h(SEE SCHEDULE)

TOP BARS
b

BOTTOM BARS

h A B
SCHEDULE)

RS
b(SEE

LS
1

1
@LS-1 & @LS-2 L/3 L/3
(SUPPORT)
PLAN
TOP BARS
b

M
1
FFL BOTTOM BARS L/5 L/5
h
VARIES

LENGTH

NGL @M-1
600mm (MINIMUM)

(MIDSPAN)
VARIES

RB-1 TYPICAL BEAM DETAILS


SCHEDULE
SEE

BEAMS
100MM THK GRAVEL BEDDING
REINFORCEMENTS
SEE SCHEDULE WIDTH DEPTH
MARK AT SUPPORT AT MIDSPAN
b (b) mm (h) mm STIRRUPS
TOP BARS BOT BARS TOP BARS BOT BARS
SECTION GB-1 200 300 2 -12mmØ 2 -12mmØ 2 -12mmØ 2 - 12mmØ 10mm Ø STIRRUPS SPACED, 1 @ 0.05, 3 @ 0.10, 4 @ 0.15 AND REST @ 0.20 O/C BW
RB-1 200 300 2 -12mmØ 2 -12mmØ 2 -12mmØ 2 - 12mmØ 10mm Ø STIRRUPS SPACED, 1 @ 0.05, 3 @ 0.10, 5 @ 0.15 AND REST @ 0.20 O/C BW
F-1 COLUMN FOOTING DETAILS COLUMNS
h
REINFORCEMENTS
WIDTH DEPTH
10 mm Ø VERT BARS MARK MAIN REINF.
(b) mm (h) mm LATERAL TIES
@ 800 mm O/C
6 - 12mmØ RSB/DEFORMED BARS
# 4'' CHB (INTERIOR WALLS) C-1 200 300 10mm Ø TIES SPACED, 1 @ 0.05, 3 @ 0.10, 6 @ 0.15 AND REST @ 0.20 O/C BW
FOOTINGS
10 mm Ø HOR BARS
@ EVERY THIRD LAYER WIDTH LENGTH THICKNESS
MARK MAIN REINFORCEMENTS
C-1 (b) m (h) m mm
F-1 1.20 1.20 250 6 -16mm Ø HORIZONTAL BARS, 6-16mm Ø VERTICAL BARS O/C BW

10 mm Ø TRANSVERSE F-2 1.20 2.40 250 6 -16mm Ø HORIZONTAL BARS, 12-16mm Ø VERTICAL BARS O/C BW
BARS @ 400 mm 0/C WALL FOOTINGS
b
WIDTH DEPTH
MARK MAIN REINFORCEMENTS
mm mm
FFL
WF-1 320 200 10 mm Ø TRANSVERSE BARS @ 400 mm 0/C, 3 - 10 mm Ø CONTINUOUS LONGITUDINAL BARS
100 MM GRAVEL BED h
200

SLAB ON FILL

THICKNESS
REINFORCEMENTS
3 - 10 mm Ø CONT mm
320 LONGITUDINAL BARS
100 10 mm Ø TEMP BARS@ 500 mm ON CENTER, BOTHWAYS
SECTION
WF-1 WALL FOOTING DETAILS GB-1 SCHEDULE OF REINFORCEMENTS
R.A. 9266, Art 3, Sec 20