Professional Documents
Culture Documents
Screenshot 2024-02-22 at 7.08.34 AM
Screenshot 2024-02-22 at 7.08.34 AM
LOCATION - SPORTS CITY, • THE NEW STADIUM FOR YOUTH OF MANCHESTER CITY STANDS 300 METERS FROM EITHER
MANCHESTER, ENGLAND. STADIUM AND IS PART OF ONE OF THE WORLD’S BEST TRAINING COMPLEXES.
BUILT - 8th DECEMBER, 2014. • THE ACADEMY STADIUM IS LINKED TO THE MOTHER GROUND VIA 190 METRE BRIDGE ACROSS
THE INTERSECTION OF ASHTON NEW ROAD.
SITE AREA - 80 ACRES
• THE COMPLEX CONSISTS OF 14 FULL SIZED FIELDS ,EDUCATION ROOMS,MEDICAL AND FITNESS
(3,23,840SQ.MTS). CENTER AND OFFICES OF THE CLUB COVERING 32 HECTARES.
CAPACITY - 7,000. • ALL STANDS ARE SEPARATE THOSE BEHIND GOALS ARE TERRACED,THE ONES ALONG BOTH
CLIMATIC ZONE - ARID CLIMATE. SIDES OFFER SEATING OFFERING 7000 CAPACITY.
ARCHITECT - RAFEAL VINOLY • THE EAST STAND COMPRISES CLUB OFFICES ,SKY BOXES AND VAST MEDIA HALL WITH AN
OVERVIEW OF THE FIELD.
• THE WEST SIDE OFFERS SIGNIFICANT COMMERCIAL SPACE ALONG THE ALAN TURING WAY.
• THE NEW ACADEMY STADIUM ALONG WITH THE ACADEMY IS WELL LOCATED AND HAS
GOOD COMMUNICATION FROM THE SURROUNDINGS.
INTRODUCTION :
MANCHESTER CITY ACADEMY STADIUM IS A FOOTBALL STADIUM OPENED IN THE YEAR 2014 IN
MANCHESTER ENGLAND. IT WAS ANNOUNCED ON 19 SEPTEMBER 2011 AS A PART OF AN 80
ACRE TRAINING FACILITY TO CATER FOR AROUND 400 YOUTH PLAYERS AT A TIME. THE
CAMPUS WAS COMPLETED IN 2014 AND WAS UNVEILED ON 8 DECEMBER 2014. THE STADIUM
KNOWN SIMPLY AS ACADEMY STADIUM WAS INAUGURATED BY STUDENTS OF MANCHESTER
METROPOLITAN UNIVERSITY STUDENTS WHO PLAYED THE OFFICIAL FIRST GAME ON THE PITCH
ON DEC 14.
ALTHOUGH NOT THE BIGGEST BUILDING OF THE FACILITY THE STADIUM FEATURES NUMEROUS
FACILITIES MORE COMMON TO LARGE STADIUM INCLUDING PRESS ROOM,BOARD ROOM
,OFFICES AND RETAIL SPACE. THE STADIUM IS THE NEW HOME STADIUM OF THE ELITE
DEVELOPMENT SQUAD AND OTHER SENIOR ACADEMY TEAMS AND ALSO OF MANCHESTER
CITY WOMEN.
TRAINING FACILITIES
COMMUNITY ELEMENTS
SUPPORT AREAS
STADIUM AND GROUP HEAD QUARTERS GROUND FLOOR PLAN ABOUT THE CLUB :
STADIUM
• WAITING LOUNGE
• ADMINISTRATIVE UNIT
• RESTAURANT
• PERFORMANCE CENTRE
• TRAINING PITCHES
• FITNESS TRIAL ZONE
• PARENT ACCOMODATION
• GYMANSIUM
• TEACHING LAB
• PLAYER ACCOMODATION
• INDOOR CENTRE
• MEDICATION FACILITIES
• LAUNDRY UNITS
GYMNASIUM TELECAST UNIT
LOCATION - BORISOV, BELARUS. • THE SKIN OF THE DOME GIVES AN IMPRESSION OF A FRAGILE STRETCHED PERFORATED TEXTILE
BUILT - 2014. PULLED OVER THE STADIUM SKELETON. THE COVERED SPACE BETWEEN THE SKIN AND THE
SITE AREA - 32 ACRES TRIBUNES IS A PUBLIC STREET-A VESTIBULE WITH PUBLIC PROGRAM (SHOPS, BARS, SERVICES,
TOILETS) AND GALLERIES ABOVE (OFFICES, VIP, PRESS).
