Professional Documents
Culture Documents
Material Code
Material Description
Consignments Details :-
Inspection Lot
#FMT
QC Test Results :-
Parameter
Moisture , %
GCV-ADB , cal/gm
Deduction Calculation for less GCV :-
Std. Deductions =
Pass Qty in Ton
Pass Amount
Per GCV
2500000023
Coal
Quantity , Ton
30
Std.
40
3600
0
1
29.16666667
204166.6667
170138.888916667
2500000023
Coal
Quantity , Ton
30
Std.
40
3600
0
1
(((Standard GCV - Actual GCV Reading)*100) / Standard GCV)*(Std. Deductions/100)*Actual Quantity received)
833.33
5833.333333
29.16666667
204166.6667
(((TOLERANZUN-MITTELWERT)*100)/TOLERANZUN)*(1/100)*netweight
if TOLERANZUN-MITTELWERT, this is in postive
bill amt
210000 204166.6667 6805.555556
12