BUILDING TECHNOLOGY 4

QUANTITY SURVEYING

PREPARED BY: ARCH. MARLA SHIELA JOY C. MENDOZA


COLLEGE OF ARCHITECTURE

QUANTITY SURVEYING
OF CONCRETE
COLLEGE OF ARCHITECTURE

SAMPLE
STRUCTURAL PLAN
COLLEGE OF ARCHITECTURE
COLLEGE OF ARCHITECTURE

FTB 3

FTB 1
FTB 2
FTB 4
COLLEGE OF ARCHITECTURE
COLLEGE OF ARCHITECTURE

HOW TO CALCULATE CEMENT, SAND &


GRAVEL QUANTITIES
COLLEGE OF ARCHITECTURE

HOW TO DETERMINE
WHAT CLASS OF
CONCRETE TO USE?
COLLEGE OF ARCHITECTURE

CONCRETE MIXTURE PROPORTION


COLLEGE OF ARCHITECTURE TOTAL FOOTING CUM = 2.8 CUM

Compute using 40kg cement Class A mixture

FORMULA
[Reference: Max Fajardo Jr, Simplified Construction Estimate with
approximately 15% contingency]

CEMENT: cum x cement proportion


CEMENT = 2.8 cum x 9 = 25.2 bags

SAND: cum x sand proportion


SAND = 2.8 cum x 0.5 = 1.4 cum

GRAVEL: cum x gravel proportion


GRAVEL = 2.8 cum x 1 = 2.8 cum
COLLEGE OF ARCHITECTURE

QUANTITY SURVEYING
OF ROUGH MASONRY
COLLEGE OF ARCHITECTURE

CHB SIZE: 0.20M x 0.40M


AREA = 0.08 SQM

WALL SIZE: 3.5M x 4.5M


AREA = 15.75 SQM

HOW MANY CHB WILL YOU


NEED FOR THIS WALL?

ANSWER: 196.875 PCS or 197 PCS


COLLEGE OF ARCHITECTURE

0.003/ pc 0.0005/ pc

0.006/ pc 0.0008/ pc

OR 13 PCS

You can also use this using by area method.


COLLEGE OF ARCHITECTURE

Computing for Mortar Fill

Mortal Fill = Pcs of CHB x 0.003 (constant for 4” CHB, 4 cores) 0.003/ pc 0.0005/ pc

Example: 197 pcs x 0.003 cu.m – 0.591 cu.m

0.006/ pc 0.0008/ pc
Computing Block Laying Mortar

Block Laying Mortar = Pcs of CHB x 0.0005 (constant for 4” CHB, 4 cores)

Example: 197 pcs x 0.0005 cu.m – 0.0985 cu.m

Computing for Plastering

Plastering of Wall = ¾” or 19mm or 0.019m

Plastering of Wall = Area x 2 (both sides)

Example: (15.75 sqm x 2) x 0.019m = 0.5985 cu.m

Total Plastering of Wall = 0.5985 cu.m


COLLEGE OF ARCHITECTURE

SUMMARY
0.003/ pc 0.0005/ pc
Total Mortal & Block Laying = 0.6895 cu.m
Total Plastering of Wall = 0.5985 cu.m

Total = 1.288 cu.m 0.006/ pc 0.0008/ pc

Computing for Number of Cement Bags & Sand using Class B Mixture
Cement Bags = Total Volume x 12 (constant factor)
Sand = Total Volume x1 (constant factor)

Example:

Cement Bags = 1.288 cu.m x 12 = 15.456 bags o6 16 bags


Sand = 1.288 cu.m x1 = 1.288 cu.m
CHB REBAR ESTIMATE
COLLEGE OF ARCHITECTURE

VERTICAL BAR
4.5 M SPACING = 0.60 M
HORIZONTAL BAR
SPACING = EVERY 2
LAYER

FOR EVERY 1 SQM OF CHB = 5 METER REBAR

Formula by Area Method:

