K7 CONSTRUCTION OFFICE:
ENGINEER-UDHAYAKUMAR.K SELVI COMPLEX
: 82200-04903, AYYANAR NAGAR
99431-34819 ANDARKOTTARAM POST
Gmail : k7constructionmdu@gmail.com MADURAI-625-020
WORK DETAILS
GROUND FLOOR
I. Basement:
5. Ground Floor Roof Height 10’> First & Second Roof Height 10’
6. Roof Slab fk;gp fl;b Nkhy;L milj;J fhd;fphPl; Nghlg;gLk;.
(Including Roof Beam - As per plan)
7. Roof Slab-w;F Nky; ifg;gpb Rth;( and column concrete ) 3 mb
cauk; fl;b jug;gLk;.
(Roof Thickness = 5” - Loft & sun Shade -2” Thick)
8. nkhl;il khbapy; fg;gp mbj;J jsk; /jl;NlhL Nghl;Lj;jug;gLk;.
III. PLASTERING:
1. Rthpy; XL itj;J khh;f; nra;ag;gLk; rPypq; > cs;G+r;R>
ntspg;G+r;R G+rpj; jug;gLk;.
2. Room xd;wpw;F 1 fg;Nghh;L fl;b G+rpj; jug;gLk;
3. Kitchen - Nkil- fhd;fphPl; Nghl;L G+rpj; jug;gLk;.
4. xt;nthU Floor-w;Fk; xU stair case milj;J fhd;fphPl; Nghl;L
gbfl;b G+rpj; jug;gLk;.
5. cs;Rthpy; vyf;l;hpfy; igg; ,uz;bw;F Nky; ,Ue;jhy; mjpy;
tis itj;J G+rpj; jug;gLk;.
CEMENT RATIO:
10. If there is any alteration & addition to the existing plan,that will be billed suitably.
11. For any additional works other than specified above rates will be given at the time of
execution
12. Site-y; Ntiy elf;Fk;NghJ VjhtJ khw;wk; ,Ue;jhy; ,e;j Nul;by;
NruhJ. jdp Nul; MFk;. (Fwpg;G Basement cauk;)
Mazdoor Rates :
Mason - Rs. 1200/day
Male Coolie - Rs. 900/day
Female Coolie - Rs. 700/day
13.
(ENGINEER)
5
PAYMENT DETAILS
Ground floor
2 Foundation 10%
10 Finishing work 5%
(ENGINEER)