You are on page 1of 1

L E G E N D: REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


AND HIIGHWAY
OFFICE OF THE BUILDING OFFICIAL
WC WATER CLOSET LAV LAVATORY MUNICIPALITY OF TABUELAN

RECOMMENDING APPROVAL:
LF LAVATORY FAUCET KS KITCHEN SINK
HEAD SANITARY SECTION DATE

KF KITCHEN FAUCET FD FLOOR DRAIN APPROVED:

BUILDING OFFICIAL DATE


SHO SHOWER HEAD CB CATCH BASIN

BT BATHTUB CO CLEAN OUT

HB HOSE BIBB FCO FLOOR CLEAN OUT

WATER LINE VSTR VENT STACK THROUGH ROOF

M WATER METER GATE VALVE

1.00 3.00 2.00 4.00 2.97 1.30


CB CB

SEPTIC TANK
CO

2.34
1.00

CO WC
CO FD
5.00

5.00
TERRACE
LAV CO
1.00

1.00
MUSIC ROOM MAID'S ROOM BEDROOM

SEWER
RISER
SEWER

SEWER
2.00

SEWER

2.00
RISER

RISER
CO RISER
UP DOWN CO
CO CO CO CO
CB DINING ROOM CB MASTER'S BEDROOM
WC WC
KITCHEN

12.61
2.00

2.00
LAV LAV
KS CO
CO FD CO FD
D2
LAV
GT HALLWAY
WC CO
DEN/OFFICE
6.00

6.00
FD
LIVING ROOM
4.00

4.00
CARPORT
GUEST ROOM BEDROOM

BALCONY
FAMILY ROOM
PORCH

CB CB
3.00 3.50 1.50 2.00 3.00
3.00 3.50 3.50 4.27
13.00
TO NEAREST TO NEAREST
DRAINAGE LINE DRAINAGE LINE

GROUND FLOOR PLAN SECOND FLOOR PLAN

FROM THE OFFICE OF : REP. ACT 9266 (Art. IV, Sec.33) REG. NO. SEAL PROJECT NO. PROJECT TITLE: OWNER: REVISIONS: SHEET CONTENTS: SHEET NO.
Drawings and specifications & other contract documents duly DATE DRAWN BY AS SHOWN
signed, stamped or sealed, as an instruments of service are
PROPOSED TWO-STOREY ROWIN A. PUJIDA
REGISTERED MASTER PLUMBER
intellectual property & documents of R.A. PUJIDA , whether
the object for w/c they are made is executed or not it shall be
unlawful for any person to duplicate or make copies of the
said documents for the use in the repetition of & for other
PTR NO. DATE
RESIDENTIAL BUILDING P01
DATE CHECKED BY
projects or buildings, whether executed partly or in a whole
w/o the written consent of architect or author of said docs.
TIN DATE LOCATION: BRGY. POBLACION, TABUELAN, CEBU ADDRESS: BRGY. POBLACION, TABUELAN, CEBU 1 4

You might also like