UNIVERSITY OF OTTAWA DEP. OF CIVIL ENG.

WINTER 2012

CVG 4145 Reinforced Concrete Design II


Solution For Assignment # 3

Question (Total Marks 20)


f c′ = 30 MPa f y = 400 MPa

9.0 m

7.0
m

1. Estimate Slab Thickness CL 13.2.3 (2Marks)

ln [0.6 + f y / 1000]
hs ≥
30
(Note: Slab thickness, hs, should be multiplied by 1.1 because of discontinuity).
9000[0.6 + 400 / 1000]
hs ≥ = 300mm , Use hs = 300mm as a slab thickness.
30

2. Compute Slab Loading (1Mark)

SW = 0.3 x 24 = 7.2 KPa SDL = 2KPa. L = 4.8 KPa


W f = 1.25D + 1.5L = 1.25 x (7.2 + 2) + 1.5 x 4.8 = 18.7 KPa

3. Yield Lines Pattern (2Marks)


9.0 m
A B

E
7.0
m
7-X

C F D

Haisam Yakoub CVG 4145 REINFORCED CONCRETE DESIGN II PAGE 1


UNIVERSITY OF OTTAWA DEP. OF CIVIL ENG. WINTER 2012

First point of each two the slopped yield lines passes through and intersection point of
two rotation axes (A and B) while the other point of the two sloped lines (E) is the
intersection with a third yield line situated at the common line between the 2 rotating East
and West plates (ACFE and EFDB). Intersection point location on the third yield line is
calculated by virtual work.

4. External Work (2Marks)


9.0 m
ABE A B
Wf X
EW = W∆ = 9 = 4.5W f X ;

X/3
2
δ max
∆= ⇒ EW = 1.5W f Xδ max E
3

ACFE 4.5 m
dmax/3
EW = W∆,
A
W1 = 4.5W f (7 − X );
δ max
X
∆1 = ⇒ W1∆1 = (15.75 − 2.25 X )W f δ max
2 2 E
W2 = 2.25W f X ;
δ max
∆2 = ⇒ W2 ∆ 2 = 0.75 XW f δ max
7-X

3
ΣEW = W f δ max [1.5 X + 2( ∆1 + ∆ 2 )]
= W f δ max [1.5 X + 2(15.75 − 1.5 X )] 1
= W f δ max (31.5 − 1.5 X )
dmax/2 F
C

5. Internal Work (2Marks)

ABE ,
IW = mb lθ X
δ max δ max δ max
l = 9m, θ = ⇒ IW = 9 M SN
+ +
− 9 M SN
X X X Q
+ − δ max
= 9( M SN − M SN )
X
dmax
ACFE ,
IW = mb lθ
δ max δ max E
l = 7m, θ = ⇒ IW = 7( M EW
+ −
− M EW )
4 .5 4 .5
+ −
= 1.56( M EW − M EW )δ max Section Perpendicular to Edge AB

Haisam Yakoub CVG 4145 REINFORCED CONCRETE DESIGN II PAGE 2


UNIVERSITY OF OTTAWA DEP. OF CIVIL ENG. WINTER 2012

δ max
+
ΣIW = 9( M SN −
− M SN )
X
[ +
+ 2 1.56( M EW −
− M EW )δ max ] 4.5

Substitute : M = −1.5M + , M SN
− + +
= M EW = M+ ⇒ Q

δ max
ΣIW = 9(2.5M + )
X
[
+ 2 1.56(2.5M + )δ max ] dmax
+ δ max
ΣIW = 22.5M + 7.78 M +δ max
X E
Section Perpendicular to Edge AC
6. Solve Virtual Work Equation (2Marks)

ΣEW = ΣIW
δ max
W f δ max (31.5 − 1.5 X ) = 22.5M + + 7.78M +δ max
X
+
22.5M
W f (31.5 − 1.5 X ) = + 7.78 M + ⇒
X
+ 18.7(31.5 − 1.5 X ) − 28.05 X 2 + 589.05 X
M = =
22.5 7.78 X + 22.5
+ 7.78
X

