You are on page 1of 3

Sharjah (H.

O): Dubai: Abu Dhabi:


Tel:+971 6 532 2744 P.O.Box : 172797 P.O.Box : 3384l
WA: +971 50 929 8780 Tel: +971 4 223 0572 Tel: +971 2 309 8333
Email: info@modernseal.ae Web:www.modernseal.ae

QUOTATION/AGREEMENT NO. 5583


Client Code : 3205
Client Name : Parsons Overseas Limited - Dubai Branch
Client TRN : MSIC TRN : 100505248300003
Contact Person : Mr. Nuwan Dhananjaya - QS Date : 31/Jan/2024
P.O.Box : 9123 Dubai UAE. Inquiry date : 18/Jan/2024
Telephone : +971-4-4029700 Status : Tender
Fax : +971-4 Validity : 10 days
Mobile # : +971585209948 Warranty :
Email : nuwan.katipearachchi@parsons.com Scope of Work : Waterproofing work
Client :
Consultant :
Project : MH0023 – Umm Amaraa in Dubai.

Sr # Description Quantity Unit Rate Amount VAT Net Amount

Epoxy coating
1 Pump room: supply and apply of 1) miner grinding 2) 541.01 Sqm 65.00 35165.65 1758.28 36923.93
surface preparation with putty and grinding 3) one coat
of epoxy primer 4) two coats of solvent free epoxy
coating (Nitoflor FC 130-Grey-Fosroc)
Epoxy coating
2 Water tank: Surface preparation including light grinding 757.18 Sqm 165.00 124934.70 6246.74 131181.44
and minor touch up repair only. -Supply and apply three
coats of Nitocote EPSW. Supply and fix fiber mesh over
the third coat. Supply and apply two coats of Nitocote
EPSW
Amount In Words: Gross Amount 160,100.35
Dirham One Hundred Sixty Eight Thousand One Hundred Five And Thirty Seven Fils Discount 0.00
Only VAT 8,005.02
Net Amount 168,105.37
Payment Terms:
1. 25% contract/LPO amount as an advance as a CDC cheque.
2. 45% contract/LPO amount upon material delivery same day on site as CDC(cheque copy required before delivery).
3. 30% contract/LPO amount upon progress of works shall be released within 3 days from the date of invoice as 15 days PDC.

Our Bank Details:


Bank name: Ras Al Khaimah (RAK) Account name: Modern Seal Insulation Contracting LLC
Branch name: Oud Mehta, Dubai Account number: 0182531193001
IBAN: AE26 0400 0001 8253 1193 001 Swift code: NRAKAEAK
Many thanks and very best regards,

Modern Seal Group (MSG)

Services: Waterproofing(Membrane), Liquid Waterproofing, Damp Proofing, Combo Roofing, PU Spray, Polyurea Spray, Light-Weight
Foam Concrete, Self-adhesive Membrane, EPDM Membrane, Coating Work (All Kind), GRP Lining, HDPE linning, PU/ Acrylic Crack
Injection, Tile Work, Screed Work, Paint Work, All kinds of waterproofing material supply.
Sharjah (H.O): Dubai: Abu Dhabi:
Tel:+971 6 532 2744 P.O.Box : 172797 P.O.Box : 3384l
WA: +971 50 929 8780 Tel: +971 4 223 0572 Tel: +971 2 309 8333
Email: info@modernseal.ae Web:www.modernseal.ae
First Party Second Party
Parsons Overseas Limited - Dubai Branch Modern Seal Insulation Contracting LLC
Name : Muhammad Mazhar Iqbal
Designation : Manager - Sales & Business Development
Mobile # : +971509298780
Authorised Sign & Stamp Authorised Sign & Stamp

Services: Waterproofing(Membrane), Liquid Waterproofing, Damp Proofing, Combo Roofing, PU Spray, Polyurea Spray, Light-Weight
Foam Concrete, Self-adhesive Membrane, EPDM Membrane, Coating Work (All Kind), GRP Lining, HDPE linning, PU/ Acrylic Crack
Injection, Tile Work, Screed Work, Paint Work, All kinds of waterproofing material supply.
Sharjah (H.O): Dubai: Abu Dhabi:
Tel:+971 6 532 2744 P.O.Box : 172797 P.O.Box : 3384l
WA: +971 50 929 8780 Tel: +971 4 223 0572 Tel: +971 2 309 8333
Email: info@modernseal.ae Web:www.modernseal.ae
General Terms and Conditions:
1. Any escalation to material price more than 5% will be charged at the prevailing rates.
2. VAT to be charged extra as per UAE government.
3. Our scope of work includes the activities specifically stated.
4. Any additional work has to be paid extra as per our consent.
5. In case of any variation between your specifications, terms and conditions and our quotation/correspondence, the letter shall
prevail.
6. Security/gate passes for our team shall be provided by the main contractor.
7. Fee for testing of any material by main contractor.
8. The area shall be handed over completed in all respect by due date for commencing our work without any interruption.
9. The contractor shall indemnify the subcontractor for any damages to the material or subcontract works due to the negligence
of the contractor/ subcontractors through the contract.
10. No retention will be applicable less than Dhs. 250,000.00 work order.
11. If the agreement document made in arabic language, there must be english and duly verified copy attached with.
12. Upon material delivery at site by MSIC, the delivery order must be signed by the concern person from main contractor.
13. Our quotation to form integral part of the contract, even its not mentioned in LPO/Agreement.
14. Deployment of man power if any must be mutually agreed and signed by both parties.
15. MSIC reserves the right to stop work if the client does not honor his payment obligations/measurement sheet on time.
16. Delay in payment will lead to extension of project duration and will be charged 500/day of due payment.
17. All permission for the site access or from the road transport authority must be provided by the client or main contractor.
18. Every precaution has to be taken to protect the waterproofing system.
19. Site program to be mutually agreed upon site.
20. Material should be delivered within seven days after confirmation order and receipt of payment.
21. No performance bond will be given.
22. Cleaning and surface preparation as per our satisfaction.
23. Protection to finished works and proper barricading of our works as per our requirements.
24. Secured, covered storage area for our material and safe access to the work area (Ladders scaffolding etc.)
25. 20mmx20mm groove at parapet, up stand and any other termination level to tuck in membrane.
26. Material/machinery/equipment offloading/loading/shifting by main contractor at working area.
27. Water and execution of water test all times by main contractor.
28. Fire blanket, fire extinguisher, Safety Harness & Fall arrestor by main contractor (if required).
29. Angle fillets at horizontal/vertical junctions including pipes. Cement, sand and water provided by main contractor.
30. Cranage and distribution of material and equipment from storage area to work place.
31. Quantities to be re-measured on completion of work.
32. Electricity, lights facility, air ventilation, water and execution of water test all times by main contractor.
33. Accomodation, transportation and food by Main Contractor.
34. If the actual site quantity is more than LPO main contractor will pay the extra delivery charges whatever will be (including loading &
off-loading).

Services: Waterproofing(Membrane), Liquid Waterproofing, Damp Proofing, Combo Roofing, PU Spray, Polyurea Spray, Light-Weight
Foam Concrete, Self-adhesive Membrane, EPDM Membrane, Coating Work (All Kind), GRP Lining, HDPE linning, PU/ Acrylic Crack
Injection, Tile Work, Screed Work, Paint Work, All kinds of waterproofing material supply.

You might also like