RATE TOTAL
ITEM DESCRIPTION UNIT
(RM) QUANTITY AMOUNT (RM)
3.3.1 Supply material and labour to construct V-shape berm drain Type 'B1' of 800mm top width x 400mm m 7,826
height with side slope of 1:1 comprising of 75mm thick mass concrete G20 reinforced with one layer
of BRC A6 including all necessary formwork, excavation, backfilling, disposal of surplus earth as
directed by Engineer within site and etc. all as per Engineer's drawing.
3.4 SUMP
3.4.1 Construct 100mm thick sump at berm of 950mm(W) x 2000mm(L) x 725mm (H min) concrete No. 223
structure Grade 25 with a layer of BRC A6, 50mm thick lean concrete G15, 300mm (L) x 100mm (W)
x 100mm (H) energy dissipators with 10mm diameter reinforcement located within the catch pit, all
necessary formwork, excavation, backfilling, disposal of surplus earth as directed by Engineer within
Site and etc. all as per Engineer's drawing.
3.5.1 Supply material and labour to construct 100mm thick concrete G20 cascading drain of 750mm (W) x m 1,330
750mm (H) with one layer of BRC A6 comprising of 50mm thick lean concrete G15 and all necessary
formwork, excavation, backfilling, disposal of surplus earth as directed by Engineer within Site and
etc. all as per Engineer's drawing.
Supply material and labour to construct cut-off drain with side slope of 1:1 inclusive of 500mm width
slab comprising of 75mm thick concrete G20 with one layer of BRC A6, 50mm thick lean concrete
G15, all necessary formwork, excavation, backfilling, disposal of surplus earth as directed by
Engineer within Site and etc. all as per Engineer's drawing.
3.6.1 Cut-off Drain Type 'D1" with bottom width of 600mm and depth of 600mm m 675
Laying Precast Reinforced Concrete Pipe Culvert including rubber rings, jointing, temporary shoring
and shuttering when necessary, haunching, backfilling, dewatering, making good of damaged works,
and cart away extra spoil to contractor's own dump site, and all as specified in drawing.
3.13 SUMPS
Construction of cement and sand brick sumps of various size with and including 50mm thick lean
concrete (G15), 150mm thick concrete base (G20) with a layer of BRC A7, formwork, brickwall with
20mm thick cement mortared plastering on exposed surface, cast iron steps, excavation, backfilling,
disposal of surplus suitable soil within site as shown in the Engineer's drawing as directed by S.O for:-
BQ 3 / 1 (Add 1)
SETIA ALAMSARI (SOUTH) – REMAINING SITE CLEARING, EARTHWORKS, RETAINING STRUCTURE, MAIN DRAIN AND ASSOCIATED
INFRASTRUCTURE WORKS
RATE TOTAL
ITEM DESCRIPTION UNIT
(RM) QUANTITY AMOUNT (RM)
6.1.1 Install precast concrete u-drain complete with dry weather flow, cement mortar filling, 75mm thick sand bedding
(Bedding Type 1) or 75mm thick concrete G25 with 1 layer of BRC A6 and 50mm thick lean concrete (Bedding
Type 2) and a layer of 300mm (wide) geotextile polyfelt TS20 or approved equivalent at joint gap between two
precast unit, 100mm (diameter) uPVC weephole complete with 230mm (width) x 230mm (length) x 230mm
(height) filter material (20mm aggregate) wrapped with a layer of geotextile polyfelt TS20 or approved
equivalent, allocation of starter bar for reinforced concrete capping beam (measured separately), and etc as
shown in the Engineer's drawings.
6.1.3 Construct 150mm (W) x height varies from 150mm to 300mm reinforced concrete capping beam at both side m 1,066
including all necessary items as shown in the Engineer's drawings.
6.2.1 Supply and lay Precast Concrete Box Culvert for surcharge to required depth, complete with dry weather flow
laid to fall on well compacted ground with 75mm thick sand bedding (Bedding Type 1) or 75mm thick concrete
G25 with 1 layer of BRC A6 and 50mm thick lean concrete (Bedding Type 2), cement mortar filling and a layer of
300mm (wide) geotextile polyfelt TS 20 or approved equivalent at joint gap between two precast unit, complete
with filter material, 100mm diameter uPVC weephole complete with 230mm (width) x 230mm (length) x 230mm
(height) filter material (20mm aggregate) wrapped with a layer of geotextile polyfelt TS20 or approved
equivalent, and etc as shown in the Engineer's drawings.
a 750mm x 750mm m 27
b 1200mm x 1200mm m 49
c 1500mm x 1500mm m 12
f 2400mm x 2400mm m 30
h 3600mm x 2400mm m 10
i 3600mm x 2700mm m 83
j 2400mm x 2100mm m 46
6.3.1 To construct maintenance sump flush to ground level at 12m c/c including forming opening completed with No. 83
removable precast compress concrete slab with overall size 610mm x 810mm, in two (2) equal panels with size
600mm x 395mm x 50mm, 50mm x 50mm x 5mm thick hot dipped galvanised MS angled bedded in concrete with
fish tail at 300mm c/c and 50mm x 50mm x 5mm thick angled as middle support welded to frame as per
Engineer's drawing.
