Professional Documents
Culture Documents
RAIGARH ENERGY
A 26
2
+2S
AB 2 O
-26
2
28 2 +2
C 26
+2
O +26
CD 28
UPPeR Cytmde 26
2%
D +26
- 2
D
+2
-28
+26
-26
2 +2
28 t2
t2
26
+2
28
+27 C
H 28
HT, T, 3JT Sheat pin brten
Remarks/Comments
Signature
Name & Signature
Name
Department
No
Satsh
hlan&
adani RAIGARH NEROY
OENERATION LIMITED (REGL)
(1x600MW, RAIGARH)
Nev, No./Date PROTOCOL
Area /Locatlon
01/01.08 2020 lue No/bal
DATE
01/0102 2017 EGL/GPM/t
Equipment
C41 Buneslilt
Observatilon clueckug
C0nestt ppylunde Punes Jitt cuc kaug
+30 -30
2
+30
-2
27
FC
30 O
G 23
28
t26
H -2
29
HT -29
+26
5
t30
Remarks/Comments
Name &Signature Signature
Department
S.No Name
aluh
ans
RAIGARH ENERGY GENERATION LIMITED (REGL)
adani (1x60OMW,RAIGARH)
PROTOCOL
Issue No/Date 01/01.02.2017
DATE
Doc..No.
Area /Location
Rev. No./Date 01/01.08.2020
REG/OPMIFIO7
Equipment
Observation-
R e m a r k s / C o m m e n t s
Signatue
Department
Name & Signature me
S.No
RAIGARH ENERGY
GENERATION LIMITED (REGL)
a 0 a n i
(1x600Mw, RAIGARH)
Rev. No./Date
01/01.08.2020 PROTOCOL
Issue No/Date 01/01.02.2017 DATE
Area /Location
Doc.No. o//2
REGL/OPN/F/07
E q u i p m e n t
ByN TiIt
0oservation
Coon 2
lenr - 3
Unaks
Ehuon Camrond
Remarks/Comments
AG -2S +2
O +2
+22
BC
+2
C O
O +T
CD 25
21 aLbove 0 dre
CD -22 Commad
D -22 20
DE -20 22
22
Remarks/Comments
Signature
Name & Signature
Name Department
S.No