You are on page 1of 3

Project Title: Melrose Park Revision No/Date: 0/24-02-01

Building/Level: Building 6 Prepared by: RS/NV


SafetyLink
Innovative
Fall Protection
Project Ref#: Prepared for: Proactive Safety

Note: Balcony & walkway


connecting to Building 5
(Walkway covered below)

AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP

LT-1 LT-2 3000


LT-3 LT-4 LT-5
BUILDING 6
SSL 60700

SSL 60850 BALLAST FINISH ROOF

SSL 61650

LT-6

5500
MECH CONDENSERS,
Note: Level 8 STACKED UNITS Note: Level 8
Terrace (access via ACCESS Terrace (access via
available entrances) HATCH ACCESS PANEL CLASH WITH
available entrances)
HT
CONDENSER TBC
REF
HM
E REF E REF E
C

SSL 61650 SSL 61650


SSL 62120

SSL 62120 SSL 62120


MECH CONDENSERS, MECH CONDENSERS,
STACKED UNITS STACKED UNITS
GC SSL 59600 GC

SSL 61650
MECH CONDENSERS,
STACKED UNITS

Note: Facade Directly


Below (See Next Page for Note: Coverage till Level 7 Note: Coverage till Level 6
coverage type suggested) Balcony Roof (Purple Balcony Roof (Purple
Highlighted Area) - (Facade Highlighted Area) - (Facade
Below covered in next pg) Below covered in next pg)

Page 1 of 3 This plan/BOQ/quote is a GUIDE ONLY and remains the property of SafetyLink. It is the responsibility of the installer to confirm all products, systems, measurements, 01/02/2024
locations and connective structures prior to submitting to any client, placing any order(s) or commencing any works.
Project Title: Melrose Park Revision No/Date: 0/24-02-01
Building/Level: Building 6 Prepared by: RS/NV
SafetyLink
Innovative
Fall Protection
Project Ref#: Prepared for: Proactive Safety

Purple Highlighted Areas (from Pg 1):


Internal Facade Maintenance from
Balcony Roof using Rope Access
Anchors

3000

BUILDING 6
AP SSL 60700

SSL 60850 BALLAST FINISH ROOF


AP
AP
SSL 61650

5500
AP AP AP AP MECH
APCONDENSERS,
AP AP AP AP AP AP
6.6.3.3
STACKED UNITS 6.6.3.2
ACCESS AP W53.1 W53.1 Detail 3
LT-6 HATCH ACCESS PANEL CLASH WITH
CONDENSER TBC
HT
REF
HM
E REF E REF E
C

Note: Level 7 SSL 61650 Note:


SSL 61650 Level 7
LT-7 SSL 62120 Balcony Roof
SSL 62120

Balcony Roof SSL 62120


MECH CONDENSERS, MECH CONDENSERS,
(Access from
STACKED above -
UNITS STACKED UNITS (Access from above -
GC
via Davit from roof) SSL 59600 via Davit from roof) GC

B B

P DP DP

SSL 61650 AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP AP
AP AP AP AP AP AP AP
AP
6.7.8.3
W53.1
6.7.8.2
W53.1 AP
6.6.3.3
W53.1
6.6.3.2
W53.1
MECH CONDENSERS,
AP
STACKED UNITS

Bridge Roof - Connecting Building 6 to Building 1


(Access from above via Davit Arm from Building 1)

AP AP AP AP AP AP AP AP AP AP AP
AP AP AP AP AP AP AP 6.7.8.3 6.7.8.2
AP AP W53.1 W53.1 Detail 2
AP
Detail 1

AP AP
GC
AP
G

FS

Page 2 of 3 This plan/BOQ/quote is a GUIDE ONLY and remains the property of SafetyLink. It is the responsibility of the installer to confirm all products, systems, measurements, 01/02/2024
locations and connective structures prior to submitting to any client, placing any order(s) or commencing any works.
Project Title: Melrose Park Revision No/Date: 0/24-02-01
Building/Level: Building 6 Prepared by: RS/NV
SafetyLink
Innovative
Fall Protection
Project Ref#: Prepared for: Proactive Safety

Scope of Works: FastFit System BQ

- Full Roof Coverage


Description Quantity Unit
- Rope Access for Facade Maintenance (LT-1) LADERK002.111 (No Base Platform) - 950mm Parapet 1 Count
- Access System (LT-2) LADERK002.111 (No Base Platform) - 950mm Parapet 1 Count

System of preference: (LT-3) LADERK002.111 (No Base Platform) - 950mm Parapet 1 Count
(LT-4) LADERK002.111 (No Base Platform) - 950mm Parapet 1 Count
- Single Anchor Point System (LT-5) LADERK002.111 (No Base Platform) - 950mm Parapet 1 Count
- Existing Parapet (~950mm) for Fall Restraint
(LT-6) LADERK002.111 (No Base Platform) - 950mm Parapet 1 Count
- Davit System for Rope Access
(LT-7) LADERK002.111 (No Base Platform) - 950mm Parapet 1 Count
Roof Details: GUARD001.HATCH_CON 1 Count

- Concrete Roof - Main Roof - Tile Directly Above Davit System BQ


- Concrete Roof - Level 8 Terrace -
~70mm Tile Directly Above Description Quantity Unit
- Concrete Walkway & Balcony Roof Davit Base (For DAVIT_KIT22.22) - CUSTOM: Rod - 300mm 30 Count
- Flat Roof Pitch
DAVIT_KIT22.22 1 Count
Roof Access:
Anchors BQ
- Access via access hatch (main roof)
- Access over walkway roof via Fixed Parapet Ladder
Description Quantity Unit
- Access to Level 8 via available access entrances AP ConcreteLink One Piece Anchor 22 Count
- Access over Parapet via Fixed Parapet Ladders AP Tuff Post 150mm Concrete Anchor Point 32 Count

Page 3 of 3 This plan/BOQ/quote is a GUIDE ONLY and remains the property of SafetyLink. It is the responsibility of the installer to confirm all products, systems, measurements, 01/02/2024