You are on page 1of 13

PROPOSED PLAN

VIROLOGY LABORATORY-SUPPLY DESIGN


AND INSTALL OF NEGATIVE PRESSURE

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · TITLE PAGE SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 00
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS
Office of the Building Official

MECHANICAL
M00 - TITLE PAGE

M01 -SITE DEVELOPMENT PLAN

- TABLE OF CONTENTS

M02 - PHILIPPINE MAP DISTRICT/CITY/MUNICIPALITY

N - LOCATION MAP

- VICINITY MAP

W E
M03 - GENERAL NOTES
2ND FLOOR
- LEGENDS & SYMBOLS
BIOSAFETY LAND USE AND ZONING
LABORATORY -AIRFLOW DIAGRAM

S M04 - 2ND FLOOR PLAN LAYOUT

M05 - SUPPLY AIR DUCT LAYOUT

M06 - EXHAUST AIR DUCT LAYOUT

M07 - COMBINED HVAC LAYOUT ARCHITECTURAL

M08 - CP & MAGNEHELIC GAUGE LAYOUT

M09 - EQUIPMENT LAYOUT

- SECTION A-A

M10 - HVAC MISCELLANEOUS DETAILS


STRUCTURAL
M11 - DUCT REINFORCEMENT SCHEDULE

ELECTRICAL ELECTRICAL

E01 - CONTROL PANEL POWER LAYOUT

- EQUIPMENT POWER LAYOUT

N
D I V ISIO
Y
LOG
HNO MECHANICAL
TEC
& BIO
M ENT
NV IRON
T-E
DOS

ELECTRONICS

SITE DEVELOPMENT PLAN


SANITARY / PLUMBING

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX
· SITE DEVELOPMENT PLAN
R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · TABLE OF CONTENTS SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 01
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
N
W E
PHILIPPINES
S
Makati

N Pasay
W E

S Taguig

Parañaque

LOCATION MAP

PHILIPPINE MAP
VICINITY MAP

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX
· PHILIPPINE MAP
R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · LOCATION MAP SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES · VICINITY MAP

M 02
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
GENERAL NOTES: MECHANICAL PROPOSED PLAN

SUPPLY AIR
BLOWER

AIR FLOW DIAGRAM

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX
· GENERAL NOTES
R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · LEGENDS AND SYMBOLS SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES · AIRFLOW DIAGRAM

M 03
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000

5100 2820 2080

SIDE TABLE
SIDE TABLE

3990
WORKBENCH

5290 SIDE TABLE SIDE TABLE


9000

1200
WORKBENCH
WORKBENCH

3810
ELECTRICAL
3710

ROOM

C
4000 2000 2000 2000

2ND FLOOR PLAN LAYOUT

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · 2ND FLOOR PLAN LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 04
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000

5100 2820 2080

SIDE TABLE
SIDE TABLE

3990
WORKBENCH

5290
SIDE TABLE SIDE TABLE
9000

1200
WORKBENCH
WORKBENCH

3810
ELECTRICAL
3710

ROOM

C
4000 2000 2000 2000

SUPPLY AIR DUCT LAYOUT

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · SUPPLY AIR DUCT LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 05
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3

10000

5100 2820 2080

SIDE TABLE
SIDE TABLE

3990
WORKBENCH

5290
SIDE TABLE SIDE TABLE
9000

1200
WORKBENCH
WORKBENCH

3810
ELECTRICAL
3710

ROOM

C
4000 2000 2000 2000

EXHAUST AIR DUCT LAYOUT

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · EXHAUST AIR DUCT LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 06
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3

10000

5100 2820 2080

SIDE TABLE
SIDE TABLE

3990
WORKBENCH

5290
SIDE TABLE SIDE TABLE
9000

1200
WORKBENCH
WORKBENCH

3810
ELECTRICAL
3710

ROOM

C
4000 2000 2000 2000

COMBINED HVAC LAYOUT

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · COMBINED HVAC LAYOUT SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 07
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
1 2 3
10000

5100 2820 2080

SIDE TABLE
SIDE TABLE

3990
WORKBENCH

5290
SIDE TABLE SIDE TABLE
9000

1200
WORKBENCH
WORKBENCH

3810
ELECTRICAL
3710

ROOM

C
4000 2000 2000 2000

CP & MAGNEHELIC GAUGE LAYOUT

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022 · EQUIPMENT LAYOUT
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION · SECTION A-A
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 08
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN

1 2 3 3 2 1
RETLIF-ERP

MUIDEM

PRIMARY
RETLIF

CARBON
FILTER

FILTER
RETLIF
APEH

CEILING LEVEL

2ND FLOOR

GROUND FLOOR

EQUIPMENT LAYOUT SECTION A-A

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022 · EQUIPMENT LAYOUT
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION · SECTION A-A
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 09
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN

EXPLODED VIEW

HVAC MISCELLANEOUS DETAILS

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · HVAC MISCELLANEOUS DETAILS SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 10
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN
DUCT REINFORCEMENT SCHEDULE

DUCT REINFORCEMENT SCHEDULE

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 00
ARCHITECT --- SEP 02, 2022
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES DESIGN AND INSTALL OF NEGATIVE DATE: · DUCT REINFORCEMENT SCHEDULE SHEET NO.
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
M 11
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022
PROPOSED PLAN

1 2 3
1 2 3

10000

5100 2820 2080

RETLIF-ERP

MUIDEM

PRIMARY
RETLIF

CARBON
RETLIF

FILTER

FILTER
APEH
A A

SIDE TABLE
SIDE TABLE

3990
WORKBENCH
5290

SIDE TABLE SIDE TABLE


9000

B B

1200
WORKBENCH
WORKBENCH

3810
ELECTRICAL
3710

ROOM

TO SPARE CKT BREAKER


BY CLIENT

C C
4000 2000 2000 2000

CONTROL PANEL POWER LAYOUT EQUIPMENT POWER LAYOUT

APPROVED BY: CLIENT PROJECT TITLE CAD BY: R.SERASPE SHEET CONTENT REVISED NO.
CISCO ENGINEERING INDUSTRIES SEP 02, 2022
HVAC; AIR FILTRATION; CLEANROOM SYSTEMS; ELECTRO-MECHANICAL SYSTEMS; GENERAL CONSTRUCTION
DEPARTMENT OF SCIENCE
AND TECHNOLOGY
VIROLOGY LABORATORY-SUPPLY
DATE:
CHECKED BY: RONALD A. MOX R 01
ARCHITECT ---
DATE: SEP 02, 2022 · CONTROL PANEL POWER LAYOUT SHEET NO.
BLK. 7 LOT 2 & 4 AGUILA VILLAGE, TUNASAN, MUNTINLUPA CITY 1773, METRO MANILA, PHILIPPINES
ENVIRONMENT AND BIOTECHNOLOGY DIVISION
DESIGN AND INSTALL OF NEGATIVE · EQUIPMENT POWER LAYOUT
TEL.: (02)403-6872 TELEFAX: (02)403-6814 MOBILE: +63921-282-1000 / +63927-672-1001 PRESSURE APPROVED BY: SHERWIN B. MOLDES
E 01
REG NO.: PTR NO.: FACILITIES DIRECTOR
E-MAIL ADDRESS: ciscorp@outlook.com
DATE ISSUED: PLACE: LOCATION: 1st flr Saliksik Bldg Sikap St., DOST Compound, Gen.Santos Ave.,Bicutan,Taguig City DATE: SEP 02, 2022

You might also like