(1,32,000 SQ.MTS).
• INTERNALLY, THE ROUNDED ARENA PROVIDES GOOD ACOUSTICS AND ENCOURAGES AN
CAPACITY - 13,000. EXTROVERT ATMOSPHERE FROM THE PLAYERS AND THE FANS ALIKE DURING THE GAME, BUT
CLIMATIC ZONE - HUMID CLIMATE. FOCUSES CONCENTRATION DURING TRAINING TIME.
ARCHITECT - OFIS ARCHITECTS
TRIBUNES
INTRODUCTION :
THE STADIUM IS GOING ON SITE AT THE END OF 2010 SINCE OPENING IS PLANNED FOR 2012,
WHEN THE CITY OF BORISOV CELEBRATES A SIGNIFICANT ANNIVERSARY. DISTRIBUTION OF THE
PROGRAM TAKES INTO ACCOUNT THE NATURAL ADVANTAGES OF LOCATION AND EXISTING
INTERVENTIONS IN THE TERRAIN AND THE FACT THAT THE STADIUM HAS 13.000 SEATS, HAS TO
OBTAIN 4STARS ACCORDING TO UEFA CATEGORIZATION AND HAVE ADDITIONAL 3.000M2 OF
PUBLIC PROGRAM. THE STADIUM WITH EXTERNAL ARRANGEMENTS HAS TO PROVIDE QUALITY PUBLIC FOYER/ ENVELOPE
TRAFFIC ORGANIZATION AND CONTROLLED / SEPARATE ACCESS DURING THE MATCH AND IN VISITORS ENTRANCE
EVERYDAY USE. POSITION ALSO MAINTAINS THE MOST OF EXISTING TREES ON THE SITE.
THE FINAL ASPECT OF THE COMPLEX IS A RECOGNIZABLE IMAGE OF THE DOMINANT FACILITY,
PLACED IN SOFT GREENERY. THE STADIUM WILL HAVE ITS OWN, DISTINCTIVE MODERN
CHARACTER AND WILL BE BASED ON ENVIRONMENTAL AND USER FRIENDLY APPROACH. STADIUM
ARENA FORMS UNIFIED ROUNDED DOME IMPRESSION OF A SINGLE ENCLOSED OBJECT. DESPITE
ITS MIDDLE SIZE HAS IMPRESSION OF LARGE, DOMINANT AND POWERFUL LANDMARK.
INTERNALLY, A ROUNDED ARENA PROVIDES GOOD ACOUSTICS AND EXTROVERSIVE ATMOSPHERE
DURING THE GAME FOR BOTH, PLAYERS AND FANS. AND DURING TRAINING TIME ALLOWS
INTROVERTED CONCENTRATION ON THE GAME.
PLAYERS AREA/
PUBLIC PROGRSMME STRUCTURE
DESIGN EVOLUTION
ENTRANCE VIEW INFRONT OF THE STADIUM
• IT MAY TAKE MORE THAN AN HOUR FOR ALL THE SPECTATORS TO ENTER
THE STADIUM BUT EVERYONE WANTS TO LEAVE AT THE SAME TIME SO,
THERE ARE 2 ENTRY AND 2 EXIT ROUTES FOR THE 13,000 SPECTATORS.
PARKING
.
• 1 CAR FOR 17 PERSONS.
• 1 BUS FOR 930 PERSONS.
• 750 CAR PARKING PROVISION.
• 8 BUS PARKING.
• 30 VIP & MEDIA PARKING.
• SPECTATORS PARKING IS WITHIN 500M FROM THE PITCH.
• SEPARATE PARKING FOR HOME TEAM SUPPORTERS AND AWAY TEAM
SUPPORTERS IS PROVIDED.
SITE PLAN
• THE FOYER FOR THE VISITORS IS ON THE FIRST FLOOR LEVEL AND IS ACCESSIBLE IN 4
WAYS THROUGH THE STAIRWELLS.
• THERE IS A PLACE FOR A BREAK DURING THE HALF WITH THE VISITORS, TOILETS, BARS (
DRINKS AND SNACKS ), FIRST-AID ROOM AND DETENTION.
