You are on page 1of 20

BERAT BESI

diameter 1 batang (kg) 1 meter (kg)


6 2.66 0.22
8 4.72 0.39
10 7.38 0.62
12 10.63 0.89
13 12.47 1.04
16 18.90 1.57
19 26.65 2.22
22 35.73 2.98
25 46.13 3.84
29 62.08 5.17
32 75.58 6.30

3185.73 2867.15

LUAS PENAMPANG (mm2)

diameter 1x luas (mm2) 2x 3x 4x 5x 6x 7x 8x 9x 10x


6 28.27431 56.54862 84.82293 113.09724 141.37155 169.64586 197.92017 226.19448 254.46879 282.74310
8 50.26544 100.53088 150.79632 201.06176 251.32720 301.59264 351.85808 402.12352 452.38896 502.65440
10 78.53975 157.07950 235.61925 314.15900 392.69875 471.23850 549.77825 628.31800 706.85775 785.39750
12 113.09724 226.19448 339.29172 452.38896 565.48620 678.58344 791.68068 904.77792 1,017.87516 1,130.97240
13 132.73218 265.46436 398.19653 530.92871 663.66089 796.39307 929.12524 1,061.85742 1,194.58960 1,327.32178
16 201.06176 402.12352 603.18528 804.24704 1,005.30880 1,206.37056 1,407.43232 1,608.49408 1,809.55584 2,010.61760
19 283.52850 567.05700 850.58549 1,134.11399 1,417.64249 1,701.17099 1,984.69948 2,268.22798 2,551.75648 2,835.28498
22 380.13239 760.26478 1,140.39717 1,520.52956 1,900.66195 2,280.79434 2,660.92673 3,041.05912 3,421.19151 3,801.32390
25 490.87344 981.74688 1,472.62031 1,963.49375 2,454.36719 2,945.24063 3,436.11406 3,926.98750 4,417.86094 4,908.73438
29 660.51930 1,321.03860 1,981.55789 2,642.07719 3,302.59649 3,963.11579 4,623.63508 5,284.15438 5,944.67368 6,605.19298
32 804.24704 1,608.49408 2,412.74112 3,216.98816 4,021.23520 4,825.48224 5,629.72928 6,433.97632 7,238.22336 8,042.47040
PERHITUNGAN QUANTITY PILECAP FL +6.000 ; as DS-1 DS-2 join DS-A - XY
I INPUT DATA Quantity 1 unit
a Kode PileCap = PC1
b Dimensi PileCap = angka yang wajib diisi sesuai drawing
Panjang (l) = 3000 mm
Lebar (b) = 2000 mm
Tinggi (h) = 800 mm
c L bruto = 6 m2
d Tebal Selimut Samping (TSS) = 75 mm
e Tebal Selimut Atas (TSA) = 75 mm
f Panjang Netto (l') = 2.85 m
g Lebar Netto (b') = 1.85 m
h Tinggi Netto (h') = 0.65 m
.
II PERHITUNGAN TULANGAN
a Ø Tulangan Pokok/utuh (P) = 16 mm d Ø Tulangan Pokok/utuh (Q) = 18 mm
Jarak antar Tulangan = 150 mm Jarak antar Tulangan = 100 mm
Panjang Tulangan = 3.83 m Panjang Tulangan = 3.79 m
Jumlah Tulangan = 14 ea Jumlah Tulangan = 20 ea
Berat = 1.58 kg/m Berat = 2.0 kg/m
b Ø Tulangan Pokok/utuh (R) = 16 mm e Ø Tulangan Pokok/utuh (S) = 18 mm
Jarak antar Tulangan = 150 mm Jarak antar Tulangan = 100 mm
Panjang Tulangan = 2.83 m Panjang Tulangan = 2.79 m
Jumlah Tulangan = 20 ea Jumlah Tulangan = 30 ea
Berat = 1.58 kg/m Berat = 2.00 kg/m
c Ø Tulangan ties (X) = 18 mm
Jumlah Tulangan = 2 ea
Panjang Tulangan = 9.40 m
Berat = 2.00 kg/m

III KESIMPULAN
a Panjang tulangan total
ØP = 53.62 m
ØR = 56.60 m
ØX = 18.80 m
ØQ = 75.80 m
ØS = 83.70 m

