Professional Documents
Culture Documents
Me E161 Bridge 008 14.11.2023
Me E161 Bridge 008 14.11.2023
450 5190
70 1245 1225 1456
1225
498
169
292
74
600 3 600 3 600 3 600 3 600 3
WL WL WL
SEC-B
121
3530
3889
3089
±1.02M
FPL
600
600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 574
129
WL WL
400
292
71
121
6061
KEY PLAN
EMAAR APPROVED
EXISTING COMPOUND WALL SOAK-AWAY
EMAAR APPROVED
UNDER CONSTRUCTION
COMPOUND WALL
LANDING
LINE OF FUTURE
SWIMMING POOL
LINE OF FUTURE
LINE OF FUTURE PAVILION
GAZEBO
EMAAR APPROVED
EXISTING COMPOUND
WALL
+1.02
BASEMENT EXTERNAL LVL BASEMENT
REF. LINE REF. LINE
PART- B
+0.67
+0.67
LVL
LVL
PROPOSED VILLA
SLOPE
SLOPE
(B+G+1 FLOOR)
PART- A
SLOPE (1:10)
DN
)
(1:10 +1.02 SLO
PE PE
BASEMENT REF.LINE SLO DROP OFF LVL (1:10
)
+0.63
LVL
SLOPE (1:15)
+0.63
LVL
SECURITY &
SLOPE
SOAK-AWAY
SLOPE
SUB-STATION &
LV ROOM
ENTRY BLANK
GARBAGE ROOM
NEW COMPOUND
WALL COMPOUND WALL
±0.00 GATE LEVEL
RAMP
70
470 1000 1000 1000 1000 648 394-540 EMIRATES HILLS
THIRD, DUBAI
CLIENT NAME
PROJECT MANAGEMENT
169
292
74
600 3 600 3 600 3 600 3 600 3
WL WL WL
CONSULTANT
SPACETECH
ENGINEERING CONSULTANCY SERVICES
Engi neeri ng Excel lence
SEC-B
Architects & Consulting Civil/Structural Engineering
121
DESIGNER
3530
3889
3089
±1.02M
FPL CONTRACTOR
SUB-CONTRACTOR
MINERAL
EXPERTISE
Office 1004-4 Control Tower
Motor City Dubai UAE
600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 574 Tel +971 4 878 69 16
Email : me@mineralexpertise.com
129
WL WL GENERAL NOTES
1. DRAWINGSAND SPECIFICATIONS,as instrumentsof service, are the
exclusive property of MINERAL EXPERTISEMARBLE AND STONES
whether the project for which they were prepared is executed and
292
400
DRAWING TITLE
6061
04 12.10.2023 ISSUED FOR APPROVAL
05 06.11.2023 ISSUED FOR APPROVAL
06 08.11.2023 ISSUED FOR APPROVAL
07 09.11.2023 ISSUED FOR APPROVAL
08 14.11.2023 ISSUED FOR APPROVAL
SCALE AS SHOWN
E161 - PEDESTRIAN BRIDGE PAGE NO. 2 OF 7
D-2 COPING DETAILS - OPTION 2 DRAWING BY
EMAAR APPROVED
UNDER CONSTRUCTION
COMPOUND WALL
LANDING
LINE OF FUTURE
SWIMMING POOL
4155
LINE OF FUTURE
LINE OF FUTURE PAVILION
GAZEBO
EMAAR APPROVED
EXISTING COMPOUND
WALL
+1.02
BASEMENT EXTERNAL LVL BASEMENT
REF. LINE REF. LINE
PART- B
71 1600 2485
+0.67
+0.67
LVL
LVL
PROPOSED VILLA
SLOPE
SLOPE
(B+G+1 FLOOR)
PART- A
SLOPE (1:10)
DN
)
(1:10 +1.02 SLO
PE PE
BASEMENT REF.LINE SLO DROP OFF LVL (1:10
)
+0.63
LVL
SLOPE (1:15)
+0.63
LVL
SECURITY &
SLOPE
SOAK-AWAY
SLOPE
SUB-STATION &
LV ROOM
ENTRY BLANK
GARBAGE ROOM
NEW COMPOUND
WALL COMPOUND WALL
±0.00 GATE LEVEL
RAMP
PROJECT NAME
FALL
528
±601
549
4341
SPACETECH
±4564 ENGINEERING CONSULTANCY SERVICES
Engi neeri ng Excel lence
Architects & Consulting Civil/Structural Engineering
07 SCALE NTS
CONTRACTOR
4155
71 1600 2485 Tel.: 04-347 0379 04-347 0379 :
Fax.: 04-347 0208
P.O. Box 37564 HennesseyL.L.C. 04-34737564
0208 :
:
SUB-CONTRACTOR
MINERAL
EXPERTISE
Office 1004-4 Control Tower
Motor City Dubai UAE
Tel +971 4 878 69 16
Email : me@mineralexpertise.com
GENERAL NOTES
1. DRAWINGSAND SPECIFICATIONS,as instrumentsof service, are the
exclusive property of MINERAL EXPERTISEMARBLE AND STONES
whether the project for which they were prepared is executed and
constructedor not. Thesedocumentsare not to be reproducedin any form
and they are not to be used by the project owner nor any other entity in
whole or part on any other projects.Or for any additionsor alterationsto
the originalprojectexceptby writtenauthorizationand permissionfrom and
FALL 4.
