You are on page 1of 4

Website

11
1-IF(d ft{efiI{ Government of India
Central Electricity Authority
fl4 fihJ,i;H:I @ ..,...., Southern Regionul Pow r CummiUee
- 560 009 Bengaluru- 560 009

_
Emai I:111ss r12c - ka(a n tc, in
1 Phone:080-22287205 I Fax:080-22259343
/No. I SRPC/SE-l/RAMP/2022-23/ I / Date: 07.02.2024

Subject: Certification of Ramping Performance of Thermal ISGS of Southern Region.

Regulation 30 of Central Electricity Regulatory Commission (Terms and Conditions of Tariff)


Regulations, 2019 stipulates as follows:

Return on Equity:
(l) Return on equity shall be computed in rupee terms, on the equity base determined in
accordance with Regulation 18 of these regulations.
(2) Return on equity shall be computed at the base rate of 15.50% for thermal generating station,

Provided that

(iii) In case of a thermal generating station, with effect from 1.4.2020:

a) Rate ofreturn on equity shall be reduced by 0.25% in case of failure to achieve the
ramp rate of l % per minute;

b) An additional rate of return on equity of 0.25% shall be allowed for every


incremental ramp rate of 1% per minute achieved over and above the ramp rate of
1 % per minute, subject to ceiling of additional rate of return on equity of 1.00%:

NLDC vide letter dated 30.12.2020 has issued Revised detailed guidelines for assessment of
ramping capability of thermal Interstate generating stations (!SGS) wherein it is stated that a statement
of summary of calculations shall be prepared by respective RLDCs and certified by RPCs, at the
end of each month of the financial year on cumulative basis, which shall indicate the ramping
performance evaluation of each coal/lignite ISGS based on the metrics specified in these guidelines
along with recommendation for change in rate of return of equity. The statement shall be posted on
RPCs' websites for information of all stakeholders. Also NLDC vide e-mail dated 26.03.2021
communicated a change in the ramp logic in respect of 'D-Number of Time Blocks where schedule
ramp 2: 1%/min'.

SRLDC vide letter dated 05.02.2024 (Annexure) has furnished the ramp performance of thermal
ISGS of Southern Region up to the month of December 2023.

l'agu: I uf1
The statement of summary of calculations of ramping performance of thermal !SGS of Southern
Re,11;ion up to the month of Dcccmhcr 2023 (for FY 2023-24) fu rn ishe.d by SRLDC is c.ertified
as under:

Ramp Performance of Thermal ISGS of SR up to the Month of December 2023 (FY 2023-24)
Recomme
Td/T AAR nded
SI ISGS Tm Td D E F E/D F/D
m R change
No in RoE
(%)
1 NTPC- RSTPS 2437..7 21819 0.9 374 235 249 0.92 0.63 0.67 0
Stage-I & II
2 NTPC- RSTPS 24673 24619 1 570 396 439 1 0.69 0.77 0
Stage-Ill
3 NTPC- Talcher 26213 25748 0.98 219 177 185 1.02 0.81 0.84 0
STPS Stage- II
4 NTPC-Simhadri 22429 22286 0.99 645 477 529 1 0.74 0.82 0
STPS Stage-I
5 NTPC -Simhadri 22718 21531 0.95 267 196 209 0.96 0.73 0.78 0
STPS Stage- I I
6 NTPC-Kudgi 23687 22274 0.94 514 391 454 1 0.76 0.88 0
STPS Stage-I
7 NTECL-Vallur 23312 22611 0.97 557 355 430 1.01 0.64 0.77 0
STPS
8 NLC -TPS II 10480 10463 1 18 3 4 0.73 0.17 0.22 0
Stage-I
9 NLC-TPS II 14172 14132 1 33 9 10 0.7 0.2 0.3 0
Stage-II 7
10 NLC-TPS I 25008 24999 1 150 78 89 0.92 0.5 0.59 0
Expn. 2
11 NLC- TPS II 19716 19576 0.99 97 47 48 0.7 0.48 0.49 0
Expn.
12 25968 25967 1 585 370 386 0.9 0.63 0.66 0
NNTPS
13 23013 23010 1 352 208 258 0.98 0.59 0.73 0
NTPL
14 Telangana STPP 5379 5249 0.98 413 350 358 0.98 0.85 0.87 0