b Bekisting = 8 m2
8 m2 1 unit
c Pengecoran Beton = 4.8 m3
4.8 m3 1 unit
d Berat Tulangan Total
ØP = 84.63 kg >>>> D 16
84.63 kg >>>> 1 unit
ØR = 89.33 kg >>>> D 16
89.33 kg >>>> 1 unit
ØX = 37.55 kg >>>> D 18
37.55 kg >>>> 1 unit
ØQ = 151.42 kg >>>> D 18
151.42 kg >>>> 1 unit
ØS = 167.20 kg >>>> D 18
167.20 kg >>>> 1 unit
PERHITUNGAN QUANTITY KOLOM FL +6.000 ; as DS-1 DS-2 join DS-A - XY
I INPUT DATA Quantity 1 unit
a Kode Kolom = K1
b Dimensi Kolom
Tinggi Kolom (L) = 4000 mm = angka yang wajib diisi sesuai drawing
Panjang Kolom (a) = 400 mm
Lebar Kolom (b) = 400 mm
c Tebal Pile Cap (h) = 1000 mm
d Tebal Selimut Atas (LSA) = 75 mm
e Luas Bruto = 0.16 m2
f Tebal Selimut Atas (TSA) = 50 mm
g Tebal Seliut Samping (TSS) = 50 mm
h Panjang netto (a') = 300 mm
i Lebar netto (b') = 300 mm

II PERHITUNGAN TULANGAN
a Tulangan Utama (P)
Ø Tulangan = 16 mm
n Jumlah tulangan = 8 ea
L Panjang tulangan = 4000 mm
Panjang penyaluran = 1.12 m
Berat = 1.58 kg/m
b Tulangan Geser/Sengkang (Q)
Ø Tulangan = 10 mm
Jarak Sengkang = 100 mm
l Panjang tulangan = 1.3 m
Jumlah tulangan = 41 ea
Berat = 0.62 Kg/m

III KESIMPULAN
a Panjang tulangan total
ØP = 40.94 m
ØQ = 53.30 m
b. Bekisting = 6.4 m2
6.4 m2 1 unit
c. Pengecoran Beton = 0.64 m3
0.64 m3 1 unit
d. Berat Tulangan Total
Ø Tulangan Utama = 64.61 kg >>>> D 16
64.61 kg >>>> 1 unit
Ø Tulangan Geser = 32.86 kg >>>> D 10
32.86 kg >>>> 1 unit
PERHITUNGAN QUANTITY BALOK FL +6.000 ; as DS-1 DS-2 join DS-A - XY
I INPUT DATA
a. Kode Balok = B1 QUANTITY = 2.00 UNIT
b. Dimensi Balok
Lebar (b) = 800 mm f. Tebal Selimut Atas (LSA) = 50 mm
Tinggi (h) = 1100 mm g. Tebal Selimut Samping (LSS) = 50 mm
c. L bruto (C-C) = 8.75 m h. L netto = 7.75 m
d. Lebar K1/B1 = 1000 mm i. Tumpuan Kiri (a1) = 1.94 m
e. Lebar K2/B2 = 1000 mm j. Lapangan (a3) = 3.88 m
k. Tumpuan Kanan (a2) = 1.94 m

Tumpuan Kiri Lapangan Tumpuan Kanan

1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm


n. b = 7 ea n. b = 7 ea n. b = 7 ea
berat b = 3.85 kg/m berat b = 3.85 kg/m berat b = 3.85 kg/m
2 Ø c (tul extra) = 25 mm 2 Ø g (tul extra) = 25 mm 2 Ø i (tul extra) = 25 mm
n. c = 8 ea n. g = 5 ea n. i = 8 ea
berat c = 3.85 kg/m berat g = 3.85 kg/m berat i = 3.85 kg/m
3 Ø e (torsi/web) = 22 mm 3 Ø e (torsi/web) = 22 mm 3 Ø e (torsi/web) = 22 mm
n. e = 6 ea n. e = 6 ea n. e = 6 ea
berat e = 2.98 kg/m berat e = 2.98 kg/m berat e = 2.98 kg/m
4 Ø f (sengkang) = 13 mm 4 Ø j (sengkang) = 13 mm 4 Ø k (sengkang) = 13 mm
keliling f = 3.7 m keliling j = 3.7 m kel. k = 3.7 m
berat f = 1.04 kg/m berat j = 1.04 kg/m berat k = 1.04 kg/m
jarak Sengkang = 100 mm jarak Sengkang = 150 mm jarak. seng = 100 mm
jumlah f = 21 ea jumlah j = 27 ea jumlah k = 21 ea
sub total panjang f = 77.7 m sub total panjang j = 99.9 m sub total panjang k = 77.7 m
5 Ø m (cross tie) = 13 mm 5 Ø n (cross tie) = 13 mm 5 Ø o (cross tie) = 13 mm
n. melintang m = 1 ea n. melintang n = 1 ea n. melintang o = 1 ea
n. memanjang m = 2 ea n. memanjang n = 1 ea n. memanjang o = 2 ea
panjang melintang m = 0.8 m panjang melintang n = 0.8 m panjang melintang o = 0.8 m
panjang memanjang m = 1.1 m panjang memanjang n = 1.1 m panjang memanjang o = 1.1 m
berat m = 1.04 kg/m berat n = 1.04 kg/m berat o = 1.04 kg/m
jarak Cross tie = 100 mm jarak Cross tie = 150 mm jarak Cross tie = 100 mm
jumlah melintang m = 21 ea jumlah melintang n = 27 ea jumlah melintang o = 21 ea
jumlah memanjang m = 21 ea jumlah memanjang n = 27 ea jumlah memanjang o = 21 ea
sub total panjang m = 63 m sub total panjang n = 51.3 m sub total panjang o = 63 m

