KEBUTUHAN BESI BULAN MARET 2024

Diameter
NO URAIAN SAT VOLUME KETERANGAN
Ø10 Ø12 Ø13 Ø16 Ø19 Ø22 Ø25 Ø32

A JEMBATAN STA 1+974 Kg 93.457,42 - - 1.103,69 4.911,52 2.411,34 - 74.567,08 10.463,80

1 Pilecap A2 Kg 14.627,46 551,84 1.976,35 12.099,27

2 Pilecap P1 Kg 15.829,38 958,82 2.411,34 12.459,22

3 Pilecap A1 Kg 14.627,46 551,84 1.976,35 12.099,27

4 Stek Kolom A2 Kg 18.954,66 18.954,66

5 Stek Kolom P1 Kg 10.463,80 10.463,80

6 Stek Kolom A1 Kg 18.954,66 18.954,66

B Box Culvert STA 0+156 Kg 3.772,24 2.488,32 1.283,92 -

C Box Culvert STA 4+015 Kg 5.435,20 - 3.492,37 1.942,83 - - - -

D Box Culvert STA 4+920 Kg 2.633,47 - 1.743,47 889,99 - - - -

E Bore Pile D800 STA 2+175 - 2+300 (35 titik) Kg 24.451,32 5.995,99 18.455,33 - -

F BP D800 Slope Protection 2+340 s.d 2+390 (19 ttk) Kg 13.273,57 3.254,97 - 10.018,61 - -

G Bore Pile D1000 STA 2+450 s.d 2+550 (20 titik) Kg 36.992,12 5.397,52 - 31.594,60 -

TOTAL KEBUTUHAN (Kg) Kg 180.015,33 14.648,48 - 8.827,85 9.028,27 30.885,27 - 106.161,68 10.463,80

TOTAL KEBUTUHAN (Batang) Btg 2.000,00 - 800,00 500,00 1.200,00 - 2.300,00 200,00