The document is a bill of quantities (BOQ) for construction works. It lists 60 activities with descriptions, units, quantities, unit rates, and amounts for each. The activities cover excavation, filling, concrete works, masonry, plastering, joinery, painting, electrical, plumbing, and other works required to construct a multi-story building. The total amount for all activities is over ₹8.2 crore.
The document is a bill of quantities (BOQ) for construction works. It lists 60 activities with descriptions, units, quantities, unit rates, and amounts for each. The activities cover excavation, filling, concrete works, masonry, plastering, joinery, painting, electrical, plumbing, and other works required to construct a multi-story building. The total amount for all activities is over ₹8.2 crore.
The document is a bill of quantities (BOQ) for construction works. It lists 60 activities with descriptions, units, quantities, unit rates, and amounts for each. The activities cover excavation, filling, concrete works, masonry, plastering, joinery, painting, electrical, plumbing, and other works required to construct a multi-story building. The total amount for all activities is over ₹8.2 crore.
CW-EW-10 Excavation CW-EW-20 Granular fill CW-EW-30 Anti termite Spray CW-EW-40 Back Filling CW-PR-50 Plain Cement Concrete CW-PR-60 RCC in Raft Foundation CW-PR-70 Plinth Beam CW-PR-80 RCC in Ground Floor CW-PR-90 RCC in First Floor CW-PR-100 RCC in Second Floor CW-PR-110 RCC in Third Floor CW-PR-120 RCC in Fourth Floor CW-BW-140 Brick Masonery in Foundation CW-BW-150 Brick Masonery in Ground Floor CW-BW-160 Brick Masonery in First Floor CW-BW-170 Brick Masonery in Second Floor CW-BW-180 Brick Masonery in Third Floor CW-RI-190 Roof Insulation CW-FMD-200 Flooring , Marble Steps & Dado CW-PD-210 Plaster Work in Ground Floor CW-PD-220 Plaster Work in First Floor CW-PD-230 Plaster Work in Second Floor CW-PD-240 Plaster Work in Third Floor CW-PD-250 Distempering Works CW-JW-260 Joinery Works CW-PW-270 Painting Works (For Joinery) CW-MS-280 Hand Rail EW-PVC-290 PVC Conduits( for telephone & network cables) EW-WT-300 Wiring EW-WT-310 Telephone Network EW-CDb-320 Power Cables & Distribution Boards EW-ES-330 Earthing system EW-FL-340 Fans & lights Fittings PW-SF-350 Sanitary Fixtures & Fittings PW-WS-360 Water Supply Pipes and Fittings PW-SWV-370 Soil Waste Ventilating Pipes & Fittings PW-GS-380 Gas Supply Pipes and Fittings PW-RW-390 Rain Water Pipes PW-VL-400 Valves BOQ DESCRIPTION UNIT QTY UNIT RATE
nery in Foundation nery in Ground Floor nery in First Floor nery in Second Floor nery in Third Floor
arble Steps & Dado
k in Ground Floor k in First Floor k in Second Floor k in Third Floor
2.2. What Are The Types of Excavation Needed For This Foundation? Construction? Describe The Associated Temporary Works For The Construction of Foundation