NOTED OTHERWISE
ALL DIMENSIONSTO BE VERIFIEDON SITE & APPROVEDBY THE
ENGINEER
DRAWING TITLE
528
PROPOSED PEDESTRIAN BRIDGE IN
±601
EXISTING VILLA NO. E161
549
02
02.10.2023
02.10.2023
ISSUED FOR APPROVAL
4341 03
04
06.10.2023
12.10.2023
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
05 06.11.2023 ISSUED FOR APPROVAL
±4564 06
07
08.11.2023
09.11.2023
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
08 14.11.2023 ISSUED FOR APPROVAL
REVISION NO. 08
CHECKED BY
KEY PLAN
EMAAR APPROVED
EXISTING COMPOUND WALL SOAK-AWAY
EMAAR APPROVED
UNDER CONSTRUCTION
COMPOUND WALL
℄ ℄
LANDING
LINE OF FUTURE
SWIMMING POOL
LINE OF FUTURE
LINE OF FUTURE PAVILION
GAZEBO
EMAAR APPROVED
EXISTING COMPOUND
WALL
+1.02
BASEMENT EXTERNAL LVL BASEMENT
REF. LINE REF. LINE
PART- B
+0.67
+0.67
LVL
LVL
PROPOSED VILLA
SLOPE
SLOPE
(B+G+1 FLOOR)
PART- A
SLOPE (1:10)
DN
)
(1:10 +1.02 SLO
PE PE
BASEMENT REF.LINE SLO DROP OFF LVL (1:10
)
+0.63
LVL
SLOPE (1:15)
+0.63
LVL
SECURITY &
SLOPE
SOAK-AWAY
SLOPE
SUB-STATION &
LV ROOM
ENTRY BLANK
GARBAGE ROOM
NEW COMPOUND
WALL COMPOUND WALL
±0.00 GATE LEVEL
RAMP
PROJECT NAME
123
30 140
30 140
PROJECT MANAGEMENT
395
395
D-7
04
20
20
400 30 30 3 400 3
CONSULTANT
DESIGNER
30 340 30
30
137 3 30
120 30
Tel.: 04-347 0379 04-347 0379 :
30 90 3
120
90 141 SUB-CONTRACTOR
137
30 MINERAL
30
EXPERTISE
Office 1004-4 Control Tower
Motor City Dubai UAE
30
GENERAL NOTES
538
1. DRAWINGSAND SPECIFICATIONS,as instrumentsof service, are the
exclusive property of MINERAL EXPERTISEMARBLE AND STONES
whether the project for which they were prepared is executed and
constructedor not. Thesedocumentsare not to be reproducedin any form
395
and they are not to be used by the project owner nor any other entity in
365
whole or part on any other projects.Or for any additionsor alterationsto
385
the originalprojectexceptby writtenauthorizationand permissionfrom and
agreementwith MINERALEXPERTISEMARBLEAND STONES Violators
will be prosecuted under all applicable laws.