II PEMBESIAN / PENULANGAN
A. Tumpuan Kiri
- Panjang c = 3.1875 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
B. Lapangan
- Panjang g = 4.475 m
C. Tumpuan Kanan
- Panjang i = 3.1875 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
D. All Area
- Panjang b = 9.65 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
- Panjang e = 9.59 m
- S1 (lihat tabel conc. Reinf.) = 920 mm

III KESIMPULAN
A. Panjang Total
1 Tulangan Ø b, c, g, i = 140.93 m
* cat: Nilai S1 dipakai jika balok berada di ujung kolom / balok.
2 Tulangan Ø e = 57.54 m Tabel S1 yang dipakai adalah "without hook"
Tabel Pembesian wajib dicantumkan
3 Tulangan Ø f, j, k, m, n, o = 432.60 m = angka yang wajib diisi sesuai drawing

B. Berat Total C. Bekisting


1 Ø b, c, g & i = 542.76 kg >>> 4 25 = L netto x ((2 x sisi samping)+sisi bawah)
= 1,085.52 kg >>> 2 Unit = 23.25 m2
2 Øe = 171.61 kg >>> dia 22 = 46.50 m2 >> 2 Unit
= 343.23 kg >>> 2 Unit D. Beton
3 Ø f, j, k, m, n, o = 450.52 kg >>> dia 13 = L netto x luas penampang balok
= 901.04 kg >>> 2 Unit = 6.82 m3
= 13.64 m3 >> 2 Unit
PERHITUNGAN QUANTITY BALOK FL +6.000 ; as DS-1 DS-2 join XY - XY1
I INPUT DATA
a. Kode Balok = B1 QUANTITY = 2.00 UNIT
b. Dimensi Balok
Lebar (b) = 800 mm f. Tebal Selimut Atas (LSA) = 50 mm
Tinggi (h) = 1100 mm g. Tebal Selimut Samping (LSS) = 50 mm
c. L bruto (C-C) = 7.95 m h. L netto = 6.95 m
d. Lebar K1/B1 = 1000 mm i. Tumpuan Kiri (a1) = 1.74 m
e. Lebar K2/B2 = 1000 mm j. Lapangan (a3) = 3.48 m
k. Tumpuan Kanan (a2) = 1.74 m

Tumpuan Kiri Lapangan Tumpuan Kanan

1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm


n. b = 7 ea n. b = 7 ea n. b = 7 ea
berat b = 3.85 kg/m berat b = 3.85 kg/m berat b = 3.85 kg/m
2 Ø c (tul extra) = 25 mm 2 Ø g (tul extra) = 25 mm 2 Ø i (tul extra) = 25 mm
n. c = 8 ea n. g = 5 ea n. i = 8 ea
berat c = 3.85 kg/m berat g = 3.85 kg/m berat i = 3.85 kg/m
3 Ø e (torsi/web) = 22 mm 3 Ø e (torsi/web) = 22 mm 3 Ø e (torsi/web) = 22 mm
n. e = 6 ea n. e = 6 ea n. e = 6 ea
berat e = 2.98 kg/m berat e = 2.98 kg/m berat e = 2.98 kg/m
4 Ø f (sengkang) = 13 mm 4 Ø j (sengkang) = 13 mm 4 Ø k (sengkang) = 13 mm
keliling f = 3.7 m keliling j = 3.7 m kel. k = 3.7 m
berat f = 1.04 kg/m berat j = 1.04 kg/m berat k = 1.04 kg/m
jarak Sengkang = 100 mm jarak Sengkang = 150 mm jarak. seng = 100 mm
jumlah f = 19 ea jumlah j = 25 ea jumlah k = 19 ea
sub total panjang f = 70.3 m sub total panjang j = 92.5 m sub total panjang k = 70.3 m
5 Ø m (cross tie) = 13 mm 5 Ø n (cross tie) = 13 mm 5 Ø o (cross tie) = 13 mm
n. melintang m = 1 ea n. melintang n = 1 ea n. melintang o = 1 ea
n. memanjang m = 2 ea n. memanjang n = 1 ea n. memanjang o = 2 ea
panjang melintang m = 0.8 m panjang melintang n = 0.8 m panjang melintang o = 0.8 m
panjang memanjang m = 1.1 m panjang memanjang n = 1.1 m panjang memanjang o = 1.1 m
berat m = 1.04 kg/m berat n = 1.04 kg/m berat o = 1.04 kg/m
jarak Cross tie = 100 mm jarak Cross tie = 150 mm jarak Cross tie = 100 mm
jumlah melintang m = 19 ea jumlah melintang n = 25 ea jumlah melintang o = 19 ea
jumlah memanjang m = 19 ea jumlah memanjang n = 25 ea jumlah memanjang o = 19 ea
sub total panjang m = 57 m sub total panjang n = 47.5 m sub total panjang o = 57 m

