ROOF PLAN

WATER LINE LAYOUT

ISOMETRIC DIAGRAM(WATER LINE LAYOUT)

CHECKED ,SIGNED & SEALED BY :

ROOF STORM DRAINAGE LAYOUT MASTER PLUMBER / SANITARY ENGINEER


PRC No. PTR No.

Date Issued: Place issued:

PROJECT TITLE / LOCATION : DRAWN & PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL : APPROVED : SHEET CONTENT : SHEET NO.:

REPUBLIC OF THE PHILIPPINES CONVERGENCE & SPECIAL SUPPORT PROGRAM, BASIC


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE
REGION IV-A BUILDING / FACILITIES TO SUPPORT SOCIAL SERVICES, P-4
BATANGAS SECOND DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE BUILDING,
KUMINTANG ILAYA, BATANGAS CITY 31 38
BUCAL ELEMENTARY SCHOOL, JUNEIL RAY M. CHAVEZ ARIEL V. ARMEDILLA MEL HARVEY A. GONZALES SONIA D. PAGLICAUAN
BARANGAY BUCAL, BATANGAS CITY, BATANGAS ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ISOMETRIC DIAGRAM(SEWER & DRAINAGE LAYOUT)
CHECKED ,SIGNED & SEALED BY :

MASTER PLUMBER / SANITARY ENGINEER


PRC No. PTR No.

Date Issued: Place issued:

PROJECT TITLE / LOCATION : DRAWN & PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL : APPROVED : SHEET CONTENT : SHEET NO.:

REPUBLIC OF THE PHILIPPINES CONVERGENCE & SPECIAL SUPPORT PROGRAM, BASIC


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE
REGION IV-A BUILDING / FACILITIES TO SUPPORT SOCIAL SERVICES, P-5
BATANGAS SECOND DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE BUILDING,
KUMINTANG ILAYA, BATANGAS CITY 32 38
BUCAL ELEMENTARY SCHOOL, JUNEIL RAY M. CHAVEZ ARIEL V. ARMEDILLA MEL HARVEY A. GONZALES SONIA D. PAGLICAUAN
BARANGAY BUCAL, BATANGAS CITY, BATANGAS ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
r p
q

S²qr o
S²op
p q r m n o

r
LPB
LPB 3
1
LPB
p q r m n o LPB 4
LPB
2
S3Wr S
S²pq Sr S²mn So

S2pq WP

p q p q p

TO BE INTERCONNECTED
TO S3Wr @ GROUND FLOOR

2F POWER LAY-OUT
2F LIGHTING LAY-OUT

l
S
S k
S²kl
d e f a b c

MDP
j 4
LPA
3 ECB
LPA
1 "FACP"
LPA
d e f a b c 4
i LPA MCCB
LPA
S 2 S3Wr
S²de Sf S²ab Sc MDP
S²ij
S2gh LPA
WP
5

g h g h g

TO BE INTERCONNECTED
TO S3Wr @ SECOND FLOOR

GF POWER LAY-OUT
GF LIGHTING LAY-OUT

CHECKED ,SIGNED & SEALED BY :

PROFESSIONAL ELECTRICAL ENGINEER


PRC No. PTR No.

Date Issued: Place issued:

PROJECT TITLE / LOCATION : DRAWN & PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL : APPROVED: SHEET CONTENT : SHEET NO.:
REPUBLIC OF THE PHILIPPINES CONVERGENCE & SPECIAL SUPPORT PROGRAM, BASIC
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE
REGION IV-A BUILDING / FACILITIES TO SUPPORT SOCIAL SERVICES, E-1
BATANGAS II DISTRICT ENGINEERING OFFICE CONSTRUCTION OF MULTI-PURPOSE BUILDING,
KUMINTANG ILAYA, BATANGAS CITY BUCAL ELEMENTARY SCHOOL,
33 38
JAY M. VIVO ARIEL V. ARMEDILLA MEL HARVEY A. GONZALES SONIA D. PAGLICAUAN
BARANGAY BUCAL, BATANGAS CITY, BATANGAS ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
TO GROUNDING TO GROUNDING TO GROUNDING
SYSTEM@ GF SYSTEM@ GF SYSTEM@ GF

1X30mm2 BCW 1X30mm2 BCW 1X30mm2 BCW

COLUMN COLUMN
COLUMN COLUMN COLUMN COLUMN GROUNDING
GROUNDING GROUNDING

1X30mm2 BCW
GROUNDING GROUNDING GROUNDING

1X30mm2 BCW
COLUMN
GROUNDING
FS
COLUMN
TO GROUNDING GROUNDING B
SYSTEM@ GF

TO GROUNDING
SYSTEM@ GF
COLUMN COLUMN COLUMN COLUMN
COLUMN GROUNDING COLUMN
GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING

1X30mm2 BCW 1X30mm2 BCW 1X30mm2 BCW


TO GROUNDING TO GROUNDING TO GROUNDING
SYSTEM@ GF SYSTEM@ GF SYSTEM@ GF
2F FIRE ALARM LAY-OUT

2F GROUNDING LAY-OUT

1X30mm2 BCW GROUNDING ROD 1X30mm2 BCW GROUNDING ROD 1X30mm2 BCW GROUNDING ROD

COLUMN COLUMN COLUMN COLUMN COLUMN COLUMN


GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING
1X30mm2 BCW

1X30mm2 BCW
"FACP"

COLUMN
GROUNDING

COLUMN FS
GROUNDING ROD GROUNDING
B

COLUMN COLUMN COLUMN COLUMN COLUMN COLUMN


GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING

GROUNDING ROD 1X30mm2 BCW GROUNDING ROD 1X30mm2 BCW GROUNDING ROD
WITH GROUND WELL

CHECKED ,SIGNED & SEALED BY :

GF GROUNDING LAY-OUT GF FIRE ALARM LAY-OUT

PROFESSIONAL ELECTRICAL ENGINEER


PRC No. PTR No.

Date Issued: Place issued:

PROJECT TITLE / LOCATION : DRAWN & PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL : APPROVED: SHEET CONTENT : SHEET NO.:
REPUBLIC OF THE PHILIPPINES CONVERGENCE & SPECIAL SUPPORT PROGRAM, BASIC
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE
REGION IV-A BUILDING / FACILITIES TO SUPPORT SOCIAL SERVICES, E-2
BATANGAS II DISTRICT ENGINEERING OFFICE CONSTRUCTION OF MULTI-PURPOSE BUILDING,
KUMINTANG ILAYA, BATANGAS CITY BUCAL ELEMENTARY SCHOOL,
34 38
JAY M. VIVO ARIEL V. ARMEDILLA MEL HARVEY A. GONZALES SONIA D. PAGLICAUAN
BARANGAY BUCAL, BATANGAS CITY, BATANGAS ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CEILING LEVEL

H E I G H T S
S S S
B B
20mmØ C

FS
20mmØ C

SECOND FLOOR LEVEL


TO "FACP" @ GF
S S S
B B

V E R I F Y
20mmØ C
NOTE:
FS
HASHMARKS DENOTE "FACP"
NUMBER OF 2.0mm² THWN2

LPA - 6
GROUND FLOOR LEVEL
FINISHED GRADE LINE 20mmØ C

TO "FACP"

FIRE ALARM AND


DETECTION RISER DIAGRAM FIRE EXTINGUISHER HEIGHT

CEILING LEVEL

H E I G H T S
"LPB"

2 - 14mm² THWN₂ + 1 - 8.0mm² THWN₂(G) 1 - 5.5mm² THWN₂ GROUNDING WIRE


in 32mm Ø uPVC in 20mmØ C

TO "MDP"- 5
SECOND FLOOR LEVEL
TO BE CONNECTED TO EXISTING
POWER SUPPLY (230VOLTS, 2 - 50mm² THWN₂ + 1 -38mm²
1-PHASE, 60Hz., AC) OR NEW

V E R I F Y
THWN₂(G) in 50mm Ø RSC
UPGRADED POWER SUPPLY
(VERIFY)

"MCCB" "MDP" "LPA" "ECB"


2 - 50mm² THWN₂ + 1 -38mm² 2 - 14mm² THWN₂ 1 - 8.0mm² THWN₂ 2 - 14mm² THWN₂ +
THWN₂(G) in 50mm Ø uPVC + 1 - 8.0mm² GROUNDING WIRE 1 - 8.0mm²
THWN₂(G) in in 20mmØ C THWN₂(G) in 32mm
32mm Ø uPVC Ø uPVC
GROUND FLOOR LEVEL
FINISHED GRADE LINE

1 - 38mm² THWN₂ GROUNDING WIRE in 20mmØ C -


TO BE CONNECTED TO GROUND BAR USING
CRIMP TYPE TERMINAL LUG

CHECKED ,SIGNED & SEALED BY :


RISER DIAGRAM

PROFESSIONAL ELECTRICAL ENGINEER


SCHEDULE OF LOADS PRC No. PTR No.

Date Issued: Place issued:

PROJECT TITLE / LOCATION : DRAWN & PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL : APPROVED: SHEET CONTENT : SHEET NO.:
REPUBLIC OF THE PHILIPPINES CONVERGENCE & SPECIAL SUPPORT PROGRAM, BASIC
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE
REGION IV-A BUILDING / FACILITIES TO SUPPORT SOCIAL SERVICES, E-3
BATANGAS II DISTRICT ENGINEERING OFFICE CONSTRUCTION OF MULTI-PURPOSE BUILDING,
KUMINTANG ILAYA, BATANGAS CITY BUCAL ELEMENTARY SCHOOL,
35 38
JAY M. VIVO ARIEL V. ARMEDILLA MEL HARVEY A. GONZALES SONIA D. PAGLICAUAN
BARANGAY BUCAL, BATANGAS CITY, BATANGAS ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER