V = 4+7.68
V = 11.68 cubic meters
BEAM
GIRDER
40
25
Using 40kg Cement class A mixture
40 60
Cement:11.68x 9.0 = 105.12 bags
Sand: 11.686x 0.50 = .5.56cu.m
Gravel: 11..68 x 1.0 = 11.68 cu.m
BEAM GIRDER
By Linear meter Find the length of the beam
5pcs x 8.00m = 40.00 meters
method Refer to table of beam and girder column
size 25x40cm under 40kg class A
GIRDER concrete
Cement:40x 9.0 = 36 bags
16.00M Sand: 40x 0.050 = 2 cu.m
Gravel: 40x .100 = 4 cu.m
8.00M
Summarized
GIRDER Cement:36+69.12 = 105.12 or 106bags
Sand: 2+3.84 = 5.84cu.m
40 Gravel: 4 x 7.68 = 11.68 cu.m
25
40 60
BEAM GIRDER
QUANTITY OF CEMENT, SAND and GRAVEL FOR POST
BEAM AND GIRDER PER METER LENGHT
ESTIMATE
(STIRRUPS FOR BEAM AND
GIRDER)
Specify the use of 10mm open stirrups
spaced as shown. If there are 16 beams
with same design, find the materials
required for the stirrups
SOLUTION:
- Direct counting
6/1.00 = 6pieces
Stirrups on Beam
ESTIMATE
(One way Slab and Two way slab)
In reinforced concrete construction, the slab is an extensively used
structural element forming floors and roofs. A concrete slab is the
plane element having the depth d much smaller than
its span and width.
Types of Slabs
Slabs are classified according to the system of supports as:
1. One-way slabs,
2. Two-way slabs,
3. Flat slabs supported directly on the column
without beams,
4. Circular and non-rectangular slabs,
5. Grid or Waffle slabs.
One way Slab
Reinforced Bar can be computed
1. Direct Counting
2. Area Method
31.35 x .228=
7.15 or 8kg #16 GI
wires
Two way slab
ESTIMATE
(FORMS, SCAFFOLDINGS AND
STAGING)
Plywood thickness: 4, 6,12, 20, 25mm
f3
f3 f3
1 2 2
1 1
1
B2 - girder