II PEMBESIAN / PENULANGAN
A. Tumpuan Kiri
- Panjang c = 2.9875 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
B. Lapangan
- Panjang g = 4.075 m
C. Tumpuan Kanan
- Panjang i = 2.9875 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
D. All Area
- Panjang b = 8.85 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
- Panjang e = 8.79 m
- S1 (lihat tabel conc. Reinf.) = 920 mm

III KESIMPULAN
A. Panjang Total
1 Tulangan Ø b, c, g, i = 130.13 m
* cat: Nilai S1 dipakai jika balok berada di ujung kolom / balok.
2 Tulangan Ø e = 52.74 m Tabel S1 yang dipakai adalah "without hook"
Tabel Pembesian wajib dicantumkan
3 Tulangan Ø f, j, k, m, n, o = 394.60 m = angka yang wajib diisi sesuai drawing

B. Berat Total C. Bekisting


1 Ø b, c, g & i = 501.16 kg >>> dia 25 = L netto x ((2 x sisi samping)+sisi bawah)
= 1,002.33 kg >>> 2 Unit = 20.85 m2
2 Øe = 157.30 kg >>> dia 22 = 41.70 m2 >> 2 Unit
= 314.60 kg >>> 2 Unit D. Beton
3 Ø f, j, k, m, n, o = 410.94 kg >>> dia 13 = L netto x luas penampang balok
= 821.89 kg >>> 2 Unit = 6.116 m3
= 12.23 m3 >> 2 Unit
PERHITUNGAN QUANTITY BALOK FL +6.000 ; as DS-1 DS-2 join XY1 - C
I INPUT DATA
a. Kode Balok = B1 QUANTITY = 2.00 UNIT
b. Dimensi Balok
Lebar (b) = 800 mm f. Tebal Selimut Atas (LSA) = 50 mm
Tinggi (h) = 1100 mm g. Tebal Selimut Samping (LSS) = 50 mm
c. L bruto (C-C) = 5.2 m h. L netto = 4.2 m
d. Lebar K1/B1 = 1000 mm i. Tumpuan Kiri (a1) = 1.05 m
e. Lebar K2/B2 = 1000 mm j. Lapangan (a3) = 2.10 m
k. Tumpuan Kanan (a2) = 1.05 m

Tumpuan Kiri Lapangan Tumpuan Kanan

1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm


n. b = 7 ea n. b = 7 ea n. b = 7 ea
berat b = 3.85 kg/m berat b = 3.85 kg/m berat b = 3.85 kg/m
2 Ø c (tul extra) = 25 mm 2 Ø g (tul extra) = 25 mm 2 Ø i (tul extra) = 25 mm
n. c = 8 ea n. g = 5 ea n. i = 8 ea
berat c = 3.85 kg/m berat g = 3.85 kg/m berat i = 3.85 kg/m
3 Ø e (torsi/web) = 22 mm 3 Ø e (torsi/web) = 22 mm 3 Ø e (torsi/web) = 22 mm
n. e = 6 ea n. e = 6 ea n. e = 6 ea
berat e = 2.98 kg/m berat e = 2.98 kg/m berat e = 2.98 kg/m
4 Ø f (sengkang) = 13 mm 4 Ø j (sengkang) = 13 mm 4 Ø k (sengkang) = 13 mm
keliling f = 3.7 m keliling j = 3.7 m kel. k = 3.7 m
berat f = 1.04 kg/m berat j = 1.04 kg/m berat k = 1.04 kg/m
jarak Sengkang = 100 mm jarak Sengkang = 150 mm jarak. seng = 100 mm
jumlah f = 12 ea jumlah j = 15 ea jumlah k = 12 ea
sub total panjang f = 44.4 m sub total panjang j = 55.5 m sub total panjang k = 44.4 m
5 Ø m (cross tie) = 13 mm 5 Ø n (cross tie) = 13 mm 5 Ø o (cross tie) = 13 mm
n. melintang m = 1 ea n. melintang n = 1 ea n. melintang o = 1 ea
n. memanjang m = 2 ea n. memanjang n = 1 ea n. memanjang o = 2 ea
panjang melintang m = 0.8 m panjang melintang n = 0.8 m panjang melintang o = 0.8 m
panjang memanjang m = 1.1 m panjang memanjang n = 1.1 m panjang memanjang o = 1.1 m
berat m = 1.04 kg/m berat n = 1.04 kg/m berat o = 1.04 kg/m
jarak Cross tie = 100 mm jarak Cross tie = 150 mm jarak Cross tie = 100 mm
jumlah melintang m = 12 ea jumlah melintang n = 15 ea jumlah melintang o = 12 ea
jumlah memanjang m = 12 ea jumlah memanjang n = 15 ea jumlah memanjang o = 12 ea
sub total panjang m = 36 m sub total panjang n = 28.5 m sub total panjang o = 36 m