• THE SEATS ARE ARRANGED AROUND THE PLAYGROUND IN 17 ROWS ALONG THE LONG
SIDES AND OF 27-28 ROWS ALONG THE SHORT SIDES. 250 VIP SEATS ARE PROVIDED.
• SEATS FOR VIPS ARE WIDER AND MORE COMFORTABLE AND ARE LOCATED AT THE
CENTER OF THE FIELD AND ARE SEPARATED FROM REST OF THE SEATING AREAS.
• WEST UPPER GALLERY IS RESERVED FOR THE PRESS, EAST ON FOR VIP.
• UNDER THE WEST STAND AREA THERE ARE 4 FLOORS WITH EXTRA PROGRAM AND
SERVICE FACILITIES, UNDER THE EAST SIDE 3 FLOORS AND ON WEST SIDE 2 FLOORS.
• ON ENTRY POINT TO THE FIELD THERE ARE TWO DRESSING ROOMS, MIX ZONE, A PLACE
FOR DOPING AND PHYSIOTHERAPY. 3,000 M2 OF PUBLIC PROGRAMME IS DISTRIBUTED
ON THE LOWER LEVEL OF THE NORTH, SOUTH AND EAST.
LEVEL 00 PLAN
VIP - PRESS -
723 SQM 760 SQM
SECTION 01
SECTION 02
• THE SPORTSHALL WITH IT’S ARTIFICIAL GRASS FLOOR AND BIRCH PLYWOOD-IMPACT PROTECTION
INTRODUCTION : WALLS PROVIDES THE IDEAL ATMOSPHERE AND A PLATFORM FOR CONCENTRATED TRAINING
WITHOUT DISTRACTION.
• THE ACADEMY TRAINING GROUNDS OF THE JUNIOR TEAMS OF AUSTRIA VIENNA - ONE OF THE
MOST TRADITIONAL FOOTBALL CLUBS IN AUSTRIA - LIES CLOSE TO THE ‘FRANZ HORR • LOW-TEMPERATURE WALL HEATING IS UTILISED RATHER THAN CONVENTIONAL AIR HEATING. THE
STADIUM’. ARTIFICIAL TURF IS CARRIED THROUGH TO THE CIRCULATION ZONE WHICH OPERATES AS A PRE-
WARMING BUFFER ZONE. ALL CHANGING AREAS HAVE NATURAL DAYLIGHT AND DIRECT ACCESS TO
• THEY INCLUDE A TRAINING HALL AND THREE GRASS PITCHES. THE CONSTRUCTION BUDGET THE OUTSIDE EVEN THOUGH THEY ARE LOCATED IN THE BASEMENT. THIS IS MADE POSSIBLE
WAS EXTREMELY TIGHT AND THE CONSTRUCTION TIME LIMITED TO SIX MONTHS, AND THE BECAUSE OF THE WIDE RAMP THAT DOUBLES UP AS A MEANS OF DELIVERY AND AN IDEAL SPRINT
HANDOVER DATE AFTER COMPLETION A STRICT REQUIREMENT IN ORDER TO OBTAIN THE TRAINING ZONE.
LICENSE OF THE AUSTRIAN FOOTBALL LEAGUE.
• RAINWATER FROM THE 2.500M2 ROOF SURFACE IS COLLECTED IN LARGE 120,000 LITER TANKS
AND SERVES AS IRRIGATION FOR THE GRASS. THE ENTIRE BUILDING IS SERVED BY DISTRICT
DESIGN AND PLANNING : HEATING.
• VIENNA BUILDING REGULATIONS SET A MAXIMUM BUILDING HEIGHT OF 4.5 M AND SO THE 7,0
M REQUIRED CLEARANCE HEIGHT IN THE TRAINING HALL CREATED AN INEVITABLE
CONSEQUENCE: THE ENTIRE BUILDING HAD TO BE LOWERED HALF BELOW GROUND.