Wall = L x W = total sqm of CHB


Length (RSB) = total sqm of CHB x 5mtrs + 10% allowance for splicing
Total pcs of RSB = Length (RSB) / 6mtrs (commercial length of RSB per pc)
COLLEGE OF ARCHITECTURE

QUANTITY SURVEYING
OF STEEL & OTHER METALS
COLLEGE OF ARCHITECTURE

1000 MM
1500 MM
COLLEGE OF ARCHITECTURE
KEY PLAN

COLUMN

200 MM

200 MM
TOP BAR

BOTTOM BAR
75 MM 850 MM 75 MM
CONCRETE COVER
FOOTING ESTIMATE
COLLEGE OF ARCHITECTURE

ESTIMATING IN KGS.
COLLEGE OF ARCHITECTURE

ESTIMATING IN PCS.
COLLEGE OF ARCHITECTURE 40 MM 40 MM
CONCERETE COVER

12MM MAIN BAR


10MM MAIN BAR
TOP BAR

BOTTOM BAR

COLUMN ESTIMATE
COLLEGE OF ARCHITECTURE

REBAR SPLICING
COLLEGE OF ARCHITECTURE
40 MM
40 MM
CONCERETE COVER

STIRRUP ESTIMATE
COLLEGE OF ARCHITECTURE

QUANTITY SURVEYING
OF STEEL & OTHER METALS
COLLEGE OF ARCHITECTURE

ROOFING ESTIMATE
COLLEGE OF ARCHITECTURE

TYPES OF ROOF
COLLEGE OF ARCHITECTURE RECOMMENDED THICKNESS FOR ROOF IS 0.6MM OR GA. 24

RIB TYPE CORRUGATED


COLLEGE OF ARCHITECTURE

SAMPLE ROOF PLAN


COLLEGE OF ARCHITECTURE

DIRECT COUNTING
METHOD
COLLEGE OF ARCHITECTURE

DIRECT COUNTING METHOD TYPICAL THICKNESS FOR


RIB TYPE ROOF GUTTER IS 0.4MM OR GA. 26
Standard length of gutter = 8FT or 2.44 M
No. of Rib Type Roof 4ft x 17FT = 14 PCS x 2 =
Use 2.2M as effective length
28 PCS 0.6MM x 4FT x 17FT Rib Type Roof

GUTTER – 24”
Compute for all sides with gutter:
TYPICAL THICKNESS FOR
14M x 2 = 28M + 10M x 2 = 20M GUTTER IS 0.6MM OR GA. 24
Total of 48M divide by 2.2M = 21.8 OR 22 PCS

22 PCS 0.4MM x 24” x 8FT Box Type Gutter

RIDGE ROLL – 18”


Compute for all sides with ridge roll:

7.071 x 4 = 28M + 4M = 20M


Total of 32.28M divide by 2.2M = 14.66 OR 15 PCS

15 PCS 0.6MM x 18” x 8FT Ridge Roll


COLLEGE OF ARCHITECTURE

DIRECT COUNTING METHOD


This is simply counting the number of vertical & horizontal member from a detailed plan.

ROOF TRUSS ESTIMATE


COLLEGE OF ARCHITECTURE

QUANTITY SURVEYING
OF PAINT & OTHER APPLIED FINISHES
COLLEGE OF ARCHITECTURE

PAINT COVERAGE & CONVERSION


1 GAL PAINT = 25 SQM
1 TIN = 4 GALLONS
1 TIN = 16 LITERS
1 GAL = 4 LITERS
1 LITER = 2 PINTS
COLLEGE OF ARCHITECTURE

SAMPLE COMPUTATION
WALL PAINTING:

1 COAT FOR PRIMER


2-3 COATS FOR FINISH
COLLEGE OF ARCHITECTURE

DRYWALL PARTITION
COLLEGE OF ARCHITECTURE

WALL FINISHES
COLLEGE OF ARCHITECTURE