II PEMBESIAN / PENULANGAN
A. Tumpuan Kiri
- Panjang c = 2.3 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
B. Lapangan
- Panjang g = 2.7 m
C. Tumpuan Kanan
- Panjang i = 2.3 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
D. All Area
- Panjang b = 6.1 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
- Panjang e = 6.04 m
- S1 (lihat tabel conc. Reinf.) = 920 mm

III KESIMPULAN
A. Panjang Total
1 Tulangan Ø b, c, g, i = 93.00 m
* cat: Nilai S1 dipakai jika balok berada di ujung kolom / balok.
2 Tulangan Ø e = 36.24 m Tabel S1 yang dipakai adalah "without hook"
Tabel Pembesian wajib dicantumkan
3 Tulangan Ø f, j, k, m, n, o = 244.80 m = angka yang wajib diisi sesuai drawing

B. Berat Total C. Bekisting


1 Ø b, c, g & i = 358.18 kg >>> dia 25 = L netto x ((2 x sisi samping)+sisi bawah)
= 716.36 kg >>> 2 Unit = 12.6 m2
2 Øe = 108.09 kg >>> dia 22 = 25.20 m2 >> 2 Unit
= 216.17 kg >>> 2 Unit D. Beton
3 Ø f, j, k, m, n, o = 254.94 kg >>> dia 13 = L netto x luas penampang balok
= 509.88 kg >>> 2 Unit = 3.696 m3
= 7.39 m3 >> 2 Unit
PERHITUNGAN QUANTITY BALOK FL +6.000 ; as DS-a C join DS-1 DS-2
I INPUT DATA
a. Kode Balok = B2 QUANTITY = 2.00 UNIT
b. Dimensi Balok
Lebar (b) = 700 mm f. Tebal Selimut Atas (LSA) = 50 mm
Tinggi (h) = 1000 mm g. Tebal Selimut Samping (LSS) = 50 mm
c. L bruto (C-C) = 7.8 m h. L netto = 6.8 m
d. Lebar K1/B1 = 1000 mm i. Tumpuan Kiri (a1) = 1.70 m
e. Lebar K2/B2 = 1000 mm j. Lapangan (a3) = 3.40 m
k. Tumpuan Kanan (a2) = 1.70 m

Tumpuan Kiri Lapangan Tumpuan Kanan

1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm


n. b = 6 ea n. b = 6 ea n. b = 6 ea
berat b = 3.85 kg/m berat b = 3.85 kg/m berat b = 3.85 kg/m
2 Ø c (tul extra) = 25 mm 2 Ø g (tul extra) = 25 mm 2 Ø i (tul extra) = 25 mm
n. c = 4 ea n. g = 4 ea n. i = 4 ea
berat c = 3.85 kg/m berat g = 3.85 kg/m berat i = 3.85 kg/m
3 Ø e (torsi/web) = 16 mm 3 Ø e (torsi/web) = 16 mm 3 Ø e (torsi/web) = 16 mm
n. e = 4 ea n. e = 4 ea n. e = 4 ea
berat e = 1.58 kg/m berat e = 1.58 kg/m berat e = 1.58 kg/m
4 Ø f (sengkang) = 13 mm 4 Ø j (sengkang) = 13 mm 4 Ø k (sengkang) = 13 mm
keliling f = 3.3 m keliling j = 3.3 m kel. k = 3.3 m
berat f = 1.04 kg/m berat j = 1.04 kg/m berat k = 1.04 kg/m
jarak Sengkang = 100 mm jarak Sengkang = 150 mm jarak. seng = 100 mm
jumlah f = 18 ea jumlah j = 24 ea jumlah k = 18 ea
sub total panjang f = 59.4 m sub total panjang j = 79.2 m sub total panjang k = 59.4 m
5 Ø m (cross tie) = 13 mm 5 Ø n (cross tie) = 13 mm 5 Ø o (cross tie) = 13 mm
n. melintang m = 1 ea n. melintang n = 1 ea n. melintang o = 1 ea
n. memanjang m = 0 ea n. memanjang n = 0 ea n. memanjang o = 0 ea
panjang melintang m = 0.7 m panjang melintang n = 0.7 m panjang melintang o = 0.7 m
panjang memanjang m = 1 m panjang memanjang n = 1 m panjang memanjang o = 1 m
berat m = 1.04 kg/m berat n = 1.04 kg/m berat o = 1.04 kg/m
jarak Cross tie = 100 mm jarak Cross tie = 150 mm jarak Cross tie = 100 mm
jumlah melintang m = 18 ea jumlah melintang n = 24 ea jumlah melintang o = 18 ea
jumlah memanjang m = 18 ea jumlah memanjang n = 24 ea jumlah memanjang o = 18 ea
sub total panjang m = 12.6 m sub total panjang n = 16.8 m sub total panjang o = 12.6 m

