PERFECT FINISH COATINGS LLC

P.O. Box 283246, Dubai, UAE


Ph.: +971 4 3232452
Fax: +971 4 3233019
e-mail:info@pfc-gulf.com
website:www.pfc-gulf.com

QUOTATION
CLIENT: Gulf Contracting & Landscaping QUOTATION REF : QTN-EM-2401231 R0
Al Khayyat Investments DATE : Wednesday, January 24, 2024
T: +971 4 5639171 CURRENCY : AED
P.O. Box 31926 Dubai UAE REFERENCE :
www.akigroup.com
F.A.O : Vijay Sivakumar M: +971 56 5866553

J806 Umm Amara


Epoxy Coatings

We have pleasure in providing the following price for 10 days:


Item Description Unit Quantity Unit Rate Amount Notes
Pump Room Area
Surface preparation including light
grinding and minor touch up repair only.
Supply and apply two coats of
Nitoflor FC 130 (GREY) to be applied on
the surface using a roller, with average
consumption of 0.25 ltr/m2/coat.
A Supply and Application m² 540 88.32 47,692.80

Water Tank Area


Surface preparation including light
grinding and minor touch up repair only. -
Supply and apply three coats of
Nitocote EPSW with an average
consumption of 0.2 lt/m2 each coat.
Supply and fix fiber mesh over the third
coat. Supply and apply two coats of
Nitocote EPSW with an average
consumption of 0.2 lt/m2 each coat.
B Supply and Application m² 757 210.05 159,007.85

Pipe penetration-inside the water tank


(3inch, 4 inch opening) termination
C Item 1 3,780.00 3,780.00
using grout and Sikadur 52LP injection -
**4 pipes only

Pipe penetration on the roof


D Item 10 57.40 574.00
termination using bituminous material

Total Amount 211,054.65

Please Note:
• All access, scaffolding, hoisting, power, etc. to be by others.
• Storage required, protection, and movement of materials/tools to be by the Client
• Nearest available Water source for testing related to be provided by MC/Client.
• Skips to be provided by main contractor.
• Day work rates will be charged if PFC has to clear and tidy work areas from other contractors or trades.
• The Company shall be entitled to an extension of time for the completion of their sub-contract works for any weather
that delays the sub contract works howsoever caused.
• We confirm that we require all relevant permits / notice periods / licenses / permissions to be put in place by others at
no cost to the Company and agreed with all relevant parties prior to commencement of our works.
• If we are required to work around cables or ducts, the exact locations must be marked out for us prior to
commencement of our works. The Company shall have no liability for damage to cables or ducts not so marked.

Payment Terms:
• 30% Advance. • 30% Upon completion of 30% to be paid in 30 days. • 30% Upon completion of 60% to be paid in 30 days. • 10% Upon completion.
• Zero Retention. • Zero performance bond.

Approved By:

Daniel Van Dok


Managing Director