7. Design Moments (2Marks)

The maximum moments that cause yield lines to happen coincide with an X value that
makes first derivative of M+ equal to zero,
'

(M ) = 0 ⇒  − 28.705.78XX ++ 589 


2
+ ' .05 X − 218 X 2 − 1262.25 X + 13253.63
 = 0 ⇒ =0
 22.5  (7 . 78 X + 22 . 5 )2

X = −11.2, not applicable


X = 5.42 ⇒ M + = 36.63KN , m ⇒ M − = 54.94 KN ,
54.94

54.94 36.63 54.94


36.63

Design Moments (KN.m)

Haisam Yakoub CVG 4145 REINFORCED CONCRETE DESIGN II PAGE 3


UNIVERSITY OF OTTAWA DEP. OF CIVIL ENG. WINTER 2012

7. Calculate Reinforcement (3Marks)

Minimum requirements As = 0.002 x 350 x1000 = 600mm 2 / m


(
M r = Ts d − a )2
Bottom d = 300 − 20 − 11.3 − 11.3 / 2 = 263mm # 10, Use smaller “d” for both directions
Top d = 350 − 20 − 16 / 2 = 272mm # 15, Top principal steel is assumed to be
at the top of the top distribution steel layer.
Space between rebar
A 100
s = sb × 1000 for # 10 s = x1000 = 166.7mm, use : s = 150mm
As 600
A 100
As = sb × 1000 = x1000 = 666.7mm 2
s 150
A 200
s = sb × 1000 for # 15 s = x1000 = 333.3mm ⇒ s = 300mm
As 600
A 200
As = sb × 1000 = x1000 = 666.7mm 2
s 300
For three reinforcement layers:
s ≤ min(3hs ,500mm) = min(900,500) = 500mm Use s=150mm for bottom rebar and use
300mm for top rebar
( ) (
M r = Ts d − a = Asφ s f y d − a
2
)
2
Aφ f 666.7 x 0.85 x 400
a Bot = s s ' y = = 14.44mm
α1φc f c b 0.805 x 0.65x 30 x1000
For #10 M rBot = 666.7 x 0.85 x 400 x( 263 − 14.44 / 2) = 58.0 KN .m > 36.63KN .m, OK
For #15 M rTop = 666.7 x 0.85 x 400 x (272 − 14.44 / 2) = 60.02 KN .m > 54.94 KN .m, OK

8. Check Yielding of Reinforcement CL 10.5.2 (1Mark)


a 14.44 c 16.13 700
• Top. c = = = 16.13 = = 0.059 ⇒ c ≤ = 0.636
β 0.895 d 272 d 700 + f
y

OK
a 14.44 c 16.13 700
Bot. c = = = 16.13 = = 0.061 ⇒ c ≤ = 0.636 OK
β 0.895 d 263 d 700 + f
y

9. Shear Design (1 Mrak)

Short direction V f max = 18.7 x 4.5 = 84.15KN / m


Long Direction V f max = 18.7 x5.42 = 101.35KN / m
Simplified Method β = 0.18 θ = 35 o
Shear Requirements

Haisam Yakoub CVG 4145 REINFORCED CONCRETE DESIGN II PAGE 4


UNIVERSITY OF OTTAWA DEP. OF CIVIL ENG. WINTER 2012

0.9d 
dv ≥  
0.72h 
d = 300 − 20 − 11.3 / 2 = 274mm

0.9d = 0.9 x 274 = 246.6mm 


dv ≥  
0.72h = 0.72 x 300 = 216mm 

Vc = φc λβ f c' bw d v = 0.65 x 0.18 x 30 x1000 x 246.6 = 158KN / m


Vc = 158KN / m ≥ 101.35KN / m OK
No shear reinforcement is required

10. Reinforcement Layout (2Marks)

#15M@300mm T

#15M@ 300mm
#10M@150mm B

T #15M@300mm T

#10M@150mm B

Haisam Yakoub CVG 4145 REINFORCED CONCRETE DESIGN II PAGE 5