QATAR UNIVERSITY

College of Engineering
Dept. of Mechanical & Industrial
Engineering Industrial & Systems
Engineering Program

IENG 210 – Work Methods and Measurements


Lab Quiz
Fill in blank

1- PFD Allowance is the adjustment done to the normal time for the purpose to
recover the lost time due to personal needs, fatigue, and unavoidable delays.
2- The two factors influencing the work sampling procedure are
Normal frequency distribution and confidence level
Multiple choice:
1. Which of the following is NOT used for Methods Analysis.
a. Worker-machine chart
b. Gantt chart
c. Flow diagram
d. String diagram

2. The nuts, bolts (clamps) and washers were used to study motion economy principles
using
a) Flow process chart
b) String diagram
c) Time study rater chart.
d) Two handed process chart.

3. “A Worker removes the Machined Part from the lathe machine, takes it to material
inspection lab which is 500m far, inspects the Machines Part and places in the steel
cabinet”. Which of the following sequence of Process Chart Symbols represent the given case
correctly.
a. Circle > Triangle > Square > Arrow
b. Circle > Square > Triangle > Arrow
c. Circle > Arrow > Square > Triangle
d. Square > Triangle > Circle > Arrow
QATAR UNIVERSITY
College of Engineering
Dept. of Mechanical & Industrial
Engineering Industrial & Systems
Engineering Program

Problem solving
1) You are given the Nuts, Bolts, and Washers in separate storage bins on a working table as
shown in the following layout. Your job is to assemble them as shown in figure, after
improving the process and utilizing the motion economy principles.

a) Briefly describe the Motion Economy Principles you will consider in this case of assembly
Two hands must initiate and complete the motion at the same time. Also, two hands must not be idle at the
same time or when resting. Motion of the arms must be made at the same time; Eye and hand eye
synchronization must be present; and • Continuous curve movements are favored to straight motions.

b) Write down the steps for the improved assembly procedure clearly mentioning the
working of left or right hands

Both the left and right hands must be used simultaneously. With our right side, pick up the bolt. With your left
hand, pick up a washer and place it on the bolt, and pick up a bolt and assemble it on your bolt. Place the
assembly on the right side of your bin.
QATAR UNIVERSITY
College of Engineering
Dept. of Mechanical & Industrial
Engineering Industrial & Systems
2)Engineering
Given belowProgram
is the Time Study Worksheet from the experiment where we assembled the
muffler clamp assembly.

Element Element Readings


Number description
1 2 3 4 5 6 7 8 9 10
Take 4 U-bolt T 2.07 1.91 2.41 1.88 2.01 1.66 1.99 2.30 1.91
1 and interest on
box PR 60% 100% 66% 120% 80% 110% 100% 65% 110%
Take 4 clamps T 1.43 2.53 1.28 1.68 1.77 1.87 1.66 1.51 1.66
2 and fix with U-
bolt PR 100% 60% 110% 90% 85% 75% 100% 100% 95%
Take 4 nuts and T 4.40 6.02 3.99 4.02 4.04 3.96 3.56 4.54 3.90
3
fix PR 60% 100% 66% 120% 80% 110% 100% 65% 110%
Take 4 nut and T 5.62 5.32 4.78 4.65 5.33 4.66 5.67 4.64 5.3
4
fix PR 75% 100% 100% 95% 100% 120% 110% 100% 80%

Find out the following to complete the rest of the Time Study Worksheet (show your
calculations)

No. Average %Rating Normal Frequency Unit Normal Range (R) R/X Highest
time time
1 2.02 90.11% 1.78 ¼ 0.445 0.75 0.371
2 1.71 90.56% 1.50 ¼ 0.375 1.25 0.731 
3 4.27 90.11% 3.83 ¼ 0.958 2.46 0.576
4 5.11 108.89% 4.98 ¼ 1.245 1.02 0.199

Sample Calculations for Normal Time, Unit Normal Time, Range, R/X-Bar
QATAR UNIVERSITY
College of Engineering
Dept. of Mechanical & Industrial
Engineering Industrial & Systems
Engineering Program
Calculate the following items for completing the time study form. (Show your
calculations)

Total Normal Time =


Allowance Time (10%)
Standard Time =
Units Per Hour =
Also, find out the Number of Cycles for this Motion Time Study data based on the 10
cycles in the given table

83