Professional Documents
Culture Documents
OPERATION MANUAL
1
CONTENTS
Preface...............................................................................................................................................3
1. Attentions before operating................................................................................................ 4
2. Applications & features........................................................................................................ 5
1) Specifications and parameters.................................................................................... 5
2) Features...............................................................................................................................6
3. Install & debug........................................................................................................................ 7
1) Install...........................................................................................................................7
2) Test-running.......................................................................................................................8
4. Debug & operation.................................................................................................................... 9
1) Introduction of picture D2.......................................................................................... 9
2) Plastic film cutting knife debug...................................................................... 10
3) Discharge sealing edge debug.................................................................................... 12
4) Side-Sealing part debug.............................................................................................. 13
5) Plastic film cutting knife debug............................................................................ 14
6) Temperature adjustment................................................................................................ 14
7) Function of the touch screen:.................................................................................. 15
5. Different production size transforms............................................................................19
1) The parts need to move:.............................................................................................. 19
2) The parts need to change:.......................................................................................... 20
6. Steps for operation.............................................................................................................. 22
5) Producing normally: after adjust all parts well, it can produce normally.
23
7. Maintenance & checking........................................................................................................ 23
1) Maintenance for each working day:.......................................................................... 23
2).Maintenance for each month........................................................................................ 24
3).Maintenance for half of year.................................................................................... 25
2
Preface
Dear customer,
efficiency.
they will be better and better; you’ll like them more and more.
Our machine will help you to create and enhance the value.
3
1. Attentions before operating
1) While there are several staffs operating, debugging, or
2) Please turn off the power while you are checking the
other staffs.
4) The staffs that check and repair this machine should know
5) Do not refit the machine before get the right from Foshan
4
2. Applications & features
1) Specifications and parameters The revised technical parameters refer to the appendix
Specification TB 380A
Noise ≤78db
260X100X50(standard)
Tissue size
260X72X50(mini)
5
2) Features
packing.
and helps to fine out the bug quickly, save your time
processing.
conversion.
6
3. Install & debug
D 1
1) Install
7
3 Do not put the machine in the blowing environment.
dry position.
tightly.
2) Test-running
The first time put on the power, please check the following:
8
4. Debug & operation
D 2
1) Introduction of picture D2
off.
9
5 The red mushroom button: this is urgent stop
heaters.
size heater.
size heater.
D3
1.moving knife adjustment rod、2.moving cutting knife、3. cutting knife spring、4.cutting knife
arm、5.cutting knife rocker、6.static cutting knife、7.static cutting knife adjustment screw
10
Adopt the way as scissors to cut the plastic film, it will more
neat, more flat, more straight, less noise, less friction and
wasn’t cut off completely. You need to adjust this rod to make
state, There is a certain angle between the blade and the blade.
③ Cutting knife spring: When the plastic film was cut not well,
as can’t cut off completely, move the spring to make the moving
④ Cutting knife arm: It was connect with cutting knife and was
used to adjust the angle between the moving knife and the static
knife.
around.
11
3) Discharge sealing edge debug
D 4
1.Adjustment hand wheel、2.Heating plate bracket、3.Heating plate、4.Heating belt
① Adjustment hand wheel: There are two hand wheels on each side.
They are used to adjust the positions and distant of the heating
belts.
and prevent the plastic film contact with the heating plate
12
4) Side-Sealing part debug
图5
1.Adjustment axis、2. Adjustment screw、3.Heating plate、4.Thermocouple
Stop on the position where the heating plate can seal the
productions.
plates’ temperature.
13
5) Plastic film cutting knife debug
D 6
1.Pull plastic film section、2.Cutting knife section、3.Press feeding section
① Pull plastic film section: prepare the plastic film, cut out
the power, turn around the hand wheel to pull the plastic film.
make the cutting knife section move vertically, stop on the good
position of the plastic film and the cutting knife can cut well.
6) Temperature adjustment
The temperature of each temperature controller
should be set by the environment, it should be sealing
steadily and nicely. Usually, the temperature should
14
be:
1 Side-Temp: 125℃
2 End-Temp-Ⅰ: 195℃
3 End-Temp-Ⅱ: 195℃
D 7
15
D 8
length, you can set the film length by data, or use the
and this just used for debug the machine, while the machine
16
starting packing to the end packing, it helps to count for
for the debug the machine by hand wheel, and help to adjust
D 9
The head line shows as the “Running setting”, date and time.
The date and time are as the same as the picture D8 shows. “Film
17
This data should be the length between two colormarks as usual.
the length for cutting film and the setting data is less than
different kinds of plastic film and get the right length size
more easily.
Click the “System Setting” it will run into the web shows as
the picture D10. You can change the date, time, and the language.
D 10
Click the “Alarms”, it will run into the web shows as the
picture D11
18
D 11
The web will show the alarms of the machine, once the something
wrong with the machine, and it will stop and alarming, this web
shows the reason of alarm, after resolve the problem, and press
D 12
② Feeding part
19
D 13
1.Vertical baffles、2.Product dimensions vertical baffle、3.Main feeding cylinder、4.Guide plate
D 14
D 15
20
③ push feeding plate
D 16
④ Angle_1
D 17
⑤ Angle_2
D 18
D 19
21
⑦ Right front guide edge:
D 20
22
well, the plastic film runs at the right position
or not, check it runs easily or not, press the
black button “JOG” to check the machine runs
well or not, then press the green button “START”,
check the machine runs well or not.
4) Testing running
① Put the paper into the feeding groove for the testing
same as above.
23
1 Please do not spay the water or steam on the machine
maintain at once.
24
② Add grease on the gears and chain wheel.
pump.
time.
25
⑦ Check the wire and keep it connecting tightly.
26