You are on page 1of 1

Silvestre Dignos dignossilvestre@gmail.

com

Jr. 09557752545

Tacloban City
Mechanical Engineer

EDUCATION SKILLS
Mechanical Engineering AUTOMOTIVE WELDING
Eastern Visayas State University
06/2014 - 06/2021, MICROSOFT OFFICE

COMPUTER LITERATE AutoCad

WORK EXPERIENCE Supervisory

Automotive Technician
EMG Machine Shop
03/2021 - 09/2021, Pawing , Palo Leyte ACHIEVEMENTS
Tasks Mechanical Engineer Licensure
Welding Works Examination
Machine Shop Works August 2022
PRC License No. 0112942
Motorpool Engineer
RAS EASTERN BUILDERS DEVELOPMENT
CORPORATION ORGANIZATIONS
12/2022 - 04/2023, Catbalogan City Knights of Columbus
Achievements/Tasks
Perform routine maintenance activities of the units, in charge in
scheduling PMS and corrective repairs if any TRAININGS AND SEMINARS
Perform lubrication and equipment fluid changes. Practicing COVID-19 Preventive
Monitors the daily trip of the units, records the gas consumption of each Measures in the Workplace-TESDA
unit. (12/2021 - 12/2021)
Creates report on the gas consumption, repair tracker and trip
MANDATORY 8-HOUR SAFETY AND
monitoring of units.
HEALTH ORIENTATION (Pursuant to
Assist on mechanics on ongoing repairs of defective units. Section 16 (b) of RA 11058 and Section 3
Oversees repair requests and work performed on units and process the of DO 198-18 held at AMICI/BOS Site
purchase of replacement materials.
Creative Web Design - TESDA Training
Process job orders for the use of heavy equipment and machinery (11/2021 - 12/2021)
Supervise on cement pouring on site to monitor the standard of work and
safety, and always on standby in case of unit malfunctions.
Contact : Engr. Shaquille Humbria LANGUAGES
English
Line and Grade Engineer (Plumbing, Sanitary,Fire Limited Working Proficiency
Pro)
Tagalog
Based on Scientia Full Professional Proficiency
05/2023 - Present, Mandani Bay Quay Tower 1,3,4 and Podium
Mandaue City , Cebu Waray-Waray
Achievements/Tasks Native or Bilingual Proficiency
Submitting daily Target Activities and Accomplishment Report
Submitting daily Quality Assurance Checklist Forms
Conducts Fire Pro Cross Main Branchline Sprinkler Heads Markings And
INTERESTS
Lay-out based on Approved plan
Fishing Basketball Automotive
Conducts Plumbing Waterline Looping and Sanitary Stub-outs Markings
And Lay-out based on Approved plan
Monitoring of Workers Activity
Conducts Internal Inspection preparation for Gen Con Inspection
Conducts Schedule for Inspection with the General Contractor
Handover QAC forms to Operations signed by Gen Con After Inspection
Contact : Engr. Richard Radaza

You might also like