DESIGN EVOLUTION
BRIDGES TO ACCESS SPORTS HALL
SITE PLAN
SECTION
ELEVATION
1 SITE PROXIMITY MANCHESTER CITY BORISOW CITY BOTH STADIUMS ARE LOCATED IN MAIN
CITIES WHICH ARE EASILY ACCESSABLE BY
ALL MEANS
2 ARCHITECTURAL STADIUM WITH STADIUM WITH STRUCTURE SHOULD BE FLEXIBLE IN ITS OWN
PLANNING CONCRETE AND ROOF CONCRETE AND STEEL STYLE
STRUCTURE STRUCTURE AND GLASS
FACADE
3 FORM FORM WITH RADIAL FORM WITH ANY FORM WHICH FUNCTIONS IS PREFFERED
PLANNING RECTANGULAR
PLANNING
6 SIGNAGES SIGNAGES WILL PLACED SIGNAGES WILL PLACED SIGNAGES ARE IMPORTANT TO CONVEY THE
NEAR EACH TURNING NEAR EACH TURNING ADDRESS, SO THEY SHOULD LOCATED ALL
POINT. POINT. AROUND THE SITE AND INSIDE THE
BUILDINGS.
7 FUNCTION STADIUM WITH TRAINIG STADIUM WITH TRAINIG IT SHOULD FUNCTION PRIMARILY AS A CLUB
ACADEMY ACADEMY AND SECONDARY FUNCTION AS ACADEMY.
8 MATERIALS USED STEEL AND CONCRETE GLASS, RCC AND STEEL USE OF LOCALLY AVAILABLE MATERIALS
STRUCTURE.
• SUMMER (MARCH TO JUNE): THE SUMMER SEASON IN HYDERABAD IS HOT AND DRY, WITH
TEMPERATURES RANGING
FROM 35 TO 45 DEGREES CELSIUS.
• MAY IS TYPICALLY THE HOTTEST MONTH OF THE YEAR, WITH TEMPERATURES REACHING UP TO 47
DEGREES CELSIUS.
• WINTER (OCTOBER TO FEBRUARY): THE WINTER SEASON IN HYDERABAD IS MILD AND PLEASANT,
WITH TEMPERATURES
RANGING FROM 15 TO 30 DEGREES CELSIUS.
SITE CONTEXT :
VEHICULAR MOVEMENT 5
SITE
4
3
OBH MAIN BLOCK
2
IIIT MESS 1
MLCP TCS
OPEN AREA SANSKAAR SCHOOL SYNERGY SITE 1. PARKING
BAKUL NIVAS PARK
IIITH NILGIRI 2. SWIMMING POOL
3. INDOOR STADIUM
4. FOOTBALL GROUND
SITE AREA – 73.4 ACRES 5. HOCKEY GROUND
HISTORY :
VIP & VVIP STANDS OFFICE CORRIDOR DISCUSSION AREA VIP SEATING INAUGRATION FLAME
THESIS TOPIC : FOOTBALL STADIUM AND TRAINING CENTRE PAGE NO ROLL NO
TITLE : CASE STUDIES 22 18041AA102
CASE STUDIES
• HIGH MAST LIGHTING WITH 4 STAGE OF ADJUSTMENT FOR ILLUMINANCE INTENSITY • THE HIGHLIGHT OF THE STADIUM'S STRUCTURE IS THE CANTILEVERED ROOF COVERING THE
• OLYMPIC FLAME TORCH SPECTATOR STANDS. THE SIMPLE YET INNOVATIVE STRUCTURAL DESIGN ALLOWS A 25 M (82 FT)
• VIDEO DISPLAY SCOREBOARD OF 108 SQM OF DISPLAY SPAN CANTILEVER ALLOWING THE SPECTATORS AN UNOBSTRUCTED VIEW OF THE SPORTING EVENTS.
• PUBLIC ADDRESS SYSTEM DIAGONAL YELLOW STEEL STRUCTURAL MEMBERS ACT AS TENSION MEMBERS TO BALANCE OUT THE
• CCTV FORCES OF THE CANTILEVERED ROOF OF THE SPECTATOR STANDS. THESE MEMBERS NOT ONLY ADD
• SECURITY SYSTEM FOR THE AREAS TO THE EXTERIOR APPEARANCE, BUT ALSO HELP IN CREATION OF A WELL-DEFINED AMBULATORY
• VOICE & DATA NET WORK SYSTEM PATH ALONG THE STADIUM. ORANGE COLOURED CORRUGATED METAL SHEETS WRAP AROUND THE
• POWER POINT IN D AREA FOR REVOLVING SCOREBOARD INNER AND OUTER EDGES OF THE ROOF TRUSSES. THIS INEXPENSIVE CLADDING ENHANCES THE
• FACILITIES FOR TV TRANSMISSION APPEARANCE OF THE STADIUM GREATLY.
