Ongoing Projects Physical Status

Project Project Road Period as per Agreement Contrctors Team leader Structure Span
S.no Client Details Project Cost Chainage Foundation Substructure Superstructure Retaining wall Miscellaneous Remark
Name Length Start Date End Date Details details type Arrangement
MJB 1+024 1x45+1x20
2+556 1x37.5
2+896 1x35
5+011 1x25.7
8+406 2x20
MNB 8+885 1x25.7
10+452 1x50
10+775 1x25.7
14+336 1x25.7
15+479 1x37.5
6+189 1x30 (skew 45)
Flyover 12+546 1x30
19+700 1x30

LHS
5+700 2x37.5+1x110+1x
27.25, RHS
M/s Sadbhav ROB 1x22.5+1x130+1x
Ahemdabad 22km (0.000
2 690.30 Cr Engineering 37.5+1x22.5
-Dolera to 22.000)
Ltd.
1x37.5+1x37.2+1+
20+719 18.5 (skew 35)
2+176 1x12
9+128 1x12.42(skew 15)
VUP
11+772 1x12
15+382 1x12
3+300 1x10.5
4+033 1x10.5
7+050 1x10.5
11+505 1x10.5
12+101 1x12.52 (skew 33)
LVUP 13+831 1x10.5
16+375 1x10.5
17+300 1x10.5
18+717 1x10.5
18+971 1x10.5
21+500 1x10.5