REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


SCHEDULE OF FOOTING Fc' = 21 MPa Fy = 414 MPa qa = 150 kPa (ASSUMED) AND HIGHWAYS
A B C OFFICE OF THE BUILDING OFFICIAL
CITY/MUNICIPALITY
DIMENSION (mm) Df BOTT. REINF.
RECOMMENDING ISSUANCE
11.00
MARK REMARKS
H B L (mm) As1 As2
HEAD STRUCTURAL DATE
5.50 SECTION
F1 280 1500 1500 1200 6 - Ø16 6 - Ø16 CONCENTRIC

1.95 1.95 1.60 5.50 F2 280 1200 1200 1200 5 - Ø16 5 - Ø16 CONCENTRIC

F3 280 1700 1700 1200 6 - Ø16 6 - Ø16 CONCENTRIC


SC1 SC2 SC2 SC1 F4 280 1500 1500 1200 5 - Ø16 5 - Ø16 CONCENTRIC ISSUED:
F6 WF2 F6

WF2
WF2 WF2 WF2

WF2

WF2
F5 300 1750 1750 1200 7 - Ø16 7 - Ø16 CONCENTRIC
1.25

BUILDING OFFICIAL DATE


C2F2 C1F1
F6 250 1000 1000 1200 5 - Ø16 5 - Ø16 CONCENTRIC
1 1
WF1 WF1
C2F2
1.35

B
NOTES:
1. ) AT INTERIOR SUPPORT ( CONTINUOUS PROVIDE LARGER SIZE AND 10mm∅ BARS SPACED
NUMBER OF TOP AND BOTTOM BARS ADJACENT SPAN @ 0.40m BOTHWAYS
WF1
2. ) NO SPLICE SHALL BE ALLOWED 2d FROM THE FACE OF THE SUPPORT 0.10m THK CONCRETE

4.50
3 .) ALL CHB PARTITION SHALL BE PROVIDED WITH FLOOR SLAB AS2
WF1
2.25

STIFFENER COLUMN AT NO MORE THAN 3.0 METERS

WF1
SPAN OR FRACTION THEREOF

AS1
100

L
WF1 4" THK CONCRETE
9.25

100 10mm∅ HORIZONTAL HOLLOW BLOCK


4" THK CONCRETE AND VERTICAL

8.00
BARS SPACED
HOLLOW BLOCK @ 0.60m BOTHWAYS
2 2 200
C3F3
2.25

C5F5 C3F3 50 150


WF1

WF1 200 10mm∅ HORIZONTAL


AND VERTICAL
100 150
WF1

BARS SPACED

3.50
50 50 @ 0.60m BOTHWAYS NGL
SF
2.15

0.90
400 AS2 AS1
C4F4 Df
3 3
150 3 - ∅10mm LONGITUDINAL H
BARS, 10mm DIAMETER
C1F1 C1F1 BAR SPACED @ 300MM
400 TRANSVERSE BAR
B
4.00 1.50 5.50
11.00 1a WF1 WALL FOOTING 1b WF2 WALL FOOTING 1c ISOLATED FOOTING
SCALE 1:20MTS SCALE 1:20MTS SCALE 1:50MTS
S 3 S 3 S 3
A B C
SLAB ON GRADE
WEAKEND PLAIN JOINT SPACED
1 FOUNDATION PLAN @4000 ALONG SHORT BUILDING DIMENSION
SCALE 1:65MTS
S 3 AND 12000 ALONG LONG BUILDING DIMENSION
GROUND FLOOR LEVEL
5
0.10
0.38 0.05
0.15
∅12 @250 HORIZONTAL BAR 0.10
0.35
0.20 0.05 0.05
0.95
∅12 @200 VERTICAL BAR 6 - ∅12 LONGI- 1.20
0.20

VARIES
8 - ∅12mm TUDINAL BAR
∅12 @200 TRANS BAR
0.35

VERT. BAR
W∅12 @ 370 O.C. TEMP. B.W
0.20 0.20
0.15

8 - ∅12mm ∅10 @ 150 TIES 3000psi CONCRETE FLOORING


VERT. BAR ∅10 @ 100 CONF. 0.25 0.25 3
4 GRAVEL BEDDING
∅10 @ 100 JOINT NATURAL GRADE LINE
∅10 @ 150 TIES SELECTED FILLING MATERIALS
COMPACTED TO 95% MDD
∅10 @ 100 CONF. 0.35 COMPACTED TO 100% MDD
0.20
∅10 @ 100 JOINT 1.20

1d SC1 DETAIL 1e SC1 DETAIL SC - STIFFENER COLUMN 8f STAIR FOOTING 1g SLAB ON FILL (SOFT) DETAIL
SCALE 1:10MTS SCALE 1:10MTS SCALE 1:20MTS SCALE 1:10MTS
S 3 S 3 S 8 S 3

PREPARED BY: CHECKED BY: PRC NO. SEAL: PROJECT TITLE: CONFORMED : SHEET CONTENTS: SET NO. SHEET NO.

DATE: FOUNDATION PLAN

PTR: PROPOSED OFFICE BUILDING


WALL FOOTING DETAIL
ISO. FOOTING TYP. DET
S3 1
STIFFENER COLUMN DET.
RUFO AGA-ON AYAG DATE: THAHZ BUHISAN DAPOGRACION
CIVIL ENGINEER CIVIL ENGINEER TIN: LOCATION: BRGY. TIMOLAN, TIGBAO ZAMBOANGA DEL SUR OWNER
STAIR FOOTING DETAIL
SLAB ON FILL DETAIL
3-8 -