6.4 SUMPS
(Add 1)
6.4.1 R.C SUMP
(Add 1)
Construction of reinforced concrete (G25) sumps of various size and depth with and including 50mm thick lean
concrete (G15), reinforcement, formwork, cast iron steps, concrete cover slab with opening and PCC slab or Hot-
Dip Galvanised M.S Grating cover and excavation, backfilling, cart away extra spoil to contractor's own dump
site as shown in the Engineer's drawing as directed by Engineer for:-
ii) Exceeding 1.50m depth but not Exceeding 2.00m depth No. 1
ii) Exceeding 6.50m depth but not Exceeding 7.00m depth No. 1
TO COLLECTION -
BQ 6 / 2 (Add 1)
SETIA ALAMSARI (SOUTH) – REMAINING SITE CLEARING, EARTHWORKS, RETAINING STRUCTURE, MAIN DRAIN AND ASSOCIATED
INFRASTRUCTURE WORKS
RATE TOTAL
ITEM DESCRIPTION UNIT
(RM) QUANTITY AMOUNT (RM)
ii) Exceeding 3.00m depth but not Exceeding 3.50m depth No. 1
iii) Exceeding 4.00m depth but not Exceeding 4.50m depth No. 1
iv) Exceeding 5.00m depth but not Exceeding 5.50m depth No. 1
A Construct Reinforced Concrete Outlet structures of various skewness including headwalls, wingwall, base slab, No. 1
(Add 1) cut off wall, 600mm thick rip rap with a layer of non-woven geotextile polyfelt TS20 or approved equivalent,
excavation, granular bedding, blinding, formwork, reinforcement, starter bar to precast pipe, backfilling and
disposal of surplus material, and all as specified in drawings.
Laying Precast Reinforced Concrete Pipe Culvert including rubber rings, jointing, temporary shoring and
shuttering when necessary, haunching, backfilling, dewatering, making good of damaged works, and cart away
extra spoil to contractor's own dump site, and all as specified in drawing.
A 2100mm Diameter pipe culvert Class 1.5Z to required depth and gradient No. 1
TO COLLECTION -
COLLECTION :
Page 1
Page 2
Construct Reinforced Concrete Inlet structures of various skewness including headwalls, wingwall,
base slab, cut off wall, 400mm thick rock & rip rap with a layer of non woven geotextile polyfelt TS80
or equivalent, trash screen, excavation, granular bedding, blinding, formwork, reinforcement,
backfilling and disposal of surplus material, and all as specified in drawings.
A Pond A L.S. 1
B Pond B L.S. 1
C Pond C L.S. 1
Construct Reinforced Concrete Outlet structures of various skewness including headwalls, wingwall,
base slab, cut off wall, 500mm thick rip rap with gabion mattress with a layer of non-woven geotextile
polyfelt TS80 or approved equivalent, excavation, granular bedding, blinding, formwork,
reinforcement, backfilling and disposal of surplus material, and all as specified in drawings.
A Pond A L.S. 1
B Pond B L.S. 1
C Pond C L.S. 0
8.3 FOREBAY
Supply and lay 150mm diameter graded rock in 1000mm length x 1000mm width x 1000mm height
(min) steel cage to form gabion wall with layer of non-woven geotextile KET 13 or equivalent
including all necessary temporary protection works, dewatering, desilting and maintance throughout
construction period etc and as shown in Engineer's drawing or as directed by the Engineer.
A Pond A No 68
B Pond B No 72
C Pond C No 84
Construct 300mm width drain as emergency spillway, completed with 50mm thick Grade 15 lean
concrete, Grade 25 concrete with one layer of BRC A7, 40mm x 40mm x 6mm thick angle iron frame
with fishtail at 300mm c/c, iron steel galvanised grating to detail, including all necessary formworks,
backfilling and cart awat extra spoil within site.
A Pond A m 10
B Pond B m 10
C Pond C m 30
Supply and lay Precast Concrete Box Culvert for surcharge to required depth, complete with dry
weather flow laid to fall on well compacted ground with 75mm thick sand bedding (Bedding Type 1) or
75mm thick concrete G25 with 1 layer of BRC A6 and 50mm thick lean concrete (Bedding Type 2),
cement mortar filling and a layer of 300mm (wide) geotextile polyfelt TS 20 or approved equivalent at
joint gap between two precast unit, complete with filter material, 100mm diameter uPVC weephole
complete with 230mm (width) x 230mm (length) x 230mm (height) filter material (20mm aggregate)
wrapped with a layer of geotextile polyfelt TS20 or approved equivalent, and etc as shown in the
Engineer's drawings.
D i) 1500mm x 1500mm m 38
D 2400mm x 2400mm m 15
D 1800mm x 1800mm m 30
D 2700mm x 2700mm m 58
8.6.1 Supply material and labour to construct maintenance sump flush to ground level at 12m c/c including No. 4
forming opening completed with removable precast compress concrete slab with overall size 610mm
x 810mm, in two (2) equal panels with size 600mm x 395mm x 50mm, 50mm x 50mm x 5mm thick hot
dipped galvanised MS angled bedded in concrete with fish tail at 300mm c/c and 50mm x 50mm x
5mm thick angled as middle support welded to frame as per Engineer's drawing.
TO COLLECTION -
BQ 8 / 4 (Add 1)
SETIA ALAMSARI (SOUTH) – REMAINING SITE CLEARING, EARTHWORKS, RETAINING STRUCTURE, MAIN DRAIN AND
ASSOCIATED INFRASTRUCTURE WORKS
8.7 SUMPS
TO COLLECTION -
COLLECTION :
Page 1
Page 2
BQ 8 / 5 (Add 1)