• DOPE TEST ROOMS
• MEDICAL ROOMS • IT IS AN ULTRA MODERN STADIUM WITH EIGHT LINE COMPETITION SYNTHETIC ATHLETIC TRACK AND
• PRESS GALLERY 4-LANE SYNTHETIC PRACTICE TRACK. IT USES THE LATEST HIGH-MAST LIGHTING FOR DAY-NIGHT
EVENTS AND PROVIDES OBSTRUCTION-FREE VIEWING FOR ALL SPECTATORS. THE STADIUM WAS
NAMED IN THE MEMORY OF G. M. C. BALAYOGI, AN INCUMBENT SPEAKER OF LOK SABHA WHO DIED
IN AN AIR CRASH.
• THE 2003 AFRO-ASIAN GAMES WERE HELD IN THIS STADIUM. MORE THAN 30,000 PEOPLE CAME TO
OTHER ALLIED FACILITIES WATCH THE OPENING CEREMONY. THE OPENING CEREMONY WAS ABOUT TWO HOURS AND FORTY
MINUTES LONG WITH A LASER SHOW SON-ET-LUMIERE.
• MEDIA CENTRE & PRESS BOX • ABOUT 2,800 KUCHIPUDI ARTISTES PERFORMED A CENTURIES-OLD DANCE ON 26 DECEMBER 2010 TO
• VIP LOUNGES EARN A PLACE IN THE GUINNESS WORLD RECORDS.
• CHANGE ROOMS WITH GYMNASIUM FOR PLAYERS
• 3 SERVICE AND ONE PLAYERS ENTRANCE
• OFFICE ROOM FOR IOA PRESIDENT, TECHNICAL
OFFICIALS AND DIRECTORS OF COMPETITIONS
• SCORE BOARD CONTROL & GAMES MANAGEMENT
ROOM
• COMMENTATORS ENCLOSURES
• RADIO, CABLE AND TV CREW ROOM
• LIGHTING CONTROL ROOMS
• PUBLIC ADDRESS & ANNOUNCEMENT ROOMS
• COMPUTER & RECORDS
• ELEVATOR FOR VIP MOVEMENT
• LOUNGES, PANTRIES & TOILETS
• DORMITORIES, STORES ETC
• OFFICE & CONFERENCE ROOMS
• DINING AREA FOR PLAYERS
• SPILT AIR CONDITIONING FOR SOME IMPORTANT
ROOMS
STRUCTURE DETAILS
BUILT UP AREA 14,850.33 SQM MEDICAL ROOM 6.80 M X 8.0 M (AREA 54.80 SQM)
CAPACITY 30,000 DOPE TEST ROOM 6.90 M X 14.20 M (AREA 98.0 SQM)
SIZE OF THE STADIUM 275M X 194M (APPROX) IN OVAL SHAPE FORM GENTS
SYNTHETIC TRACK 400M (8 LANES) PLAYERS CHANGE ROOM 16.16M X 7.74M (AREA 125.0 SQM)
AREA OF THE PAVILION IN 2 FLOORS 6,500.0 SQM. PLAYERS CHANGE ROOM 12.63 M X 7.74M (AREA 98.0 SQM)
CENTRAL ARENA AREA 6,840.0 SQM TOILETS 9.40 M X 7.74M (AREA 72.80 SQM)
CENTRAL LAWN AREA FOR FOOTBALL 105.0 M X 70.0 M (AREA 7350.0 SQM.)
SPORTS FACILITIES -
TENNIS COURT
BASKET BALL
SITE ACCESS ROADS SITE SURROUNDINGS BADMINTON
• JLN STADIUM IS EASILY ACCESSIBLE THROUGH ROADS AND IS FOOTBALL
AUDITORIUM
IN CLOSE VICINITY OF RING ROAD OF DELHI THAT CIRCLES
AROUND THE KEY DESTINATIONS AND OFFERS
CONNECTIVITY TO MAIN CENTERS OF NCR REGION. MAIN STADIUM
• ELEVATED ROAD OVER BARAPULLAH NALLAH WAS
DEVELOPED AS AN EXCLUSIVE CORRIDOR FOR THE SPORTS
PERSONNEL BETWEEN THE GAMES VILLAGE IN EAST DELHI PARKING
AND JLN STADIUM DURING THE COMMON WEALTH GAMES
2010.
