FAMILY ENTERTAINMENT CENTRE CLIENT:

BACK OF HOUSE
CONSULTANT: CONTRACTOR: SUB-CONTRACTOR:

NCR Raised by : - Client / Client Rep. - Proj. Manager - Consultant - Others NCR Ref. No. :
Discipline : - Civil/Structural - Architectural - Mechanical - Electrical - HSE ATL21SEJV-2414-FEC-BOH-ARCH-GYP-NCR-XXX
Floor/Location/Area/Gridlin Date Issued : 3-Mar-24

NON COMPLIANCE REPORT-NCR


A. Details of Non-compliance : B. Reference Documents :
Specification Ref.:
Finishes not matching with the existing Drawing No.:
Material Approval :
Others:

Attachment site photos

NCR Raised by: Noted by : NCR Acknowledge by: (Sub Contractor)

Name and Signature : Name and Signature : Name and Signature :

Designation : Designation Designation

Date Date Date

C. PROPOSED CORRECTIVE ACTION: (MUST be replied by the Sub Contractor within 3 days)D. ACCEPTANCE OF PROPOSAL:
- Approved; proceed as proposed
- Approved with comments; proceed but follow
comments below.
- NOT Acceptable; submit new proposal

proceed with rectification

Name & Signature : ate : Name / Signature / Date

E. CORRECTIVE ACTION TAKEN: (to be filled by the Sub Contractor)

Name & Signature : Designation : Date :

F. Corrective Action Satisfactorily Carried Out: Comments / Remarks :


- YES - NO
Verified by:
Name & Sign:
Designation:
Date:

G. Close Out Approved by:(Client or Consultant) Remarks (if any) :


Approved by:

Name & Sign:


Designation:
Date:

Note : Approval & close-out of this NCR shall not relieve the Sub Contractor from his obligation to perform the work in accordance with the contract documents and other contract requirements.