II PEMBESIAN / PENULANGAN
A. Tumpuan Kiri
- Panjang c = 2.95 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
B. Lapangan
- Panjang g = 4m
C. Tumpuan Kanan
- Panjang i = 2.95 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
D. All Area
- Panjang b = 8.7 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
- Panjang e = 7.88 m
- S1 (lihat tabel conc. Reinf.) = 540 mm

III KESIMPULAN
A. Panjang Total
1 Tulangan Ø b, c, g, i = 91.80 m
* cat: Nilai S1 dipakai jika balok berada di ujung kolom / balok.
2 Tulangan Ø e = 31.52 m Tabel S1 yang dipakai adalah "without hook"
Tabel Pembesian wajib dicantumkan
3 Tulangan Ø f, j, k, m, n, o = 240.00 m = angka yang wajib diisi sesuai drawing

B. Berat Total C. Bekisting


1 Ø b, c, g & i = 353.56 kg >>> dia 25 = L netto x ((2 x sisi samping)+sisi bawah)
= 707.12 kg >>> 2 Unit = 18.36 m2
2 Øe = 49.72 kg >>> dia 16 = 36.72 m2 >> 2 Unit
= 99.45 kg >>> 2 Unit D. Beton
3 Ø f, j, k, m, n, o = 249.94 kg >>> dia 13 = L netto x luas penampang balok
= 499.88 kg >>> 2 Unit = 4.76 m3
= 9.52 m3 >> 2 Unit
PERHITUNGAN QUANTITY BALOK FL +6.000 ; as DS-a' DS-b A A' join DS-1 DS-2
I INPUT DATA
a. Kode Balok = B2 QUANTITY = 4.00 UNIT
b. Dimensi Balok
Lebar (b) = 700 mm f. Tebal Selimut Atas (LSA) = 50 mm
Tinggi (h) = 1000 mm g. Tebal Selimut Samping (LSS) = 50 mm
c. L bruto (C-C) = 7.8 m h. L netto = 7 m
d. Lebar K1/B1 = 800 mm i. Tumpuan Kiri (a1) = 1.75 m
e. Lebar K2/B2 = 800 mm j. Lapangan (a3) = 3.50 m
k. Tumpuan Kanan (a2) = 1.75 m

Tumpuan Kiri Lapangan Tumpuan Kanan

1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm 1 Ø b (tul utama/utuh) = 25 mm


n. b = 6 ea n. b = 6 ea n. b = 6 ea
berat b = 3.85 kg/m berat b = 3.85 kg/m berat b = 3.85 kg/m
2 Ø c (tul extra) = 25 mm 2 Ø g (tul extra) = 25 mm 2 Ø i (tul extra) = 25 mm
n. c = 4 ea n. g = 4 ea n. i = 4 ea
berat c = 3.85 kg/m berat g = 3.85 kg/m berat i = 3.85 kg/m
3 Ø e (torsi/web) = 16 mm 3 Ø e (torsi/web) = 16 mm 3 Ø e (torsi/web) = 16 mm
n. e = 4 ea n. e = 4 ea n. e = 4 ea
berat e = 1.58 kg/m berat e = 1.58 kg/m berat e = 1.58 kg/m
4 Ø f (sengkang) = 13 mm 4 Ø j (sengkang) = 13 mm 4 Ø k (sengkang) = 13 mm
keliling f = 3.3 m keliling j = 3.3 m kel. k = 3.3 m
berat f = 1.04 kg/m berat j = 1.04 kg/m berat k = 1.04 kg/m
jarak Sengkang = 100 mm jarak Sengkang = 150 mm jarak. seng = 100 mm
jumlah f = 19 ea jumlah j = 25 ea jumlah k = 19 ea
sub total panjang f = 62.7 m sub total panjang j = 82.5 m sub total panjang k = 62.7 m
5 Ø m (cross tie) = 13 mm 5 Ø n (cross tie) = 13 mm 5 Ø o (cross tie) = 13 mm
n. melintang m = 1 ea n. melintang n = 1 ea n. melintang o = 1 ea
n. memanjang m = 0 ea n. memanjang n = 0 ea n. memanjang o = 0 ea
panjang melintang m = 0.7 m panjang melintang n = 0.7 m panjang melintang o = 0.7 m
panjang memanjang m = 1 m panjang memanjang n = 1 m panjang memanjang o = 1 m
berat m = 1.04 kg/m berat n = 1.04 kg/m berat o = 1.04 kg/m
jarak Cross tie = 100 mm jarak Cross tie = 150 mm jarak Cross tie = 100 mm
jumlah melintang m = 19 ea jumlah melintang n = 25 ea jumlah melintang o = 19 ea
jumlah memanjang m = 19 ea jumlah memanjang n = 25 ea jumlah memanjang o = 19 ea
sub total panjang m = 13.3 m sub total panjang n = 17.5 m sub total panjang o = 13.3 m