SPORTS FACILITIES -
• THIS ROAD IS OPERATIONAL AND PROVIDES AN EFFICIENT
FOOTBALL
CONNECTIVITY FOR GENERAL PUBLIC TO REACH STADIUM
SAI HOSTEL ATHLETICS WARMUP
FROM FAR OFF AREAS OF EAST DELHI AND NCR REGION.
AREA
• THE NEAREST METRO STATION FOR ACCESSING THE
STADIUM IS JANGPURA AND JLNS METRO STATION LOCATED
ACCESSIBILITY THE STADIUM HAS TOTAL FOURTEEN NO OF ENTRY AND EXIT GATES
AT A DISTANCE OF 300-800 METERS FROM THE STADIUM.
SERVICES :
• THERE ARE 4NO. 11 KV SUB-STATIONS AND 1NO. 33 SUB-STATION.
• FOR ADEQUATE BACKUP DG SETS ARE THERE(19).
• DIGITAL LIGHTING CONTROLS FOR CONCOURSE LIGHTING.
• UNDERGROUND WATER RESERVOIR AND PUMP ROOM CONSISTS OF
- FIRE TANK CAPACITY 1 LAKH LITRE (2 NO).
- FLUSHING WATER TANK CAPACITY 72,000.
- HVAC RAW WATER CAP 2,30,000 LTS.
- HVAC TREATED WATER CAP 2,30,000 LTS.
STADIUM SEATING PLAN
MASTER PLAN
HVAC UNITS
VVIP PARKING WAY TO RAMP FOR ELEVATOR & LIFTS CHANGING ROOMS DISASTER EVACUATION PLAN
UPPER CONCOURSE
THESIS TOPIC : FOOTBALL STADIUM AND TRAINING CENTRE PAGE NO ROLL NO
TITLE : CASE STUDIES 27 18041AA102
CASE STUDIES
GENERAL FEATURES : STRUCTURAL DETAILS
• TWO TIER SEATING ARRANGEMENT
• EARTHQUAKE RESISTANT BUILDING
• RCC STRUCTURE OF OVAL SHAPED BUILDING
• INDEPENDENT STEEL FRAME FOR POLY TERA FLURO ETHYLENE
ROOFING OVER SPECTATOR STAND
• THE ROOF
AREA : 45,000 SQM
ROOF DEPTH : 70 M
• THE ELLIPTICAL STEEL STRUCTURE INSTALLED AROUND THE
STADIUM TO HOLD THE TWO COMPRESSION RINGS FOR THE
MEMBRANE ROOF. THE STEEL COMPRESSION RING SUPPORTS
TOILETS THE TENSILE ROOF 'S CABLE NET SYSTEM.
• THE GAP BETWEEN THE CABLE NET SYSTEM IS FILLED WITH
PTFE SHEAR PANELS.
• THE TWO OUTER SUPPORTING COLONNADE CARRYING BOTH
THE COMPRESSION RINGS AND COMPLETE RAMP SYSTEM FOR
ACCESS AND EVACUATION.
MULTIPURPOSE HALL
MASTER PLAN
GAMES STORAGE
4 STAFF ROOM 2 SQM 10 60 SQM 4 GYM AND MEDICATION 3 SQM 40 150 SQM
5 VIP LOUNGES 2 SQM 100 300 SQM 5 TOILETS AND SHOWER ROOMS 1.5 SQM 60 100 SQM
6 PLAYER DRESSING ROOM 3 SQM 15 150 SQM 6 STORE ROOM 1 SQM 10 20 SQM
02. ARCHITECTURAL STADIUM WITH CONCRETE AND STEEL ROOF STADIUM WITH CONCRETE AND POLY TERA FLURO SPACES SHOULD BE FLEXIBLE AT ITS OWN
PLANNING STRUCTURE. ETHYLENE ROOF TENSILE STRUCTURE. STYLE.
03. FROM • THE FORM GENERATED WITH LINEAR RADIAL • THE FORM GENERATED WITH LINEAR • FORM WITH FUNCTUION SHOULD BE
PLANNING WHICH SURROUNDS THROUGOUT THE RADIAL PLANNING WHICH SURROUNDS PEFERRED
STADIUM AND GETS ACCESS TO SEVERAL ENTRY THROUGOUT THE STADIUM AND GETS ACCESS
AND EXIT. TO SEVERAL ENTRY AND EXIT.
