This work method statement outlines the procedures for conducting a pull out test on soil nails at the Royal Museum Landslide Repair Site in Kuala Lumpur. It details the scope of work including selecting test points, preparing the test setup with reaction plates and hydraulic jacks, and conducting the pullout test according to British standards. The document also specifies the materials, location, manpower, equipment, and health and safety requirements for performing the pull out test.

Uploaded by

fendi brsb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
376 views7 pages

MST Pull Out Test

This work method statement outlines the procedures for conducting a pull out test on soil nails at the Royal Museum Landslide Repair Site in Kuala Lumpur. It details the scope of work including selecting test points, preparing the test setup with reaction plates and hydraulic jacks, and conducting the pullout test according to British standards. The document also specifies the materials, location, manpower, equipment, and health and safety requirements for performing the pull out test.

Uploaded by

fendi brsb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

WISE CONTROL SDN BHD

WORK METHOD STATEMENT

PULL OUT TEST

JKR/PERS/CKC/011/2023
PEMBAIKAN RUNTUHAN CERUN MUZIUM DIRAJA, KUALA
LUMPUR.

Revision : 00
Date Issued : 05/03/2024

Prepared by Checked by

Company/ UJI TEGUH M. Affandie Bin Mat


Name
Specialist RESOURCES Shahri

Name Iswan Position Project Manager

WISE CONTROL SDN BHD Page 1 of 7


PULL OUT TEST Revision: 00

Table of Contents

No Title Pages

# REVISION HISTORY 3
1. SCOPE OF WORKS 4-6
2. MATERIAL 7
3. LOCATION 7
4. MANPOWER 7
5. MACHINERY/PLANT/EQUIPMENT 7
6. HEALTH & SAFETY 7

WISE CONTROL SDN BHD Page 2 of 7


PULL OUT TEST Revision: 00

REVISION HISTORY

REVISION NO. ISSUE DATE DETAILS OF REVISION

00 05/03/2023 Initial Draf t

WISE CONTROL SDN BHD Page 3 of 7


PULL OUT TEST Revision: 00

1 SCOPE OF WORK

1.1 Selection of T est Points

The location of test points for the pull out test shall be selected by the engineer
before testing works start.

1.2 Preparation

I. A large thick steel plate with a center hole shall be used as a reaction plate
over the surface of the slope. The pullout of the anchor shall be in exact
Parallel Direction of the nail into the slope. This is achieve by the preparation
of a Concrete Pad and additional Adjustment Plate to achieve an Exact
Perpendicular Surface to the bar for the bottom of the Hydraulic Hollow Jack
to sit on.

II. Specification detail of the jack must be provided showing the effective area of
the Hydraulic Cylinder Ram.

III. A Calibrated Load Cell with enough capacity must be used as a


Primary Load Reference.

IV. A Calibrated Pressure Gauge with enough capacity must also be used as a
Secondary Load Reference. At least 3 Calibrated Dial Gauge with 0.01 mm
accuracy must be use over the surface of the reference plate

V. The overall setup of the equipment arrangement for the Pullout Test is as shown
in below Figure 1

1.3 The Pullout Test

I. A Connecting Coupler shall be used to extend the anchor to accommodate


the equipment installed.

II. The loading sequence of the Pullout test shall be according to:
BS8081 : 1989 (refer to Table 1)

III. The Acceptance Criteria of the Pullout Test and the termination of the test
shall be determined by the engineer at site.

WISE CONTROL SDN BHD Page 4 of 7


PULL OUT TEST Revision: 00

Figure 1: Detail Layout of the Pullout Test

WISE CONTROL SDN BHD Page 5 of 7


PULL OUT TEST Revision: 00

1.4 Method of Calculation

The pressure value of a hydraulic jack at a specific load with a hydraulic jack specific
Ram Area is calculated as below

WISE CONTROL SDN BHD Page 6 of 7


PULL OUT TEST Revision: 00

2 MATERIAL

-Not Applicable-

3 LOCATION
• Location 1, Surau, Soil Nail ( 2 points )
• Location 3, Kolam/Tasik, Soil Nail,(5 points)

4 MANPOWER

1 Site Supervisor Planning, Coordination, Supervising


construction and installation activities.

2 Test Operator Operating test


3 General worker Carrying out test to assist operator

5 MACHINERY/PLANT/EQUIPMENT

1 Connecting Coupler
2 Pressure Gauge
3 Dial Gauge
4 Plate
5 Digimatic Indicator c/w Load cell
6 Hydraulic Pump

6 HEALTH & SAFETY

1 Safety Supervisor Implementing site safety procedure at site.


(PPE, CIDB, Traffic Management, Warning
signs).

WISE CONTROL SDN BHD Page 7 of 7