1 CSO-C 1 Manager 2. Processing of CA/FABD CAG - 1 CSS-C 1 Week 1 CSO-C 1 Manager 3. Checking of PES - 1 PE-A 7 Days per submission of Drawings/Submittals 1 PE-B, C or Sr. Engr. technical documents 4. Monitoring of Project PES - 1 PE-A Whole project duration 1 PE-C or Sr. Engr. 6 months to 1 year SPUG 1 PE-A 1 PE-B or C 5. Witness Test and PES - 1 PE-A 2 weeks Commissioning 1 PE-C or Sr. Engr. SPUG 1 PE-A 1 PE-B or C 6. Processing of Legal Legal 1 day Documents 7. Actual Connection to the grid (service fee for connection)