ON ELECTRIC SHOCK

A worker got unconscious due to electrocution at 02:46 PM at steel yard.


Mr. Sahibul C/O M/S MD.Bablu called Mr. Vishnu Kumar (Steel foreman) at
02:47 PM regarding the incident.
Immediately Mr. Vishnu Kumar reached 02:48 PM and he has given services
information to EHS Personnel Mr. Ashutosh Mishra.
Mr. Ashutosh reached at 02:49 PM along with the electrician. Ashutosh called
the emergency vehicle and the electrician shutdown the panel.
Mr. Ashutosh Mishra given CPR to the victim.
Emergency vehicle was arrived the location at 02:51 PM.
Rescue team arrived at 02:51 PM with stretcher.
PSP First-Aider Mr. Pradeep kumar reached with emergency vehicle and he has
given primary first-aid treatment to victim and referred to PSP OHC Centre.
Victim was taken on stretcher at 02:53 PM
For further medical treatment Ambulance departed from site to OHC PSP at
02:54 PM.
Victim was shifted to OHC for treatment at 02:55 PM.
Dr. Kaushal Patel (MBBS) given treatment to the victim.
Mr. Saurabh Pandey (EHS Manager) briefing about the mock drill to the workers
Mock Drill observation Sheet.
Name of the Site Adani Shantigram , Aster & Amogha Project

Location of mock drill Steel Yard


Type of Emergency simulated Medical Case
Observation team Members Mr. Vasant Zala (Adani) , Mr. Harsh Raval, Mr. Nitin Makwana

Sl. No. Parameters Observations / Recommendations

1 On emergency stimulated Medical Case


2 Response of workers Quick response from workers
 Discussed among workmen about Incident.
 Consciousness of Victim was checked by co-workers and PSP First Aider.
 02:57 declare the Emergency Cleared.
3 Head count procedures Site engineer followed the Head counting & cross checked with the daily labour report.

4 Involvement of external agency Nil

5 Others If any Observations & Recommendations:


 Very good and quick response from the staff & workmen.
 Emergency vehicle driver taken few minutes to arrived at OHC
 Communication properly made from incident site to site engineer, safety officer/ supervisor.
 All staffs and workmen were explained about the emergency evacuation procedure.
 Mock Drill the attendance of 90% can be considered good but the awareness among the workers and the staffs