II PEMBESIAN / PENULANGAN
A. Tumpuan Kiri
- Panjang c = 3m
- S1 (lihat tabel conc. Reinf.) = 950 mm
B. Lapangan
- Panjang g = 4.1 m
C. Tumpuan Kanan
- Panjang i = 3m
- S1 (lihat tabel conc. Reinf.) = 950 mm
D. All Area
- Panjang b = 8.9 m
- S1 (lihat tabel conc. Reinf.) = 950 mm
- Panjang e = 8.08 m
- S1 (lihat tabel conc. Reinf.) = 540 mm

III KESIMPULAN
A. Panjang Total
1 Tulangan Ø b, c, g, i = 93.80 m
* cat: Nilai S1 dipakai jika balok berada di ujung kolom / balok.
2 Tulangan Ø e = 32.32 m Tabel S1 yang dipakai adalah "without hook"
Tabel Pembesian wajib dicantumkan
3 Tulangan Ø f, j, k, m, n, o = 252.00 m = angka yang wajib diisi sesuai drawing

B. Berat Total C. Bekisting


1 Ø b, c, g & i = 361.26 kg >>> dia 25 = L netto x ((2 x sisi samping)+sisi bawah)
= 1,445.05 kg >>> 4 Unit = 18.9 m2
2 Øe = 50.99 kg >>> dia 16 = 75.60 m2 >> 4 Unit
= 203.94 kg >>> 4 Unit D. Beton
3 Ø f, j, k, m, n, o = 262.44 kg >>> dia 13 = L netto x luas penampang balok
= 1,049.75 kg >>> 4 Unit = 4.9 m3
= 19.60 m3 >> 4 Unit
PERHITUNGAN QUANTITY PELAT BETON FL +6.000 ; as DS-1 DS-2 join DS-A - XY
I INPUT DATA Quantity 3 unit
a Kode Pelat = P1
b Dimensi Pelat = angka yang wajib diisi sesuai drawing
Panjang Pelat (p) = 4000 mm
Lebar Pelat (l) = 4000 mm
c Tebal Pelat (t) = 150 mm
d Balok 1 (B1)
lebar (b1) = 300 mm
tinggi (h1) = 500 mm
tebal selimut balok (TSB1) = 50 mm
e Balok 2 (B2)
lebar (b2) = 300 mm
tinggi (h2) = 500 mm
tebal selimut balok (TSB2) = 50 mm
f Balok 3 (B3)
lebar (b3) = 300 mm
tinggi (h3) = 500 mm
tebal selimut balok (TSB3) = 50 mm
g Balok 4 (B4)
lebar (b4) = 300 mm
tinggi (h4) = 500 mm
tebal selimut balok (TSB4) = 50 mm
h Panjang Netto Pelat (p') = 3700 mm
i Lebar Netto Pelat (l') = 3700 mm
Tebal Selimut Pelat (TSP) = 25 mm

II PEKERJAAN STEELDECK IV PEKERJAAN BEKISTING


a Tulangan Steeldeck = 14.44 m2 a Volume Bekisting
= 43.32 m2 >>>> 3 unit = 13.69 m2
= 41.07 m2 >>>> 3 unit
III PEKERJAAN WIREMESH
a Tulangan Wiremesh Atas = 12.58 m2 V PEKERJAAN PENGECORAN BETON
= 37.73 m2 >>>> 3 unit a Volume Pengecoran Beton
b Tulangan Wiremesh Bawah = 16.00 m2 = 2.05 m3
= 48.00 m2 >>>> 3 unit = 6.16 m3 >>>> 3 unit

VI PEKERJAAN TULANGAN KONVENSIONAL


a. Tulangan Tipe I e Tulangan Susut A
Ø Tulangan = 10 mm Ø Tulangan = 10 mm
Jarak Tulangan = 400 mm Jarak Tulangan = 200 mm
Panjang Tulangan = 5.041 m Panjang Tulangan = 4 m
Jumlah Tulangan = 6 ea Jumlah Tulangan = 6 ea
Berat Tulangan = 0.62 kg/m Berat Tulangan = 0.62 kg/m
b. Tulangan Tipe II f Tulangan Susut B
Ø Tulangan = 10 mm Ø Tulangan = 10 mm
Jarak Tulangan = 400 mm Jarak Tulangan = 200 mm
Panjang Tulangan = 5.04 m Panjang Tulangan = 4 m
Jumlah Tulangan = 6 ea Jumlah Tulangan = 6 ea
Berat Tulangan = 0.62 kg/m Berat Tulangan = 0.62 kg/m
c. Tulangan Tipe III g Tulangan Susut C
Ø Tulangan = 10 mm Ø Tulangan = 10 mm
Jarak Tulangan = 400 mm Jarak Tulangan = 200 mm
Panjang Tulangan = 5.04 m Panjang Tulangan = 4 m
Jumlah Tulangan = 6 ea Jumlah Tulangan = 6 ea
Berat Tulangan = 0.62 kg/m Berat Tulangan = 0.62 kg/m
d. Tulangan Tipe IV h Tulangan Susut D
Ø Tulangan = 10 mm Ø Tulangan = 10 mm
Jarak Tulangan = 400 mm Jarak Tulangan = 200 mm
Panjang Tulangan = 5.04 m Panjang Tulangan = 4 m
Jumlah Tulangan = 6 ea Jumlah Tulangan = 6 ea
Berat Tulangan = 0.62 kg/m Berat Tulangan = 0.62 kg/m

