Professional Documents
Culture Documents
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · TITLE PAGE SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 00
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS
Office of the Building Official
MECHANICAL
M00 - TITLE PAGE
- TABLE OF CONTENTS
N - LOCATION MAP
- VICINITY MAP
W E
M03 - GENERAL NOTES
2ND FLOOR
- LEGENDS & SYMBOLS
BIOSAFETY LAND USE AND ZONING
LABORATORY -AIRFLOW DIAGRAM
- SECTION A-A
ELECTRICAL ELECTRICAL
N
D I V ISIO
Y
LOG
HNO MECHANICAL
TEC
& BIO
M ENT
NV IRON
T-E
DOS
ELECTRONICS
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX
· SITE DEVELOPMENT PLAN
R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · TABLE OF CONTENTS SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 01
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
N
W E
PHILIPPINES
S
Makati
N Pasay
W E
S Taguig
Parañaque
LOCATION MAP
PHILIPPINE MAP
VICINITY MAP
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX
· PHILIPPINE MAP
R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · LOCATION MAP SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES · VICINITY MAP
M 02
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
GENERAL NOTES: MECHANICAL PROPOSED PLAN
SUPPLY AIR
BLOWER
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX
· GENERAL NOTES
R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · LEGENDS AND SYMBOLS SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES · AIRFLOW DIAGRAM
M 03
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000
SIDE TABLE
SIDE TABLE
3990
WORKBENCH
1200
WORKBENCH
WORKBENCH
3810
ELECTRICAL
3710
ROOM
C
4000 2000 2000 2000
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · 2ND FLOOR PLAN LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 04
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000
SIDE TABLE
SIDE TABLE
3990
WORKBENCH
5290
SIDE TABLE SIDE TABLE
9000
1200
WORKBENCH
WORKBENCH
3810
ELECTRICAL
3710
ROOM
C
4000 2000 2000 2000
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · SUPPLY AIR DUCT LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 05
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000
SIDE TABLE
SIDE TABLE
3990
WORKBENCH
5290
SIDE TABLE SIDE TABLE
9000
1200
WORKBENCH
WORKBENCH
3810
ELECTRICAL
3710
ROOM
C
4000 2000 2000 2000
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · EXHAUST AIR DUCT LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 06
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000
SIDE TABLE
SIDE TABLE
3990
WORKBENCH
5290
SIDE TABLE SIDE TABLE
9000
1200
WORKBENCH
WORKBENCH
3810
ELECTRICAL
3710
ROOM
C
4000 2000 2000 2000
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · COMBINED HVAC LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 07
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000
SIDE TABLE
SIDE TABLE
3990
WORKBENCH
5290
SIDE TABLE SIDE TABLE
9000
1200
WORKBENCH
WORKBENCH
3810
ELECTRICAL
3710
ROOM
C
4000 2000 2000 2000
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022 · EQUIPMENT LAYOUT
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION · SECTION A-A
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 08
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3 3 2 1
RETLIF-ERP
MUIDEM
PRIMARY
RETLIF
CARBON
FILTER
FILTER
RETLIF
APEH
CEILING LEVEL
2ND FLOOR
GROUND FLOOR
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022 · EQUIPMENT LAYOUT
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION · SECTION A-A
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 09
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
EXPLODED VIEW
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · HVAC MISCELLANEOUS DETAILS SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 10
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
DUCT REINFORCEMENT SCHEDULE
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · DUCT REINFORCEMENT SCHEDULE SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 11
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
1 2 3
10000
RETLIF-ERP
MUIDEM
PRIMARY
RETLIF
CARBON
RETLIF
FILTER
FILTER
APEH
A A
SIDE TABLE
SIDE TABLE
3990
WORKBENCH
5290
B B
1200
WORKBENCH
WORKBENCH
3810
ELECTRICAL
3710
ROOM
C C
4000 2000 2000 2000
APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT ---
DATE: SEP 02, 2022 · CONTROL PANEL POWER LAYOUT SHEET NO.
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
DESIGN AND INSTALL OF NEGATIVE · EQUIPMENT POWER LAYOUT
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
E 01
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022