• SEVERAL RAMPS WERE PROVIDED IN
RADIAL FORM.
04. ARCHITECTURAL
PLANNING
05. FUNCTION MULTIPURPOSE STADIUM, HOSTING SEVERAL MULTIPURPOSE STADIUM, HOSTING IT SHOULD FUNCTION PRIMARILY AS
EVENTS, LOCAL LEAGUE MATCHES. SEVERAL EVENTS, NATIONAL & INTERNATIONAL A CLUB AND SECONDARY FUNCTION AS
LEAGUE MATCHES. ACADEMY.
06 . MATERIAL USED • RCC CONCRETE • POLY TERA FLURO ETHYLENE ROOFING USE OF LOCALLY AVAILABLE MATERIALS.
• CORRUGATED ORANGE METAL SHEETS • STEEL COMPRESSION RINGS.
• RCC AND TENSILE CABLES.
08. LANDSCAPE SOME OF THE TREES WERE RETAINED IN THE SITE. MOST OF THE TREES WERE RETAINED IN THE SITE. LANDSCAPE IN THE NORHERN CORNER OF
THE LANDSCAPE AREA IS USED AS A COMMUNITY THE LANDSCAPE AREA IS NOT USED AS THE SITE IS RETAINED TO CREATE A
SPACE A COMMUNITY SPACE. RECRTEATIONAL PARK
09. ADDITIONAL • SKATING RINK • BASKETBALL, VOLLEYBALL AND BADMINTON • ACCOMODATION FOR PLAYERS
FACILITIES • OFFICE SPACES FOR SPORTS AUTHORITIES COURTS. • OFFICE SPACE FOR SPORTS
• TABLE TENNIS HALL. AUTHORITIES.
• OFFICE SPACE FOR SPORTS AUTHORITIES • SPORTS MEDICINE
• CAFES AND LOUNGES • FORMAL EDUCATION BLOCK FOR
• CHLDRENS PLAY AREA PLAYERS
• COMMERCIAL SPACES • RESTAURANTS
10. MASTER PLAN • PROVISION OF A SETBACK FROM THE MAIN • PROVISION OF NON-STREET PARKING INFRONT • PROVISION OF A SETBACK FROM THE
ENTRANCE TO PREVENT TRAFFIC CONGESTION OF THE COMPLEX AND OUTSIDE THE SITE MAIN ENTRANCE TO PREVENT TRAFFIC
ON THE MAIN ROAD. INSTEAD OF A DESIGNATED PARKING AREA. CONGESTION ON HE STATE HIGHWAY
• THE SITE IS TOO LINEAR AND ACCESSIBILITY TO • PROVISION OF GOOD ROAD NETWORK INSIDE • PROVISION OF GOOD ROAD NETWORK
THE SITE IS ONLY FORM ONE MAIN ROAD. THE SITE BY DECENTRALIZING GREEN POCKETS. INSIDE THE SITE.
• PROVISION OF GOOD ROAD NETWORKS INSIDE • ABSENCE OF FOOTPATHS AND CYCLING TRACKS. • THE SPORTS COMPLEX SHOULD
THE SITE BY DECENTRALIZING GREEN POCKETS. • THERE IS NO COMMON SPACE BE PEDESTRAIN FRIENDLY.
• ABSENCE OF FOOTPATHS AND CYCLING TRACKS. FOR INTERACTION BETWEEN THE PUBLIC. • THE SITE SHOULD HAVE ACCESS FROM
• ABSENCE OF SPACES FOR THE CLEANING STAFF • PROVISION OF ACCOMODATION FOR PLAYERS MIN. TWO ROADS.
(DINING AND MEETING AREAS). IN THE COMPLEX. • PROVISION FOR THE DORMITORIES FOR
• ABSENCE OF AN EXCLUSIVE SERVICE ENTRY. THE PALYERS IN THE COMPLEX.
• PROVISION OF AN EXCLUSIVE VIP ENTRY.
