Professional Documents
Culture Documents
ENGINEERING
FOUNDATION
1998
DATE:
DECEMBER 0.7
2.0 1.5 1.3 9.2 1.3 1.7 1.5 L.5
Cc 1.0 5.0 2.4 1.7 1.4 4.3 2.6 1.1
22.0
10.0 3.5 12.0 6.2 25 16.0 3.8 3.4 67.5 3.8 4.3 .3 3.8
Cu 1.9 11.0
B.2
P.S.D.
FINES 21 10 72 67 72 23
cO.075 24 5 27
15 13 23 14 11 3
mm%
3
79 30 28 S6
SAND
5.0-0.075 92 95 73 92 90 28
mm 36 89 90 76
% 97 85 87
11
GRVL 2 3
>5.0 mi 0
%
34
R
/m²) P.P
(KN 24
5
STRENGTH
TV.
R
RESULTS SHEAR R
L.V.
UNDRAINED
TEST 50
E
U.C.S.
LABORATORY
:S,
KN/m²
19 20 19 22 24 19
P.J. %
LIMITS
ATTERBERG
OF 23 22 20 25 25
P.L.
SUMMARY %
20
L.L. 39 43 41 42 50 44
|8
Mg
m
/ 1.54 1.491.57 1.60 .73 1.74 1.8 1.69 1.60 1.69
DRY 1.34 1.54 1.51 1,47 1.87
Y
INVESTIGATION 1.92 1.99 2.07 1.95 2.15 2.10 2.32 2.06 2.06 2.10
WET Mg
m
/ 1.63 1.99 1.90 1.76 2.07
29.0 26.0 34.0 20.0 22.0 25.0 28.0 34.0 27.0 21.0 27.0 20.0 19,0 20.0 21.0 34.0 35.0 32.0 48.0 39.0 14.0
M.C. 22.0
%
LNG
PETRONET
Ltd.
SITE
/11166 ELEV. CD 13.5515.0516.5518.0519.5521.0521.9523.4524.9526.4527.9529.4530.9532.4533.9535.4536.9538,4539.9541.4542.9544.4546.9547.4548.9549.45
9.95 10.9511.95
JETTY m
/IND 34.50
DEPTH
SAMPLE
REF. bSBL 12.0013.5015.0016.5018.0019.5021.0022,5024.0025.5027.0028.5030.0031.5033.00 36.0037.5039.0039.50
11.10
DAHEJ 0.00 1.00 2.00 3.60 5.10 6.60 8.10 9.60
CD
680 m
m
CF TYPE SPT SPT SPT SPT SPTSPT SPTSPTSPT SPT SPT SPT SPT SPT SPT SPT SPT
D D D D D
No.: 9.95 B B
No. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28
CONTRACT:05
PROJECT: BH
No 1 2 3 4 6 8
11
:CLIENT
SBL: No. 05 05 05 05 05 05 05 05 05 05 05 05 05 05 95 05 05 05 05 05 05 05 05 05 05 95
BH
PROUECT : MARINE GEOTECHNICAL INVESTIGATION FOR AN LNG TERMINAL
AT DAHEJFOR PETRONET LNG Ltd.
CLIENT: PETRONET LNG Ltd.
ONTRACT No, :; CF $80 I DXB/11166
0.00 9.95
3.60 13.55 18 29 22 25 94 High blows due to frags of casing'
5.10 15.05 5 8 12| 20 24 26 82 High blows due to frags of casing
6.60 16.55 3 4 7 11 13 15 46
8.10 18.05 2 4 8 10 14 16 48
9.60 19.55 13 19 23 | 28 83
11.10 21.05 4 4 5 10 11 30
12.00 21.95 3 4 10 13 37
13.50 23.45 5 3 7 12 17 44
15.00 24.95 7 13 16 20 58
18.00 27.95 S 7 8 12 15 45
21.00 30.95 S 7 12 15 18 24 69
24.00 33.95 12 14 17 23 66
30.00 39.95 5 13 20 27 35 95
33.00 42.95 6 15 22 26 29 92
36.00 45.95 3 2 2 2 3 7 14
EOB
Spt