Client: Consultants: MOHMAND DAM HYDROPOWER Contractor:
WAPDA MDCG PROJECT CGGC-DESCON JV
Brazing Procedure
Qualification Record
(BPQR)
AWS B2.2/B2.2M
Brazing Equipment
__________________WS250S_______________________________________________________
BRAZING CONDITIONS
BASE METAL:
Identification
___________DHP C12200_______________________________________BM No. ______300______________
Thickness
_________1.5 mm________________________Preperation _____Mechanical Cleaning___________
Other ___________________________________________________________________________________
FILLER MATERIAL:
TEMPERATURE:
______722 ~ 853 °C___________________POSITION: _________Horizontal__________________
POSTBRAZE CLEANING:
_________________________Steel Brush______________________________________________
OTHER: ___________No_______________________
JOINT:
Clearance
_______0.02 ~ 0.13 mm______________________