You are on page 1of 2

Project Title: Transmittal No.

PRINCE ABDUL MAJID BIN ABDUL AZIZ PROJECT PHASE 1 - AL-ULA


FUEL HYDRANT BRANCHES

Consultant Contractor: Sub-Contractor: Date:

Drawing Transmittal
To: From Almabani General Contractors
Attention: Engr. By Engr. Zaher EL Hajj

1. SUBJECT DESCRIPTION

Reference No.: N/A Area of Application: N/A

2. SUBMITTAL DETAILS

Item Reference Rev. Type Copies Description

Issued Via
X Hand Email Courier Fax Mail Online

Issued for
X Approval Information As Requested Review and Comment

Initial :

Submitted by: Signature Date

Approved (Code A)
Approved as Noted (Code B)
Revise and Resubmit (Code C)
Rejected (Code D)

Reviewed by: Signature Date


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.