You are on page 1of 2

TCPL - Green Energy Solution Private Limited

Minutes of Meeting No: 06 Date : 19 February 2024


Agenda: Weekly Contractors Safety Meeting
Venue: TGESPL Project Office 04.30 PM to 05.30 PM
Time :
TGESPL
Mr. Kunal
JLL
Mr. Balu Nagendra
LLYOD
Mr. Sandeep Singh
Attendees
Mr. Khondekar
ACPL
Mr. Raju Biswas
Grant Enterprises
Mr. Chandan Kumar
EVIO
Mr. Shahid Raza
Distribution: All invited participants
Sr. No. Points discussed Action By Status Target Date Remark

ACPL, Llyod & Grant


TGESPL & JLL instructed, to submit the National Safety Council 2024
1 Enterprises,EVIO, Open 24-02-2024
celebratation plan.
Thirumalai

ACPL, Llyod & Grant


TGESPL & JLL instructed, to be prepare with all the safety documents in
2 Enterprises,EVIO, Info
this week, will have a surprise visit from TGESPL/JLL team
Thirumalai

ACPL, Llyod & Grant


TGESPL & JLL Instructed, to provide the standard barrication with the
3 Enterprises,EVIO, Open 24-02-2024
signage board (Work at height, excavation, hot works)
Thirumalai
Minutes of Meeting

ACPL, Llyod & Grant


TGESPL & JLL Instructed, to conduct the safety inspection to all the power
4 Enterprises,EVIO, Info
tools, machinery etc. as per the checksheet on weekly once.
Thirumalai

ACPL, Llyod & Grant


TGESPL & JLL Instructed, to display the inspection tag on the power tools,
5 Enterprises,EVIO, Open 24-02-2024
machinery etc for easy understanding.
Thirumalai

ACPL, Llyod & Grant


TGESPL & JLL Instructed, to conduct the expert trainings on weekly
6 Enterprises,EVIO, Info
once/twice.
Thirumalai

ACPL, Llyod & Grant


TGESPL & JLL Instructed, to maintain the footfall (IN/OUT) record on daily
7 Enterprises,EVIO, Info
basis.
Thirumalai

8 JLL Instructed, to close all the pending NCR on time. ACPL & Llyod Open 22-02-2024

ACPL, Llyod & Grant


9 JLL Instructed, to implement the safety park in the site premises. Enterprises,EVIO, Open 27-02-2024
Thirumalai
ACPL, Llyod & Grant
10 TGESPL & JLL Instructed, to maintain the work permit tracker. Enterprises,EVIO, Info
Thirumalai
ACPL, Llyod & Grant
TGESPL & JLL Instructed, if any additional work starts which it is not
11 Enterprises,EVIO, Info
included on the work permit, please intimate us.
Thirumalai
ACPL, Llyod & Grant
TGESPL & JLL Instructed, If any new construction vehicle or equipment
12 Enterprises,EVIO, Info
entered into the TGESPL Site Premises, it should be inform to us.
Thirumalai
ACPL, Llyod & Grant
JLL & TGESPL were instructed to prepare the work permit at the site level,
13 Enterprises,EVIO, Info
ensure that work permit should match with the site condition.
Thirumalai
Sr. No. Points discussed Action By Status Target Date Remark
JLL & TGESPL were instructed, strictly prohibited the usage of ACPL, Llyod & Grant
13 gutka/tambaku, tobacco & alcohol in the TGESPL Site Premises, please Enterprises,EVIO, Info
ensure the same. Thirumalai
Note: The above mentioned points consist of the writer's understanding of the proceedings of the meeting. Any deviations/clarifications required in the same shall be directed to the
writer's attention within 24 hrs. of the circulation of the M.o.M

You might also like