process segment : scope :

Ammonia1 & Ammonia2 INTENT: Change failure close to failure last position for the valves
HP steam import

what if consequences scenarios

1.1.Severe Steam shortage , process upset


for HP steam turbines and ammonia plant
1.What if the control valve fails trip ,
close 1.2. High pressure in HP steam header
from power plant possible loss of
cotainement possibility of injury

2.What if the control valve fail 2.1.No control over the HP steam import
in place flow process upset for HP steam turbines
close to failure last position for the valves FV103019 & FV203019

consequence cateogry

1.1.1. production loss

1.2.1.Health and safety

2.1.1. production loss


ves FV103019 & FV203019

Consequence Level (C)


safeguards / or protective
barriers.

1.1.1.1.no safety concern

1.2.1.1. BPCS and safety valves RV085

2.1.1.1.no safety concern


Probability Level (P) Resulting Risk Level (R)

1
what-if Analysis

major findings and recommendations

1.1.1.1.1.PM of the control vale

1.2.1.1.1.performance tests of the safety valves