Tm-Total number of Time Blocks Ramp rate declaration by generator (excluding blocks when DC= 0
or when SCH < Tech Min)
Td-Number of Time Blocks Where Declared Ramp up & down rate 2 I%
D-Number of Time Blocks where scheduled ramp 2 I %/min (if CLl!Tent block and preceding
block are part of Tm and scheduled ramp in current block is greater than or equal to I%, such
block may be counted in D)
E-O ut of(D), number of Time Blocks where actual ramp 2:: scheduled ramp
F-Out of (D), number of Time Blocks where actual ramp 2 I % /min
AARR-Average Actual Ramp Rate during blocks when scheduled ramp 2 I %/min (%/min)
RoE- Return on Eauitv

( Jf1+@ /
er -
Asi t Sin h)
*l «H-IR!cl/ Member Secretary
Page 2 of2
CIN No. U4010SDL2009GOl188682

G2 'RR'-illt11
fi
('q'fUI' m:;fiR 'iifiT )
'1Tcf{ 3TT"Cft r., cfi1,{4'1 fo, GRID-IN IA
GRID CONTROLLER OF INDIA LIMITED
(A Government of India Enterprise) 7;:;.
Erstwhile POWER SYSTEM OPERATION CORPORATION LIMITED AzadlK,
nirit Mal ol sc.1v
mrur R,29,nr m, -s60009
SOUTHERN REGIONAL LOAD DESPATCH CENTRE, 29, RACE COURSE CROSS ROAD, BENGALURU - 560 009
Ref. No.: SRLDC/SO-2/2023-24/RampCertification/09-02 Date: 05/02/2024

/Merr,ber Secretary
?JarUf $ftq / South ern Regional Power Committee,
-09/Bangalore- 09

Sub: Revised Ramp Performance of Thermal Power Stations up to December 2023

/Dear
Sir,
\JJ-1)f2i I " W@T msi:11f.:l !l.l" m
Q-1Qa;gl 26/03/2021 3fR" Jfl Qa;gl ':_! cflDI 29;03;2021 Jflw-{
2023 cfcpzjafuft- aBi?.fl@-qfcR mm 'i:ITT I

Bmifi *a m t1
Please find enclosed Revised Ramp Performance of Thermal Power Stations of Southern
Region up to the month of December 2023 based on the "Revised Detailed Guidelines for
Assessment of Ramping Capability" of Inter State Generating Stations and NLDC email dt.
26/03/2021 along with SRLDC confirmation email dt. 29/03/2021.

The data in excel format is also attached with this mail.

/Thanking you

Yours Faithfully

·
(it /T Srinivas)
/CGM
'CR13TT- / SO-II

'i3iW -a,ll /Enclosure s as


above

Copy To

1. Executive Director, NLDC


II
I

'"11 Ramp Pe rfo rmance of Thermal Power Stations for Month December-2023
ti Number of months in computation {M): g
] No. of Time Average actual
Total no.of Blocks Where No. of time Out of (D), no. of Out of (D), no. of ramp rate during

I
. T" Bl k D d d/ blocks where time blocks where time blocks where blocks when / / Recommended
Stat,on ,me oc s ecIare Ramp T Tm ED F D
(Tm) Up& Down rate scheduled ramp actual ramp 2 actual ramp 2 scheduled ramp 2 change in RoE(%J
2 1%/min (D) scheduled ramp (El 1%/min (F) 1%/min (%/min)
21%T( d) IAARRl
J . I KUDGI 23687 22274 0.94 514 391 454 1 0 76 0.88 0
I J NLCEXP 25008 24999 1 150 78 89 0.92 0 52 0.59 0
l .DI NLCIISTl 10480 10463 1 18 3 4 0.73 0 17 0.22 0
I .8 NLCIIST2 14172 14132 1 33 9 10 0.7 0.27 0.3 0
J dJ NLCTS2EXP 19716 19576 0.99 97 47 48 0.7 0.48 0.49 O
I QI NNTPP 25968 25967 1 585 370 386 0.9 0.63 0.66 0
IIJ NTPL 23013 23010 1 352 208 258 0.98 0.59 0.73 o
II RSTPSU1TO6 24327 21819 0.9 374 235 249 0.92 0.63 0.67 0
l ] RSTPSU7 24673 24619 1 570 396 439 1 0.69 0.77 0
I SIMHSTl 22429 22286 0.99 645 477 529 1 0.74 O 82 O
I SIMHST2 22718 21531 0.95 267 196 209 0.96 0.73 0.78 o
I TALST2 26213 25748 0.98 219 177 185 1.02 0.81 0.84 0
· 1 lrelanganaSTPP 5379 5249 0.98 413 350 358 0.98 0.85 0.87 0
] ) VALLURNTECL 23312 22611 0.97 557 355 430 1.01 0.64 0.77 0