Professional Documents
Culture Documents
4 3 2 1
SUBASSEMBLY ASSEMBLY
SMMXX-SMS500 SMMXX-AMS100
5200
SMMXX-MLP101
SMMXX-MMS179 SMMXX-MLP104 SMMXX-MMS226
CLASS.B
15 11 11 10 18 11 11 21 10 11 24
11 16 19 20 23 11
11 DET.28 SMMXX-MMS222 11 11 SMMXX-MMS224 DET.28 11
11
D CLASS.B D
SMMXX-MMS202 SMMXX-MMS204
THK
5200 3 +2-0
2 +1-0
200 833 1567 1400 1000 200
WELD DETAIL 28
TC C 1/2 V
SMMXX-MLP104
SMMXX-MLP101 SMMXX-MMS179 SMMXX-MMS161 45° +1
C -5° 0° C
SMMXX-MMS160 32
CLASS.B 31 10 DET.28
25 11 11 11 10 11
11 26 10 28 29 30 DET.28 11 34
11 CLASS.B 33
THK
11 DET.28 SMMXX-MMS228 11 11 CLASS.B 11
11
SMMXX-MMS203
+1
2 -0
SMMXX-MMS205
3 +2-0
CLASS.B
C 700
5) WELDS NUMBERS FROM 15 TO 50 DELETED 43, 44
6) ALL WELDS SHALL BE NDT CAT.C U.N.O.
C
37
DET.28 7) SMMXX PRIMARY LOCALIZATIION CODE=SMM11 TO SMM20 FOR SEPARATED MUDMAT
B 46 CLASS.B B
3 SIDES DET.24 8) SURFACE OF CHORD MEMBERS TO BE WELDED SHALL BE ULTRASONICALLY INSPECTED BEFORE WELDING (LAMINATION CHECK)
NOTE 8 SMMXX-MMS134 NOTE 8
SMMXX-MLP104
CLASS.B
220
CLASS.B
47
430
36 DET.24 F10395-SAI-DSS-DWG-S3486_01 SEPARATED MUDMAT - MAIN STRUCTURE - ARRANGEMENT & DETAILS
SMMXX-MMS160 DET.24 39 NOTE 8 F10395-SAI-DSS-DWG-S3487_03 SEPARATED MUDMAT - LIFTING PADEYES - ARRANGEMENT & DETAILS
10
35
DET.28
10
NOTE 8 DET.28
NOTE 8
C CLASS.B
C AFC 14.04.2023 REVISED WHERE INDICATED 2LGS F.M. P.P.N.
NOTE 8 CLASS.B B AFC 30.03.2023 REVISED WHERE INDICATED INEN F.M. P.P.N.
CLASS.B A AFC 14.03.2023 ISSUED FOR CONSTRUCTION STAFF F.M. P.P.N.
SMMXX-MMS134
300
A
C DET.28 14
49 DET.28 DEVELOPMENT
A
Contractor Logo and Business Name: Drawing N°:
SMMXX-MMM114 SMMXX-MMS238
10 42 SMMXX-MMS235 14 AMBRIZ
41 40 10 500-SMMXX-SMS-005
DET.28 14 DET.28 L - L SECTION FABRICATION YARD
SMMXX-MMS188 Scale 1:20 Facility And Sub Facility Name: Revision: Scale:
K - K SECTION C AGOGO - INTEGRATED WEST HUB RFTI C 1:50
Scale 1:20
15/04/2023 Document Title: Sheet of Sheets:
SEPARATED MUDMAT 4-4
SUBASSEMBLY Format : Unit:
SMMXX-SMS500 A3 mm
4 3 2 1