checking of PES - 1 PE-A 7 Days per submission of
Drawings/Submittals 1 PE-B, C or Sr. Engr. technical documents
4. Monitoring of Project PES - 1 PE-A Whole project duration
1 PE-C or Sr. Engr. 6 months to 1 year
SPUG 1 PE-A
1 PE-B or C
5. Witness Test and PES - 1 PE-A 2 weeks
Commissioning 1 PE-C or Sr. Engr.
SPUG 1 PE-A
1 PE-B or C
6. Processing of Legal Legal 1 day
Documents
7. Actual Connection to
the grid (service fee for
connection)