3ND FLOOR SLAB SCHEDULE Fc' = 21.00 MPa Fy = 275 MPa
OFFICE OF THE BUILDING OFFICIAL
SHORT SPAN "A" = SA SHORT SPAN "B" = SB
REBAR SPACING ALONG SHORT SPAN (mm) REBAR REBAR REBAR SPACING ALONG LONG SPAN (mm) CITY/MUNICIPALITY
SLAB THICK REBAR REBAR REMARKS
L/4 SPAN "A" * L/4 SPAN "A" * L/4 SPAN "A" RECOMMENDING ISSUANCE
MARK NESS LOC. SIZE DISCONT. END MID SPAN CONT. END LOC. SIZE DISCONT. END MID SPAN CONT. END
OR L/4 SPAN "B" OR L/4 SPAN "B"
TOP BARS DISCONT. (TBD) TOP 200 --- 200 TOP 200 --- 200
TOP BARS CONT. (TBC) S1 125 ∅10 ∅10 TWO WAY HEAD STRUCTURAL DATE
BOT. 400 200 400 BOT. 400 200 400
3-∅10 TIE BARS 3-∅10 TIE BARS SECTION
TOP 180 --- 180 TOP 200 --- 250
S2 125 ∅10 ∅10 TWO WAY
BOT. 360 180 360 BOT. 400 200 400
TOP 200 --- 200 TOP 3-∅10 --- 3-∅10
S3 125 ∅10 ∅10 ONE WAY
BOT. 400 200 400 BOT. 4-∅10
TOP 200 --- 200 TOP 3-∅10 --- 3-∅10
BEAM OR S4 125 ∅10 ∅10 ONE WAY
BOT. 400 200 400 BOT. 4-∅10 ISSUED:
WALL
TOP 200 --- 200 TOP 200 --- 250
BOTTOM BARS ALONG SHORT SPAN BOTTOM BARS (BB) S5 125 ∅10 ∅10 TWO WAY
BOT. 400 200 400 BOT. 400 200 400 BUILDING OFFICIAL DATE
BOTTOM BARS ALONG LONG SPAN
(SEE SCHEDULE)
SHORT CLEAR SPAN "S"
SPAN "A" SPAN "B" NOTES:
IF TOP BARS OF ADJACENT SLABS DIFFER 20 BAR ∅ 20 BAR ∅ BEAM GIRDER
COL MIDDLE COL
AT THEIR COMMON SUPPORT THE SMALLER
SECTION "A" SPACING SHALL GOVERN. STRIP STRIP STRIP
300 300
S/4 S/2 S/4
SHORT SPAN "S"
2∅10 TIE BAR
COL MIDDLE COL (CONTINUOUS) D
STRIP STRIP STRIP 60 deg.
S/4 S/2 S/4

STRIP
COL

L/4
1.5d b 1.5d

LONG CLEAR SPAN "L"


2 - ∅16 SHEAR BAR EACH SIDE CLOSE RING

MIDDLE
STRIP
L/2
BOTTOM BAR SHALL BE
9 BEAM CONNECTION JOINT 10 BEAM TO BEAM CONNECTION
S/5 S/5 SCALE 1:15MTS SCALE 1:15MTS
CUT-OFF W/ RATIO 1 OF 3 S 6 S 6
BOT. BARS @ COLUMN STRIP
@ DISTANCE S/5 FROM THE
FACE SUPPORTING MEMBER
B

STRIP
SHALL BE SPACED 4/3 TIMES BOTTOM BARS @ DEVELOPMENT

COL

L/4
BEAM OR WALL THE MIDDLE STRIP MIDDLE STRIP LENGTH
CRITICAL SECTION CRITICAL SECTION
TYP. FRAMING PLAN OF TWO WAY SLAB
SLAB SECTION "B" SHOWING BOTTOM BAR REINFORCEMENT
REBAR REBAR
SHORT SPAN "SA" SHORT SPAN "SB"
NOTES:
12 x db
NOTE:
TOP BARS DISCONT. TOP BARS CONTINUOUS 1. IF TOP BARS OF ADJACENT SLABS DIFFER
PLAN 12 x db
133°

S ALONG THE LONG SPAN ALONG THE SHORT SPAN AT THEIR COMMON SUPPORT THE SMALLER
< 0.5 (SEE SCHEDULE) (SEE SCHEDULE) SPACING SHALL GOVERN. SHORT CLEAR SPAN "S" db - DIAMETER 90° db - DIAMETER
L OF REBAR OF REBAR
COL MIDDLE COL
* WHICHEVER IS LARGER GOVERN. STRIP STRIP STRIP
DEVELOPMENT
S/4 S/2 S/4 LENGTH
S/4

TOP BARS
LONG SPAN "L"

DISCONTINUOUS (SEE GENERAL NOTE) TABLE FOR CORRECT DIMENSION)


DEVELOPMENT
ALONG THE LENGTH
SHORT SPAN
STRIP
COL

S/4

(SEE SCHEDULE) CRITICAL SECTION CRITICAL SECTION


LONG CLEAR SPAN "L"

REBAR REBAR
MIDDLE

BOTTOM BARS ALONG


STRIP

THE SHORT SPAN


(SEE SCHEDULE)
A 180°
B db - DIAMETER
OF REBAR
db - DIAMETER
OF REBAR
STRIP
COL

S/4

12 x db
TYP. FRAMING PLAN OF TWO WAY SLAB DEVELOPMENT
SHOWING TOP BAR REINFORCEMENT LENGTH
BOTTOM BARS ALONG
THE LONG SPAN
(SEE SCHEDULE)

PLAN PLAN

7 TYPICAL ONE WAY R.C. SLAB DETAIL 8 TYPICAL TWO WAY R.C. SLAB DETAIL 11 TYPICAL DEVELOPMENT LENGTH FOR REINFORCING STEEL
SCALE 1:100MTS SCALE 1:100MTS SCALE 1:15MTS
S 6 S 6 S 6

PREPARED BY: CHECKED BY: PRC NO. SEAL: PROJECT TITLE: CONFORMED : SHEET CONTENTS: SET NO. SHEET NO.

DATE:

PTR: PROPOSED OFFICE BUILDING


TYPICAL DETAIL OF SLAB
BEAM CONN. DETAIL S6 1
TYPICAL DEVELOPMENT
RUFO AGA-ON AYAG DATE: THAHZ BUHISAN DAPOGRACION LENGTH FOR REINFORCING

CIVIL ENGINEER CIVIL ENGINEER TIN: LOCATION: BRGY. TIMOLAN, TIGBAO ZAMBOANGA DEL SUR OWNER
STEEL
6-8 -