Report Verifikasi Cycle Time
Report Verifikasi Cycle Time
APV 1 +
REINF , FRONT DOOR
3 HT + Bending J.3 (Line J) 12.9
RR SASH , R/L
VISUCO
6.7 -20.3
3.1 -6.9
4.3 -8.6
2.9 -13.3
4.4 -3.7
6.5 -15.1
8.6 -13.0
17.3 -9.7
No. Part Name Model Scetch Proses Mesin CT Current
CNC
Bending
1 3RD BACK 4L45W CHIAOSENG 23.1
Pipe
(1)
CNC
Bending
2 3RD CUSH 4L45W CHIAOSENG 21.0
Pipe
(1)
CNC
Bending
3 2NDB LH UN 4L45W CHIAOSENG 31.0
Pipe
(4)
CNC
Bending
4 2NDB RH UN 4L45W CHIAOSENG 31.0
Pipe
(4)
CNC
Bending
5 2ND CUSH RH 4L45W CHIAOSENG 38.0
Pipe
(3)
NC
Bending
6 AR UPR 2ND CUSH 4L45W CHIAOSENG 30.0
Pipe
(1)
CNC
Bending
7 FRAME, MAIN DRIVER CUSH SLD CHIAOSENG 21.6
Pipe
(3)
CNC
Bending
8 FRAME, MAIN ASSIST BACK SLD CHIAOSENG 30.4
Pipe
(3)
CNC
Bending
9 FRAME, MAIN DRIVER BACK TD-7 CHIAOSENG 53.6
Pipe
(3)
CT Verifikasi Dev
19.9 -3.2
19.5 -1.5
28.0 -3.0
26.7 -4.3
27.0 -11.0
19.3 -10.7
14.6 -7.0
18.8 -11.6
25.8 -27.8