365
DRAWING TITLE
20 35
20
BY REV. DATE DESCRIPTION
30
30
30 400 30 02
03
02.10.2023
06.10.2023
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
400 460 04
05
12.10.2023
06.11.2023
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
06 08.11.2023 ISSUED FOR APPROVAL
07 09.11.2023 ISSUED FOR APPROVAL
08 14.11.2023 ISSUED FOR APPROVAL
REVISION NO. 08
CHECKED BY
KEY PLAN
EMAAR APPROVED
EXISTING COMPOUND WALL SOAK-AWAY
EMAAR APPROVED
UNDER CONSTRUCTION
COMPOUND WALL
LANDING
LINE OF FUTURE
SWIMMING POOL
LINE OF FUTURE
LINE OF FUTURE PAVILION
GAZEBO
EMAAR APPROVED
EXISTING COMPOUND
WALL
+1.02
BASEMENT EXTERNAL LVL BASEMENT
REF. LINE REF. LINE
PART- B
+0.67
+0.67
LVL
LVL
PROPOSED VILLA
SLOPE
SLOPE
(B+G+1 FLOOR)
PART- A
SLOPE (1:10)
DN
)
(1:10 +1.02 SLO
PE PE
BASEMENT REF.LINE SLO DROP OFF LVL (1:10
)
+0.63
LVL
SLOPE (1:15)
+0.63
LVL
SECURITY &
SLOPE
SOAK-AWAY
SLOPE
SUB-STATION &
LV ROOM
ENTRY BLANK
GARBAGE ROOM
NEW COMPOUND
WALL COMPOUND WALL
±0.00 GATE LEVEL
RAMP
PROJECT NAME
CONSULTANT
675
\A1;14834
140 400 853 70 810 1020
4210
1020 1290
1093
\A1;5450
DESIGNER
CONTRACTOR
123
30 140
SUB-CONTRACTOR
9100
MINERAL
EXPERTISE
Office 1004-4 Control Tower
Motor City Dubai UAE
528
GENERAL NOTES
395
( 247.07')
exclusive property of MINERAL EXPERTISEMARBLE AND STONES
whether the project for which they were prepared is executed and
75.31
constructedor not. Thesedocumentsare not to be reproducedin any form
and they are not to be used by the project owner nor any other entity in
1553 7
whole or part on any other projects.Or for any additionsor alterationsto
the originalprojectexceptby writtenauthorizationand permissionfrom and
agreementwith MINERALEXPERTISEMARBLEAND STONES Violators
5640 will be prosecuted under all applicable laws.
450 5190 2. DO NOT SCALE FROM THE DRAWINGS
70
470 1000 1000 1000 1000 631 3. ALL DIMENSIONS AND LEVELS ARE IN MILLIMETERSUNLESS
NOTED OTHERWISE
2035
394-
498
ENGINEER
291
74
600 3 600 3 600 3 600 3 600 3
DRAWING TITLE
SEC-B
121
EXISTING VILLA NO. E161
3350
3889
3089
30 400 30
00 27.09.2023 ISSUED FOR APPROVAL
01 02.10.2023 ISSUED FOR APPROVAL
\ 1;
A
153
600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 574
+ 0.67
02 02.10.2023 ISSUED FOR APPROVAL
LVL
292
400
502 1720
71 600 1000
6061
1000
4340
SEC-A
121
1000 669
04
05
06
07
12.10.2023
06.11.2023
08.11.2023
09.11.2023
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
08 14.11.2023 ISSUED FOR APPROVAL
DRAWING BY
04 SCALE NTS 04 SCALE NTS
REVISION NO. 08
CHECKED BY
KEY PLAN
EMAAR APPROVED
EXISTING COMPOUND WALL SOAK-AWAY
EMAAR APPROVED
UNDER CONSTRUCTION
COMPOUND WALL
LANDING
LINE OF FUTURE
SWIMMING POOL
LINE OF FUTURE
LINE OF FUTURE PAVILION
5
GAZEBO
EMAAR APPROVED
EXISTING COMPOUND
WALL
+1.02
BASEMENT EXTERNAL LVL BASEMENT
REF. LINE REF. LINE
PART- B
23
+0.67
+0.67
LVL
LVL
PROPOSED VILLA
SLOPE
SLOPE
(B+G+1 FLOOR)
45
PART- A
50
SLOPE (1:10)
DN
22
)
(1:10 +1.02 SLO
PE PE
BASEMENT REF.LINE SLO DROP OFF LVL (1:10
)
23 23 SLOPE (1:10)
+0.63
LVL
+0.48
DRIVE WAY
SLOPE
(1:10)
SLOPE (1:15)
+0.63
LVL
SECURITY &
SLOPE
SOAK-AWAY
SLOPE
SUB-STATION &
55
LV ROOM
ENTRY BLANK
GARBAGE ROOM
NEW COMPOUND
WALL COMPOUND WALL
±0.00 GATE LEVEL
RAMP
9
PROJECT NAME
5 45
15
50
VILLA NO. E161
PLOT NO. LOCATION
40
100
82
90
394-540 EMIRATES HILLS
4 4
THIRD, DUBAI
3
27
CLIENT NAME
9
5
50
PROJECT MANAGEMENT
CONSULTANT
SPACETECH
ENGINEERING CONSULTANCY SERVICES
Engi neeri ng Excel lence
Architects & Consulting Civil/Structural Engineering
DESIGNER
27 40 15
82
D-10 CONTRACTOR
05
GENERAL NOTES
1. DRAWINGSAND SPECIFICATIONS,as instrumentsof service, are the
D-11 exclusive property of MINERAL EXPERTISEMARBLE AND STONES
03 whether the project for which they were prepared is executed and
constructedor not. Thesedocumentsare not to be reproducedin any form
and they are not to be used by the project owner nor any other entity in
whole or part on any other projects.Or for any additionsor alterationsto
the originalprojectexceptby writtenauthorizationand permissionfrom and
agreementwith MINERALEXPERTISEMARBLEAND STONES Violators
will be prosecuted under all applicable laws.