Panjang Total Berat Total


Tulangan Tipe I = 30.25 m Tulangan Tipe I = 18.64935 kg D 10
= 55.94806 kg >>>> 3 unit
Tulangan Tipe II = 30.25 m Tulangan Tipe II = 18.64935 kg D 10
= 55.94806 kg >>>> 3 unit
Tulangan Tipe III = 30.25 m Tulangan Tipe III = 18.64935 kg D 10
= 55.94806 kg >>>> 3 unit
Tulangan Tipe IV = 30.25 m Tulangan Tipe IV = 18.64935 kg D 10
= 55.94806 kg >>>> 3 unit
Tulangan Susut A = 24 m Tulangan Susut A = 14.7969 kg D 10
= 44.3907 kg >>>> 3 unit
Tulangan Susut B = 24 m Tulangan Susut B = 14.7969 kg D 10
= 44.3907 kg >>>> 3 unit
Tulangan Susut C = 24 m Tulangan Susut C = 14.7969 kg D 10
= 44.3907 kg >>>> 3 unit
Tulangan Susut D = 24 m Tulangan Susut D = 14.7969 kg D 10
= 44.3907 kg >>>> 3 unit
PERHITUNGAN QUANTITY BOR PILE FL +6.000 ; as DS-1 DS-2 join DS-A - XY
I INPUT DATA Quantity 1 unit
a Kode Bor Pile = BP1
b Dimensi Bor Pile = angka yang wajib diisi sesuai drawing
Diameter Bor Pile (d) = 600 mm
Panjang Bor Pile (h) = 4000 mm
c Tebal Selimut Samping (TSS) = 50 mm
d Diameter Netto Bor Pile (d') = 500 mm
e Tebal Pile Cap (h) 800 mm
f Tebal Selimut Pile Cap (TSP) 75 mm

II PERHITUNGAN TULANGAN
a Tulangan Utama (P)
Ø Tulangan 16 mm
Jumlah = 4 ea
Panjang Tulangan Dalam (L) = 4 m
Panjang Tulangan Luar (L1+5D) = 0.81 m
Berat = 1.58 kg/m
b Tulangan Sengkang (Q)
Ø Tulangan = 10 mm
Jarak Sengkang = 200 mm
Jumlah Tulangan = 21 ea
Panjang Tulangan = 1.57 m
Berat 0.62 kg/m

III KESIMPULAN
a Panjang Tulangan Total
ØP = 19.22 m
ØQ = 32.99 m
b Berat Tulangan Total
ØP = 30.34 kg >>>> D 16
30.34 kg >>>> 1 unit
ØQ = 20.34 kg >>>> D 10
20.34 kg >>>> 1 unit
c Panjang Pengeboran = 4 m
4 >>>> 1 unit
d Pembuangan Hasil Pengeboran = 1.13 m3
1.13 >>>> 1 unit
e Pengecoran Beton = 1.13 m3
1.13 >>>> 1 unit
PERHITUNGAN QUANTITY STAIR FL +6.000 ; as DS-
I INPUT DATA Quantity 1 unit
a Kode Tangga = T1
b Dimensi Tangga = angka yang wajib diisi se
Panjang Tangga (p) = 2500 mm
Lebar Tangga (l) = 250 mm
c Tebal Pelat (t) = 120 mm
d Balok 1 (B1)
lebar (b1) = 300 mm
tinggi (h1) = 500 mm
tebal selimut balok (TSB1) = 50 mm
e Balok 2 (B2)
lebar (b2) = 300 mm
tinggi (h2) = 500 mm
tebal selimut balok (TSB2) = 50 mm
f Balok 3 (B3)
lebar (b3) = 300 mm
tinggi (h3) = 500 mm
tebal selimut balok (TSB3) = 50 mm
g Balok 4 (B4)
lebar (b4) = 300 mm
tinggi (h4) = 500 mm
tebal selimut balok (TSB4) = 50 mm
h Panjang Netto Pelat (p') = 2800 mm
i Lebar Netto Pelat (l') = 550 mm
L +6.000 ; as DS-1 DS-2 join DS-A - XY

angka yang wajib diisi sesuai drawing

You might also like