Costing Mechanism
Note: The Area is calculated based on the actual floor area and not based on the municipal area calculation.
Responsibility of Client
1. Handover the site during the period of construction
2. Make the payment on time as per construction schedule
3. Provide Electricity of NEA line.
4. Manage water for the construction work and curing works
Note: Additional labor work apart from work scope the charge for Skilled Labor is 1500 and Unskilled Labor is
1000 per day ( working time 7am to 5:30pm).
Responsibility of Contractor:
1. Carryout all assigned work as mention in Scope of work in timely manner
2. Ensure the work is properly supervised by company supervisor
3. Ensure the technical manpower is available in all major work such layouts, leveling, plumbing and RCC
casting work.
4. Ensure the work is carried out as per drawing provided and quality of work is maintained.
Payment Schedule
S.No Project Milestone Amount Percentage Time Schedule
1 Advance on Mobilization 1,000,000 10.53% Work Mobilization
2 After Foundation Complete 1,000,000 10.53% 1 months
3 After DPC Tie Beam Complete 1,000,000 10.53% 1.5 months
4 Ground Floor RCC 1,000,000 10.53% 2.5 months
5 First Floor RCC 1,000,000 10.53% 3.5 months
6 Top Floor RCC 1,000,000 10.53% 4.5 months
7 Wall Finish 500,000 5.26% 5.5 months
8 Plaster Finish 500,000 5.26% 6.5 months
9 Kora Masino Complete 500,000 5.26% 7 months
10 Marble work and tile work complete 500,000 5.26% 8.5 months
11 Putting Work Complete 400,000 4.21% 9 months
Door Shutter and Window
12 400,000 4.21% 10 months
Complete
13 Sanitary and Electrical workFinish 400,000 4.21% 11 months
14 Color Finishing and all finish 300,000 3.16% 12 months
Total 9,500,000 100%
Material Selection
OPC Cement Shivam/Maruti/United
PPC Cement Locally Available Cement of NS Standard
Rebar Panchakanya/Hama/Ambe
Tile Cost 85 Rs/Sqft
Marble Cost 175 rs/sqft
Door Lock 1200 rs/sqft
Duration of Project
The contractor shall ensure to complete the project within 12 months after the construction starts and shall
handover the project. The project may get prolonged if there are uncertain conditions (Strikes, Bandha,
lockdown, pandemic, Materials shortages etc) which are beyond the contractor control. In such condition
owner shall provide the extension of the project as per understanding. Also Payment as per schedule is also
key factor for timely execution of the project. Contractor shall not be liable for the delay in work if the amount
is not received on time.
___________________ _____________________
___________________ _____________________
Witness Name: Witness Name