Technical Visit to Cameron
Highlands Sultan Idris (II) Woh
Power Station
SI
reported by
|| A!
lorganked a technica wit f» Corneron Highline Suton
lois () Won Power Statonon 13 February 2017, Th wen the
fit erty for EEID in 2017.
A total of 22 porisiponts registred for the event ond
3 seitctove from Kedah and Petak The other participants
deparied torn IEM early in the romning ane machedtthe
power stction at about 10. am where they were werrniy
wekomedby Mr TonBeng Wee the Cccupatond Safety
Heath & Environment Manager. Enel Ni Fors tre Senior
Engineer Production) anciseverd other INBpesonre!
Mi Ton gave a safety briefing and asered the
importance of scfety dung the site sit lator He
highghted emergency and safety precoutons such os
safety eit point /routes, procedure for evasuatng the
buliing cnd designated creas for gathering, He scid we
should not panic should on emergency arose. The teking
of photograpts was sticty prohibited curing the vito the
powerpient
Then Enck Nik Fors made o presentation on the
overview of the Comeran Highland hyskoelectric scheme
‘which spanned Kelantan, Pahang anc Perak
[: Hectical Engineering Technical Diision (EETD)
Grow prot ore pomeants
THE INSTIUTON OF ENINEERE, MALAYSIA_—$ Fill
Thee Ge a lolalof 7 power stations, Includng 2 undergiound stations at
bi and Weh, Robinon Falls was com missoned in 198®, folowed by Woh in
1907 and the totel cost of the profect af that time wes RM267 millon. The entire
Comemn Hghland hycioelectic scheme her a total generation capacity of
OSS, with C22MW being expottedio the ard andl the rem cinder for local
consumption.
The Wah Pawer Station ues the vericd Francis turbine. Al the stetione ere
connected by 4lkm of water tunrels. The tot catchment aea is spread over
$PA.4sq, km. and there ate 1S water intakes. The power plants cre ectuclly
“peaking” sawer plants in the conse tht they operate bared! an mene
fiom the Notiond Load Dispatch Cente in Bangsar Kuda Lumpur On ct dei
cverage, the power plants operate 8 houts cuiing the day ce power demands
peakin the moning noon andl evening,
At the end of the presentation, there wos a bief Q8A session where
questions included one an the selection af turbine. According to Encik Nik
the Pelion turbine wer generly prefenedin high head application while the
Froncisturbine wes prefenedin igh volume application,
The delegation then vistec the generaiion areas of the font. The
ortcinants were tronsen ted in vans to the turkine and power generation
reas. The Woh Power Station hes ci head of 40m andthe turkines mtate at
co0rpm with the generoro® having 1 poles. Eochor the 8 generators has c
capenity of aenerafna SOM runring at 0.9 power factor
The partciponts were able to observe and osk queston about the working
plnciples oF tulkines. genewton, transtomes andl the contol systems in
Have for regulcting and keeping the entire 0 pe atfon running smoothly.
The visit enced with Mr. Alex Looi presenting c token of appreciation to
Encik Nik
acs a
tle: 1-Day Short Course on Design of Pumping Droinage System for
Urban Stormwater Runoff. Rescheduled tom 18 May 2017
16 June 2017
Organised by: Woter Resoures Fechrical Division
me goo am.-S25p.m
cPDyPOP 6
title: Talkon ‘Solving Engineering Problems by Systematic Innovative
Appioach: Acquiing TRE as yourskill”
8 July 2017
Oigensed by Urban Enginceing Development Speci interes! Group
Time SD pm.-7D pn
CRO/ROP 2
‘tle: Talkon Global Landbridge (OBOR) and Ocean Thermal Energy
(OTEC)" Using the Engineering Finance Methodology in Designing
'Cost Efficient” Projects to Enhance the Refurn on Invesim ent
8 July 2017
Orgenised by Oi Gos ene! Mining Engineering Technica Divsion
Time 9.00 a.m.- 1100 am.
CPDPOP 2
inaly note thet the scheduled events below ore wubject fo change, Please
hi Me EDI website of www. nyiem.ora.my for mote tformation onthe
opoaming events