11. MODE OF USAGE PAY AND PLAY OPTION PAY AND PLAY OPTION PAY AND PLAY OPTION SHOULD BE
(PUBLIC) PROVIDE TO PUBLIC AT SUBSIDIZED RATES
12. USER GROUP • PLAYER WHO COME FOR TRAINING • PLAYER WHO COME FOR TRAINING • PLAYER WHO COME FOR TRAINING
• DISTRICT, STATE & NATIONAL LEVEL PLAYERS. • DISTRICT, STATE & NATIONAL LEVEL PLAYERS. • DISTRICT, STATE & NATIONAL
• SCHOOL & COLLEGE STUDENTS FOR SPORTS DAY • SCHOOL & COLLEGE STUDENTS FOR LEVEL PLAYERS.
EVENTS SPORTS DAY EVENTS • MANDAL & DISTRICT LEVEL PLAYERS
• FOOD AND CIULTURAL EVENTS • FOOD AND CIULTURAL EVENTS • GENERAL PUBLIC WHO USE
THE COMMERCIAL ESTABLISHMENT.
SITE JUSTIFICATION :
• FIRSTLY TO SET UP A FOOTBALL STADIUM AND ACADEMY THE DISTANCE SHOULD BE
ACCESSIBLE FROM THE MAIN NODES. THIS SITE IS NOT SO FAR FROM THE CITY OF
HYDERABAD.
• THE TRAFFIC IN THIS AREA IS MORE AS COMPARED TO DIFFERENT PARTS OF HYDERABAD
AND CAN BE GET JAMMED EASILY BUT DUE TO WIDER ROADS CAN CLEAR EASILY.
• LINEAR SITE IS SELECTED SO THAT CLUSTERS AND OTHER FORMS ARE NOT DESIGNED
WHERE AS LINEAR GEOMTRY IS DESIGNED SO THAT MAX AMOUNT OF CIRCULATION IS
TAKEN IN .
• GOOD VEGETATION CAN ALSO BE BUILT WITH RESPECT TO THE SURROUNDINGS .
SITE LOCATION :
UPPAL, HYDERABAD, TELANGANA, PIN CODE – 500039.
SITE CONDITIONS :
• TYPE OF SOIL – RED SOIL ( MURRAM ) WITH TINY ROCKS.
• VEGETATION : THE SITE HAS GOOD TYPE OF PLANTATION.
• DIFFERENT TYPES OF TREES EXAMPLE - NEEM , NILGIRIS ETC..
• SURROUNDINGS ARE COVERED WITH DENSE TREES WITH
ANOTHER STADIUM (RAJIV GANDHI INTERNARIONAL
CRICKET STADIUM).
SITE CONNECTIVITY : THE SITE IS CONNECT TO THE UPPAL MAIN ROAD JUNCTION.
NH163 AMBERPET
ROAD
OPPORTUNITIES :
• THE EXTRA SET BACK FOR THE SITE CAN BE USED AS NORMAL
SITE AREA : 60,000 Sqm (14.8 acers) PARKING IN THE SITE WHICH IS LOCATED IN FRONT .
• ROAD SIDE FACING ENTRANCE .
SITE ACCESSIBILITY : • LINEAR SHAPE DESIGN HELPS TO INTAKE MAXIMUM AMOUNT
OF CIRCULATION FLOW .
• GOOD INFRA STRUCTURE CAN BE GIVEN TO THE ROAD FACING .
• SITE IS LOCATED AT THE MAIN UPPAL JUNCTION
ROAD.
• THE SITE HAS 2 METRO STATIONS NEARER WHICH
ARE 2KM AWAY AND EASILY ACCESSIBLE.
• RGIA HYDERABAD IS AT A DISTANCE OF 31KM THREATS :
WHICH CAN EASY ACCESS TO SITE THROUGH MAIN
ROADS. • HEAVY TRAFFIC OR PUBLIC COJUCTION MAY OCCUR .
• THERE ARE SEVERAL BUS STOPS NEARER THE SITE. • BOUNDARY WALLS SHOULD CONSTRUCT AT AN HEIGHT OF
MORE THAN 15' SO THAT NOISE POLLUTION OF DIFFERENT
AREAS AND VISUALS CAN HAVE THEIR PRIVACY.
SITE
• THE SITE HAS PLAIN SURFACE WITH
MINIMAL CONTOURS.
VIP PARKING
SEATING STANDS
VIP STANDS
PLAYERS TUNNEL