Reinforced Concete Box Culvert (mm)
(mm)
* No. of Barrels = 4 BAR 1 20 300
* Thickness = 300 mm BAR 2 16 200
* Span = 3000 mm BAR 3 20 300
* Height = 3500 mm BAR 4 20 300
* Concrete Cover = 40 mm BAR 5 20 300
* Length of RCBC = 12000 mm BAR 6 25 170
BAR 7 16 300
Concrete BAR 8 12 200
Volume = 160.2 cu.m Corners 12
Cement = 1457.82 bags Temp Bars 12 250
Sand = 80.1 cu.m Total
Gravel = 160.2 cu.m *Based on plan
*Spacing
*
Legend
Reinforced Concete Box Culvert (mm)
(mm)
* No. of Barrels = 4 BAR 1 20 300
* Thickness = 300 mm BAR 2 16 200
* Span = 3000 mm BAR 3 20 300
* Height = 3000 mm BAR 4 20 300
* Concrete Cover = 40 mm BAR 5 20 300
* Length of RCBC = 12000 mm BAR 6 25 170
BAR 7 16 300
Concrete BAR 8 12 200
Volume = 151.2 cu.m Corners 12
Cement = 1375.92 bags Temp Bars 12 250
Sand = 75.6 cu.m Total
Gravel = 151.2 cu.m *Based on plan
Double, Triple & Quadruple
RSB
Length per piece Total Length Total Weight Qty
Set kg/m (m)
(mm) (mm) (kg) (pcs)
6040 2 492,058.67 2.47 1,213.42 6 83
4460 2 540,552.00 1.58 854.07 6 91
2145 4 349,492.00 2.47 861.85 6 59
15000 2 1,222,000.00 2.47 3,013.45 7.5 163
1800 8 586,560.00 2.47 1,446.46 6 98
1800 4 512,047.06 3.85 1,973.43 6 86
4460 6 1,090,024.00 1.58 1,722.24 6 182
1800 8 872,640.00 0.89 774.90 6 146
15000 10 600,000.00 0.89 532.80 7.5 80
15000 332 4,980,000.00 0.89 4,422.24 7.5 664
16,814.86