You are on page 1of 2

ENGINEERING

ENGINEERING
FOUNDATION
1998
DATE:
DECEMBER 0.7
2.0 1.5 1.3 9.2 1.3 1.7 1.5 L.5
Cc 1.0 5.0 2.4 1.7 1.4 4.3 2.6 1.1

22.0
10.0 3.5 12.0 6.2 25 16.0 3.8 3.4 67.5 3.8 4.3 .3 3.8
Cu 1.9 11.0
B.2

P.S.D.
FINES 21 10 72 67 72 23
cO.075 24 5 27
15 13 23 14 11 3
mm%
3

79 30 28 S6
SAND
5.0-0.075 92 95 73 92 90 28
mm 36 89 90 76
% 97 85 87

11
GRVL 2 3
>5.0 mi 0
%

34
R
/m²) P.P
(KN 24
5
STRENGTH
TV.
R

RESULTS SHEAR R
L.V.
UNDRAINED
TEST 50
E
U.C.S.
LABORATORY
:S,
KN/m²

19 20 19 22 24 19
P.J. %
LIMITS
ATTERBERG

OF 23 22 20 25 25
P.L.
SUMMARY %
20

L.L. 39 43 41 42 50 44
|8

Mg
m
/ 1.54 1.491.57 1.60 .73 1.74 1.8 1.69 1.60 1.69
DRY 1.34 1.54 1.51 1,47 1.87
Y

INVESTIGATION 1.92 1.99 2.07 1.95 2.15 2.10 2.32 2.06 2.06 2.10
WET Mg
m
/ 1.63 1.99 1.90 1.76 2.07

29.0 26.0 34.0 20.0 22.0 25.0 28.0 34.0 27.0 21.0 27.0 20.0 19,0 20.0 21.0 34.0 35.0 32.0 48.0 39.0 14.0
M.C. 22.0
%
LNG
PETRONET
Ltd.
SITE
/11166 ELEV. CD 13.5515.0516.5518.0519.5521.0521.9523.4524.9526.4527.9529.4530.9532.4533.9535.4536.9538,4539.9541.4542.9544.4546.9547.4548.9549.45
9.95 10.9511.95
JETTY m
/IND 34.50
DEPTH
SAMPLE
REF. bSBL 12.0013.5015.0016.5018.0019.5021.0022,5024.0025.5027.0028.5030.0031.5033.00 36.0037.5039.0039.50
11.10
DAHEJ 0.00 1.00 2.00 3.60 5.10 6.60 8.10 9.60
CD
680 m
m
CF TYPE SPT SPT SPT SPT SPTSPT SPTSPTSPT SPT SPT SPT SPT SPT SPT SPT SPT
D D D D D
No.: 9.95 B B

No. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28
CONTRACT:05
PROJECT: BH
No 1 2 3 4 6 8
11

:CLIENT
SBL: No. 05 05 05 05 05 05 05 05 05 05 05 05 05 05 95 05 05 05 05 05 05 05 05 05 05 95
BH
PROUECT : MARINE GEOTECHNICAL INVESTIGATION FOR AN LNG TERMINAL
AT DAHEJFOR PETRONET LNG Ltd.
CLIENT: PETRONET LNG Ltd.
ONTRACT No, :; CF $80 I DXB/11166

SUMNARY OF SPT RESULTS

BH Depth Elevation SPT DETAILS REMARKS

No. m bSBL m CD SICI75 75 75 75 75 75 N

0.00 9.95
3.60 13.55 18 29 22 25 94 High blows due to frags of casing'
5.10 15.05 5 8 12| 20 24 26 82 High blows due to frags of casing
6.60 16.55 3 4 7 11 13 15 46
8.10 18.05 2 4 8 10 14 16 48
9.60 19.55 13 19 23 | 28 83

11.10 21.05 4 4 5 10 11 30
12.00 21.95 3 4 10 13 37

13.50 23.45 5 3 7 12 17 44

15.00 24.95 7 13 16 20 58

18.00 27.95 S 7 8 12 15 45

21.00 30.95 S 7 12 15 18 24 69

24.00 33.95 12 14 17 23 66

27.00 36.95 7 6 10 23 27 60 60/225

30.00 39.95 5 13 20 27 35 95

33.00 42.95 6 15 22 26 29 92

36.00 45.95 3 2 2 2 3 7 14

39.50 49.45 8 10 25 28 44 97 97/225

EOB

NOTES: 1:Prior toSPT at 3.60m casing thread sheared.


Fragments remained in BH,shelled out after SPT @ 5.10m

Spt

You might also like