You are on page 1of 2

PROJECT INFORMATION SHEET

Stribling Reserve
– Main Pavilion Design
Overview / background
Stribling Reserve is Lorne’s major open space recreation
facility, with key user groups including the Lorne P-12 College,
Lorne Football Netball Club (LFNC), Lorne Men’s Shed and
the local community.
LFNC is the town’s oldest and largest recreational club and
holds nine home games at Stribling Reserve each season,
including a marquee Easter Saturday match which attracts
up to 5000 spectators.
Construction will begin on a new main pavilion at the
reserve in early 2021, replacing the existing facility. The
new pavilion, is a partnership-funded project between the Current status
Australian Government, Surf Coast Shire Council and the local The design has been produced and is available for review.
community and will provide new amenities and community Community members have the opportunity to provide
meeting and function spaces for all to enjoy. comment at www.surfcoast.vic.gov.au/About-us/Your-
Say/Stribling-Reserve-Pavilions-Redevelopment-Project
The works by Monday 21 December, 2020. Work is expected to be
The new pavilion will increase from a single storey to double complete by the end of 2021.
storey building to accommodate all required spaces and will
be a feature and centrepiece of Lorne’s community facilities. Expected operation
The ground floor will include change rooms and amenities
The facility will continue to be used by the school on a daily
for use by the school and LFNC, public toilets, an accessible
basis and LFNC will use the facility for all training and match-
toilet, an office, first aid/trainers’ room, umpire amenities,
day purposes. It will be fully accessible, meeting all disability
storage and a canteen and drinks kiosk. The second storey
standards and guidelines, including direct access to the oval
will include a large social and community meeting and
and a lift within the main pavilion. The upgrade will allow the
function space capable of hosting events for up to 240
Stribling Reserve Committee to make the facility available
people. It will also include a balcony, kitchen/bar facilities and
for a wider range of community meeting, event and function
scorers’ room. The existing stadium will remain as is with a
purposes.
slight increase in storage space.

www.surfcoast.vic.gov.au
PAVILION FLOOR PLAN

Store 3
Store 2
Store 1

Gymnasium

Atrium
Lift

Rear Access

Passage
Passage

Services
Trainers

First Aid
Public Female Clnr' Store Disabled 02
Airlock Airlock
Foyer

Ump' Amenity
Amenities 01 Away Amenities

Disabled 01
Conference Room
Home Change Canteen Ump Change
Uniform
Away Change

Cpd

Public Male Trainers

Drinks Kiosk

Store 1 Store 2 Store 3

UP

Gymnasium

Landing 1

Lift

DB Landing 2
Passage

Services
Female

Dry Store Room

Chair Store

Social Room 1 Social Room 2 Kitchen Cool Room Disabled


Social Room 3
Bar

Breakout

Male
Scorers

Balcony

You might also like