60 2.
3.
DO NOT SCALE FROM THE DRAWINGS
ALL DIMENSIONS AND LEVELS ARE IN MILLIMETERSUNLESS
15
NOTED OTHERWISE
4. ALL DIMENSIONSTO BE VERIFIEDON SITE & APPROVEDBY THE
ENGINEER
36
36
DRAWING TITLE
40
10
82
36
03 06.10.2023 ISSUED FOR APPROVAL
27
04 12.10.2023 ISSUED FOR APPROVAL
05 06.11.2023 ISSUED FOR APPROVAL
06 08.11.2023 ISSUED FOR APPROVAL
07 09.11.2023 ISSUED FOR APPROVAL
DRAWING BY
05 SCALE NTS REVISION NO. 08
CHECKED BY
KEY PLAN
EMAAR APPROVED
EXISTING COMPOUND WALL SOAK-AWAY
EMAAR APPROVED
UNDER CONSTRUCTION
COMPOUND WALL
LANDING
LINE OF FUTURE
SWIMMING POOL
LINE OF FUTURE
LINE OF FUTURE PAVILION
GAZEBO
EMAAR APPROVED
EXISTING COMPOUND
4210
WALL
+1.02
BASEMENT EXTERNAL LVL BASEMENT
REF. LINE REF. LINE
+0.67
+0.67
LVL
LVL
PROPOSED VILLA
SLOPE
SLOPE
(B+G+1 FLOOR)
1093 PART- A
SLOPE (1:10)
4210
DN
)
(1:10 +1.02 SLO
PE PE
BASEMENT REF.LINE SLO DROP OFF LVL (1:10
)
1020 1290
SLOPE (1:10) (1:10)
1020
SLOPE
810
+0.48
70
DRIVE WAY
+0.63
LVL
SLOPE (1:15)
+0.63
LVL
SECURITY &
SLOPE
SOAK-AWAY
SLOPE
SUB-STATION &
LV ROOM
ENTRY BLANK
GARBAGE ROOM
NEW COMPOUND
WALL COMPOUND WALL
±0.00 GATE LEVEL
RAMP
PROJECT NAME
PROJECT MANAGEMENT
CONSULTANT
SPACETECH
ENGINEERING CONSULTANCY SERVICES
Engi neeri ng Excel lence
Architects & Consulting Civil/Structural Engineering
DESIGNER
1553 CONTRACTOR
5640
Tel.: 04-347 0379 04-347 0379 :
450 5190 Fax.: 04-347 0208
70 P.O. Box 37564 HennesseyL.L.C. 04-34737564
0208 :
:
470 1000 1000 1000 1000 648
SUB-CONTRACTOR
MINERAL
498
169
292
291
EXPERTISE
74
600 3 600 3 600 3 600 3 600 3
GENERAL NOTES
1. DRAWINGSAND SPECIFICATIONS,as instrumentsof service, are the
SEC-B
121 exclusive property of MINERAL EXPERTISEMARBLE AND STONES
whether the project for which they were prepared is executed and
constructedor not. Thesedocumentsare not to be reproducedin any form
and they are not to be used by the project owner nor any other entity in
3530
3889
3089
DRAWING TITLE
600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 600 3 574 PROPOSED PEDESTRIAN BRIDGE IN
+ 0.67
DRAWING BY
REVISION NO. 08
CHECKED BY