SCHEDULE OF R.C. BEAMS AND GIRDERS (f'c = 21 MPa ; fy = 414 MPa) SCHEDULE OF R.C.

(f'c = 21 MPa ; fy = 414 MPa) SCHEDULE OF R.C. BEAMS AND GIRDERS (f'c = 21 MPa ; fy = 414 MPa)
SIZE (mm) TOP BARS (mmØ) BOTTOM BARS (mmØ) WEB STIRRUPS SIZE (mm) TOP BARS (mmØ) BOTTOM BARS (mmØ) WEB STIRRUPS
MARK BARS REMARKS MARK BARS REMARKS
b h CONT. EXTRA @ LEFT EXTRA @ RIGHT CONT. EXTRA @ MIDSPAN EXTRA @ LEFT EXTRA @ RIGHT (mmØ) START @ 1-50mm, SPACING (mm O.C) b h CONT. EXTRA @ LEFT EXTRA @ RIGHT CONT. EXTRA @ MIDSPAN EXTRA @ LEFT EXTRA @ RIGHT (mmØ) START @ 1-50mm, SPACING (mm O.C)

(f'c = 21 MPa, fy = 414 MPa)


SCHEDULE OF R.C. FOOTING (f'c = 21 MPa ; fy = 414 MPa) SCHEDULE OF R.C. FOOTING (f'c = 21 MPa ; fy = 414 MPa)

SECOND FLOOR LEVEL

(f'c = 21 MPa, fy = 414 MPa)


SECOND FLOOR LEVEL
TO UNDERSIDE OF
SCHEDULE OF R.C. COLUMNS
DIMENSION REINFORCEMENT

TO UNDERSIDE OF
DIMENSION REINFORCEMENT

SCHEDULE OF R.C. COLUMNS


FOUNDATION
FOOTING ALONG (L) ALONG (W) FOOTING
REMARKS ALONG (L) ALONG (W) REMARKS
MARK THICKNESS LENGTH WIDTH

FOUNDATION
MARK THICKNESS LENGTH WIDTH
(t) mm (L) mm (W) mM (t) mm (L) mm (W) mM
TOP BAR BOTTOM BAR TOP BAR BOTTOM BAR TOP BAR BOTTOM BAR TOP BAR BOTTOM BAR

NOTE : NOTE :

LEVELS
LEVELS
C-1
COLUMN
DESIGNATION COLUMN
C-1
DESIGNATION

MRF POWER HOUSE


1 FOUNDATION PLAN 1 ROOF FRAMING PLAN

1 2 2 1 2 2

A A

B B
GLAMPING TOILET GLAMPING TOILET
1 FOUNDATION PLAN 1 ROOF FRAMING PLAN

POWER HOUSE POWER HOUSE


1 FOUNDATION PLAN 1 ROOF FRAMING PLAN

ENGINEER PROJECT TITLE : OWNER REV NO. REVISIONS DATE SHEET CONTENTS SHEET NO.:
GLAMPING TOILET FOUNDATION & ROOF FRAMING PLAN
POWER HOUSE FOUNDATION & ROOF FRAMING PLAN
MRF FOUNDATION & ROOF FRAMING PLAN
ST-07