DMAIC Problem Solving Templates

A homeowner discovered their right front tire was flat when getting ready to run errands. Upon inspection, nails were found in the driveway where roofing work had recently been done. A why-why analysis identified the likely root cause as nails from roofing work ending up in the driveway, which then punctured the tire and caused it to lose air.

Uploaded by

kpriyad2005
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views7 pages

DMAIC Problem Solving Templates

A homeowner discovered their right front tire was flat when getting ready to run errands. Upon inspection, nails were found in the driveway where roofing work had recently been done. A why-why analysis identified the likely root cause as nails from roofing work ending up in the driveway, which then punctured the tire and caused it to lose air.

Uploaded by

kpriyad2005
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
  • Problem Solving Form (DMAIC Lite)
  • Problem Solving Form (DMAIC Lite) - Example

Problem Solving Form (DMAIC Lite)

DEFINE
Plant Equipment Date Problem Potential Initiator

Team Members Tracking Number


Describe Problem Start Date:
Completion Date:
What:
When:
Initial Data
Where:
Who:

Problem Statement

MEASURE
In this space insert charts and/or drawings to stratify the problem to the lowest level. Use additional forms if necessary.

ANALYSIS
4-M Analysis [ Brainstorm potential causes of the incident based on data, observation, and experience. ]

huMAN MACHINE

Problem Statement
METHOD MATERIAL
ANALYSIS (Continued)
Why-Why Analysis [ Evaluate "The Critical Few" to identify Root Cause(s). ]

WHY? WHY? WHY? WHY?

Problem Statement

POTENTIAL ROOT CAUSES


Rank Potential Root Cause Rank Potential Root Cause

IMPROVE
Countermeasure Ladder
Top Root Cause(s) Countermeasure Level Responsible Target Completion Date Actual Completion Date

CONTROL
CHECK RESULTS REPLICATE AND STANDARDIZE

Countermeasure Time Period Tracked Results Item Required Description Target Date Responsible Completion Date
Std Work/SOP Update Yes No
Educated? Yes No
Update PM? Yes No
Replication Yes No
Yes No
Yes No
Problem Solving Form (DMAIC
Lite) DEFINE
Plant Equipment Date Problem Potential Initiator
Home Car 1/10/2021 Wreck Me
Team Members Tracking Number 1
Describe Problem Flat Tire
Start Date: 1/10/2021
Me
Completion Date:
What: Flat Tire Right front 1/10/2021

Initial Data When: 1/10/2021


Where: Driveway
Who: Me

Problem Statement I got ready to run errands and saw my right front tire was flat

MEASURE
In this space insert charts and/or drawings to stratify the problem to the lowest level. Use additional forms if necessary.

Nails found in this area

ANALYSIS
4-M Analysis [ Brainstorm potential causes of the incident based on data, observation, and experience. ]

huMAN MACHINE

Flat scraper used to pull shingles


New Hires on Job No tools to pick up nails
off - Nails came out at same time
Problem Statement

Flat Right Front Tire

Training procedures non Rubber Tire


Steel Nails
existent

Nails in driveway and yard


METHOD MATERIAL
ANALYSIS (Continued)
Why-Why Analysis [ Evaluate "The Critical Few" to identify Root Cause(s). ]

WHY? WHY? WHY? WHY? WHY?

Tire Lost Air Contractor did not clean up No Procedures to address


Roofing Nail in Tire Nail in Driveway nails lost nails

No Tools to help find lost


Problem Statement nails

No catch mechanism to catch


Right Front Tire Flat
wayward nails

POTENTIAL ROOT CAUSES


Rank Potential Root Cause Rank Potential Root Cause
1 No procedures to catch lost nails

2 No tools to help find lost nails

3 No catch mechanism to catch wayward nails

IMPROVE
Countermeasure Ladder
Top Root Cause(s) Countermeasure Level Responsible Target Completion Date Actual Completion Date
Develop procedure and educational plan for associates to find
No procedures to catch lost nails 1 Contractor 1/15/2021 1/15/2021
nails

No tools to help find lost nails Purchase and begin using magnet to pick up nails 5 Contractor 1/15/2021 1/15/2021

Design and implement catch mechanism to eliminate nails from


No catch mechanism to catch wayward nails 6 Contractor 1/15/2021 1/15/2021
reaching the ground

CONTROL
CHECK RESULTS REPLICATE AND STANDARDIZE

Countermeasure Time Period Tracked Results Item Required Description Target Date Responsible Completion Date
Std Work/SOP Update Yes No Updated procedures 1/15/2021 Contractor 1/25/2021
Procedure to find nails 3 months No flat tires from customers
Educated? Yes No Educated Team 1/21/2021 Contractor 1/25/2021
No flat tires from customers Update PM? Yes No PM Procedures updated 1/15/2021 Contractor 1/15/2021
Use magnet to pick up nails 3 months
No nails found on driveway Replication Yes No Replicated to crews 1/15/2021 Contractor 1/15/2021
No flat tires from customers Yes No
Catch mechanism 3 months
No nails found on driveway Yes No